Removal of the Landing Gear Normal Control lever
TASK 32-31-11-000-001-A
Removal of the Landing Gear Normal Control lever
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 32-31-11-860-050-A
Subtask 32-31-11-020-050-A
[Rev.10 from 2021]
2026.04.01 00:44:17 UTC
Removal of the Landing Gear Normal Control lever
WARNING:
MAKE SURE THAT THE GROUND SAFETY LOCKS ARE CORRECTLY INSTALLED ON THE MLG AND NLG. MOVEMENTS OF THE LANDING GEARS CAN CAUSE INJURY TO PERSONS AND CAUSE DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 211 | COCKPIT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-00-00-481-001-A | Installation of the Safety Devices on the Landing Gears |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
Subtask 32-31-11-860-050-A
A. Aircraft Maintenance Configuration
(1) Obey the applicable safety precautions before you open the LGCIU circuit breakers (Ref. AMM TASK 32-00-00-860-001).
(2) Make sure that the safety devices are installed on the MLG and NLG (Ref. AMM TASK 32-00-00-481-001).
Subtask 32-31-11-865-050-A (1) Obey the applicable safety precautions before you open the LGCIU circuit breakers (Ref. AMM TASK 32-00-00-860-001).
(2) Make sure that the safety devices are installed on the MLG and NLG (Ref. AMM TASK 32-00-00-481-001).
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 32-31-11-010-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R33 |
| 121VU | LGCIU/BAT SPLY/SYS1 | 58GA | R32 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R32 |
| 121VU | LGCIU/BAT SPLY/SYS1 | 58GA | R31 |
C. Remove the thermoformed cover from the center instrument panel.
4. ProcedureSubtask 32-31-11-020-050-A
A. Removal of the L/G Control Lever
(1) Loosen the two screws (3). Do not remove them.
(2) Pull the L/G control lever (4) from its housing.
(3) Disconnect the electrical connectors (1) and (2) from the L/G control lever (4).
(4) Remove the L/G control lever (4).
(5) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(1) Loosen the two screws (3). Do not remove them.
(2) Pull the L/G control lever (4) from its housing.
(3) Disconnect the electrical connectors (1) and (2) from the L/G control lever (4).
(4) Remove the L/G control lever (4).
(5) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
Landing Gear Normal Control Lever