Removal of the NLG Uplock Assy
TASK 32-31-21-000-001-A
Removal of the NLG Uplock Assy
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 32-31-21-860-050-A
Subtask 32-31-21-020-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:44:45 UTC
Removal of the NLG Uplock Assy
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | CONTAINER 5 L (1.32 USGAL) |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 124 | NOSE GEAR WELL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-22-00-010-001-A | Nose Gear Doors - Ground Doors Opening |
Subtask 32-31-21-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001)
(2) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001)
Subtask 32-31-21-010-050-A (1) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001)
(2) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001)
B. Get Access
(1) Open the doors of the nose landing gear (Ref. AMM TASK 32-22-00-010-001).
(2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position in zone 123.
Subtask 32-31-21-941-050-A (1) Open the doors of the nose landing gear (Ref. AMM TASK 32-22-00-010-001).
(2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position in zone 123.
C. Safety Precautions
(1) In the cockpit, on the panel 400VU, put WARNING NOTICE(S) in position to tell persons not to operate the landing gear control lever.
(2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
(4) Put a CONTAINER 5 L (1.32 USGAL) in position below the NLG uplock assy (2530GM).
(5) Obey the applicable safety precautions before you open the LGCIU circuit breakers (Ref. AMM TASK 32-00-00-860-001).
Subtask 32-31-21-865-050-A (1) In the cockpit, on the panel 400VU, put WARNING NOTICE(S) in position to tell persons not to operate the landing gear control lever.
(2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
- on the panel 40VU in the cockpit,
- on the ground service panel of the Green hydraulic system, access door (197CB).
(4) Put a CONTAINER 5 L (1.32 USGAL) in position below the NLG uplock assy (2530GM).
(5) Obey the applicable safety precautions before you open the LGCIU circuit breakers (Ref. AMM TASK 32-00-00-860-001).
D. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
Subtask 32-31-21-020-052-A ** ON A/C NOT FOR ALL
A. Removal of the NLG Uplock Assy
(2) Disconnect the hydraulic lines (10) and (11) and put PLUG - BLANKING on the disconnected ends.
(3) Remove and discard the cotter pin (27). Remove the nut (26) and the washer (25)
(4) Remove the screw (20) and disconnect the rod (23).
(5) Remove and discard the cotter pin (13). Remove the nut (14), the washer (15) and the screw (17).
(6) Remove the lever (16).
(7) Remove and discard the cotter pins (3) and (4). Remove the nuts (2) and (5) and the washers (1) and (6).
(8) Remove the screws (28) and (29), the uplock assy (12) and the washers (7).
Subtask 32-31-21-020-052-B ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT THE NLG DOWNLOCK SAFETY PIN AND THE TWO DOOR SAFETY PINS ARE INSTALLED.
(1) Disconnect the electrical connectors (8) and (9) and put CAP - BLANKING on the disconnected ends. (2) Disconnect the hydraulic lines (10) and (11) and put PLUG - BLANKING on the disconnected ends.
(3) Remove and discard the cotter pin (27). Remove the nut (26) and the washer (25)
(4) Remove the screw (20) and disconnect the rod (23).
(5) Remove and discard the cotter pin (13). Remove the nut (14), the washer (15) and the screw (17).
(6) Remove the lever (16).
(7) Remove and discard the cotter pins (3) and (4). Remove the nuts (2) and (5) and the washers (1) and (6).
(8) Remove the screws (28) and (29), the uplock assy (12) and the washers (7).
A. Removal of the NLG Uplock Assy
(2) Disconnect the hydraulic lines (10) and (11) and put PLUG - BLANKING on the disconnected ends.
(3) Remove and discard the cotter pin (27). Remove the nut (26) and the washer (25)
(4) Remove the screw (20) and disconnect the rod (23).
(5) Remove and discard the cotter pin (13). Remove the nut (14), the washer (15) and the screw (17).
(6) Remove the lever (16).
(7) Remove and discard the cotter pins (3) and (4). Remove the nuts (2) and (5) and the washers (1) and (6).
(8) Remove the screws (28) and (29), the uplock assy (12).
WARNING:
MAKE SURE THAT THE NLG DOWNLOCK SAFETY PIN AND THE TWO DOOR SAFETY PINS ARE INSTALLED.
(1) Disconnect the electrical connectors (8) and (9) and put CAP - BLANKING on the disconnected ends. (2) Disconnect the hydraulic lines (10) and (11) and put PLUG - BLANKING on the disconnected ends.
(3) Remove and discard the cotter pin (27). Remove the nut (26) and the washer (25)
(4) Remove the screw (20) and disconnect the rod (23).
(5) Remove and discard the cotter pin (13). Remove the nut (14), the washer (15) and the screw (17).
(6) Remove the lever (16).
(7) Remove and discard the cotter pins (3) and (4). Remove the nuts (2) and (5) and the washers (1) and (6).
(8) Remove the screws (28) and (29), the uplock assy (12).
NLG Uplock Assy