Removal of the NLG main door control rod
TASK 32-31-41-000-001-A
Removal of the NLG main door control rod
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 32-31-41-941-050-A
Subtask 32-31-41-020-050-A
[Rev.10 from 2021]
2026.04.01 00:45:19 UTC
Removal of the NLG main door control rod
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-22-00-010-001-A | Nose Gear Doors - Ground Doors Opening |
Subtask 32-31-41-941-050-A
A. Safety Precautions
(1) In the cockpit, on the panel 400VU, put WARNING NOTICE(S) to tell persons not to operate the landing gear control lever.
(2) Put the SAFETY BARRIER(S) in position.
Subtask 32-31-41-010-050-A (1) In the cockpit, on the panel 400VU, put WARNING NOTICE(S) to tell persons not to operate the landing gear control lever.
(2) Put the SAFETY BARRIER(S) in position.
B. Get Access
(1) Open the NLG doors (Ref. AMM TASK 32-22-00-010-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the related NLG door.
4. Procedure(1) Open the NLG doors (Ref. AMM TASK 32-22-00-010-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the related NLG door.
Subtask 32-31-41-020-050-A
A. Removal of the Control Rod
(1) Remove the cotter pin (10) and discard it, remove the nut (11) and the washer (9).
(2) Remove the bolt (7) and disconnect the rod (4).
(3) Remove the cotter pin (1) and discard it, remove the nut (2) and the washer (3).
(4) Remove the bolt (6) and disconnect the rod (4).
(5) Remove the rod (4).
(1) Remove the cotter pin (10) and discard it, remove the nut (11) and the washer (9).
(2) Remove the bolt (7) and disconnect the rod (4).
(3) Remove the cotter pin (1) and discard it, remove the nut (2) and the washer (3).
(4) Remove the bolt (6) and disconnect the rod (4).
(5) Remove the rod (4).
Removal/Installation of the NLG main door control rod