W DOC AIRBUS | AMM A320F

Removal of the MDDU


TASK 31-38-22-000-001-A
Removal of the MDDU


ZONE: 210
FIN: 1TD ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 31-38-22-862-050-A ** ON A/C NOT FOR ALL
A. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 31-38-22-875-050-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUDATA/LOADER/SPLY3TDJ16
121VUDLS&/DLRB/SPLY5TDJ15
4. Procedure
Subtask 31-38-22-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the MDDU
   (1) Looseen the four quarter-turn fasterners (3).
   (2) Pull the MDDU (1) from its housing.
   (3) Disconnect the electrical connectors (2).
   (4) Remove the MDDU (1).
   (5) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
[Rev.10 from 2021] 2026.04.01 00:36:40 UTC