Installation of the Safety Valves


TASK 32-31-19-400-001-A
Installation of the Safety Valves


WARNING: MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 744
FIN: 2629GM
FIN: 2630GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.7 and 0.6 m.daN (61.95 and 53.10 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
(Material No.04JMD9)
Top Coat Polyurethane-- Decorative Furnishing
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
744
MAIN DOOR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
2
SEALS
AIPC 32-31-03-36-120
3
BACK-UP RINGS
AIPC 32-31-03-36-130
5
BACK-UP RINGS
AIPC 32-31-03-36-140
6
PACKINGS
AIPC 32-31-03-36-150
2
SEALS
AIPC 32-31-83-36-110
3
BACK-UP RINGS
AIPC 32-31-83-36-120
5
BACK-UP RINGS
AIPC 32-31-83-36-130
6
PACKINGS
AIPC 32-31-83-36-140
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 20-23-21-911-001-A
Removal/Installation of the Bobbins from their Housings and Installation of O-rings, Square Seals, and Back-up Rings on the Bobbins
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 32-00-00-860-001-A
Flight Configuration Precautions with Electrical Power
TASK 32-00-00-860-001-A-01
Flight Configuration Precautions without Electrical Power
TASK 32-00-00-860-002-A
Ground Configuration after Flight Configuration with Electrical Power
TASK 32-00-00-860-002-A-01
Ground Configuration after Flight Configuration without Electrical Power
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
TASK 32-31-00-710-002-A
Operational Test of the Landing Gear Doors (With False Targets)
TASK 32-31-00-710-002-A-01
Operational Test of the Landing Gear Doors (Without False Targets)
TASK 32-51-00-720-003-A
Functional Test of the Nose Wheel Steering with the Handwheel
TASK 51-75-13-916-002-A
Repair to a layer of Corrosion Preventive Compound
3. Job Set-up
Subtask 32-31-19-860-051-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
   (2) Make sure that the aircraft electrical circuits are de-energized (Ref. AMM TASK 24-41-00-862-002) or the flight configuration precautions were obeyed (Ref. AMM TASK 32-00-00-860-001).
   (3) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
   (4) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (5) Make sure that the warning notices are in position to tell persons not to pressurize the Green hydraulic system:
  • On the panel 40VU in the cockpit
  • On the ground panel of the Green hydraulic system.
Subtask 32-31-19-865-052-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
Subtask 32-31-19-560-050-B
C. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (5) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new packings (6) and the new back-up rings (5).
   (6) If necessary, apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new seals (2) and the new back-up rings (3).
4. Procedure
Subtask 32-31-19-420-051-B
A. Installation of the Valves (1) and (7) on the Manifold Assy (8)
   (1) Remove the blanking plugs.
   (2) If removed, install the new AIPC 32-31-03-36-130 BACK-UP RINGS (3) or AIPC 32-31-83-36-120 BACK-UP RINGS (3) and the new AIPC 32-31-03-36-120 SEALS (2) or AIPC 32-31-83-36-110 SEALS (2) on the bobbins (4) and install the bobbins (4) in the manifold (8) (Ref. AMM TASK 20-23-21-911-001).
   (3) Remove the blanking plugs.
   (4) Install the new AIPC 32-31-03-36-140 BACK-UP RINGS (5) or AIPC 32-31-83-36-130 BACK-UP RINGS (5) and the new AIPC 32-31-03-36-150 PACKINGS (6) or AIPC 32-31-83-36-140 PACKINGS (6) on the bobbins (4) (Ref. AMM TASK 20-23-21-911-001).
   (5) Put the safety valves (1) and (7) in position on the manifold (8).
NOTE: When you install the valves (1) and (7), you must not damage the packings (6).
   (6) Install the bolts (10) and the washers (9).
   (7) Install the bolts (11) and the washers (9).
   (8) TORQUE the bolts (10) and (11) to between 0.7 and 0.6 m.daN (61.95 and 53.10 lbf.in ) T.
   (9) Make a mark with Top Coat Polyurethane-- Decorative Furnishing (Material No.
04JMD9) on the bolts (10) and (11).
Subtask 32-31-19-860-052-A
B. Preparation for Test
   (1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
   (2) If the flight configuration precautions were obeyed, put the aircraft back to the serviceable condition (Ref. AMM TASK 32-00-00-860-002).
   (3) Remove the container.
   (4) Remove the WARNING NOTICE(S).
   (5) Remove the access platform(s).
   (6) Close the left MLG door (Ref. AMM TASK 32-12-00-410-001).
   (7) If necessary fill the reservoir of the Green hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
Subtask 32-31-19-865-053-A
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
Subtask 32-31-19-710-051-A
D. Test of the Valves and Manifold Assy
   (1) Do the operational test of the landing gear doors (Ref. AMM TASK 32-31-00-710-002).
   (2) Do the functional test of the nose wheel steering (Ref. AMM TASK 32-51-00-720-003).
   (3) Open the left MLG door (Ref. AMM TASK 32-12-00-010-001).
   (4) Make sure that there is no hydraulic fluid leakage from the safety valves 2629GM and 2630GM.
5. Close-up
Subtask 32-31-19-410-050-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Apply corrosion preventive compound to the heads of the bolts (10) and (11) and the adjacent area (Ref. AMM TASK 51-75-13-916-002).
   (3) Remove the access platform(s).
   (4) Close the left MLG door (Ref. AMM TASK 32-12-00-410-001).
   (5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.