Removal of the ECAM Control Panel
TASK 31-61-12-000-001-A
Removal of the ECAM Control Panel
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 31-61-12-865-050-A
Subtask 31-61-12-020-050-A
[Rev.10 from 2021]
2026.04.01 00:38:11 UTC
Removal of the ECAM Control Panel
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 31-61-12-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | EIS/ECAM/CTL/PNL | 15WT | E12 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | EIS/ECAM/CTL/PNL | 15WT | E11 |
Subtask 31-61-12-020-050-A
A. Removal of the ECAM Control Panel
(1) Loosen the quarter-turn fasteners (1).
(2) Remove the ECAM control panel (2) from its housing (5).
(3) Disconnect the connectors (4).
(4) Remove the ECAM control panel (2).
(5) Put CAP - BLANKING on the four electrical connectors (3) and (4).
(1) Loosen the quarter-turn fasteners (1).
(2) Remove the ECAM control panel (2) from its housing (5).
(3) Disconnect the connectors (4).
(4) Remove the ECAM control panel (2).
(5) Put CAP - BLANKING on the four electrical connectors (3) and (4).
ECAM Control Panel