W DOC AIRBUS | AMM A320F

Installation of the Safety Valve Manifold Assembly


TASK 32-31-19-400-802-A
Installation of the Safety Valve Manifold Assembly


WARNING: MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 744
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in ) T
No specific
Torque wrench: range to between 3.2 and 2.9 m.daN (23.60 and 21.39 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.04SAB2)
Varnish Polyurethane-- Marking Structure
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
744
MAIN DOOR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 32-00-00-860-001-A
Flight Configuration Precautions with Electrical Power
TASK 32-00-00-860-001-A-01
Flight Configuration Precautions without Electrical Power
TASK 32-00-00-860-002-A
Ground Configuration after Flight Configuration with Electrical Power
TASK 32-00-00-860-002-A-01
Ground Configuration after Flight Configuration without Electrical Power
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
TASK 32-31-00-710-002-A
Operational Test of the Landing Gear Doors (With False Targets)
TASK 32-31-00-710-002-A-01
Operational Test of the Landing Gear Doors (Without False Targets)
TASK 32-51-00-720-003-A
Functional Test of the Nose Wheel Steering with the Handwheel
TASK 51-75-13-916-002-A
Repair to a layer of Corrosion Preventive Compound
3. Job Set-up
Subtask 32-31-19-860-054-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
   (2) Make sure that the aircraft electrical circuits are de-energized (Ref. AMM TASK 24-41-00-862-002) or the flight configuration precautions were obeyed (Ref. AMM TASK 32-00-00-860-001).
   (3) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
   (4) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (5) Make sure that the warning notices are in position to tell persons not to pressurize the Green hydraulic system:
  • On panel 40VU in the cockpit
  • On the ground panel of the Green hydraulic system.
Subtask 32-31-19-865-054-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
Subtask 32-31-19-560-051-A
C. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
4. Procedure
Subtask 32-31-19-420-052-A
A. Installation of the Safety Valve Manifold Assembly
   (1) Put the manifold assembly (1) in position on the aircraft structure and install the washers (5), the bolts (4) and the nuts (6).
   (2) TORQUE the bolts (4) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in ) T and mark them with a line of Varnish Polyurethane-- Marking Structure (Material No.04SAB2) .
   (3) Remove the PLUG-BLANKING from each disconnected line end.
   (4) Connect the hydraulic pipe unions (2), (3), (7) and (8) and TORQUE them to between 3.2 and 2.9 m.daN (23.60 and 21.39 lbf.ft ) T.
   (5) Mark the pipe connections with a line of Varnish Polyurethane-- Marking Structure (Material No.
04SAB2) .
Subtask 32-31-19-860-055-A
B. Preparation for Test
   (1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
   (2) If the flight configuration precautions were obeyed, put the aircraft back to the serviceable condition (Ref. AMM TASK 32-00-00-860-002).
   (3) Remove the container.
   (4) Remove the WARNING NOTICE(S).
   (5) Remove the access platform(s).
   (6) Close the left MLG door (Ref. AMM TASK 32-12-00-410-001).
   (7) If necessary fill the reservoir of the Green hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
Subtask 32-31-19-865-055-A
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
Subtask 32-31-19-710-053-A ** ON A/C NOT FOR ALL
D. Test of the Safety Valve Manifold Assembly
   (1) Do the operational test of the landing gear doors (Ref. AMM TASK 32-31-00-710-002).
   (2) Do the functional test of the nose wheel steering (Ref. AMM TASK 32-51-00-720-003).
   (3) Open the left MLG door (Ref. AMM TASK 32-12-00-010-001).
   (4) Make sure that there is no hydraulic fluid leakage from the safety valve manifold assembly (1).
Subtask 32-31-19-710-053-B ** ON A/C NOT FOR ALL
D. Test of the Safety Valve Manifold Assembly
   (1) Do the operational test of the landing gear doors (Ref. AMM TASK 32-31-00-710-002).
   (2) Open the left MLG door (Ref. AMM TASK 32-12-00-010-001).
   (3) Make sure that there is no hydraulic fluid leakage from the safety valve manifold assembly (1).
5. Close-up
Subtask 32-31-19-410-052-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Apply corrosion preventive compound to the heads of the bolts (4) and the adjacent area (Ref. AMM TASK 51-75-13-916-002).
   (3) Remove the access platform(s).
   (4) Close the left MLG door (Ref. AMM TASK 32-12-00-410-001).
   (5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.01 00:44:44 UTC