W DOC AIRBUS | AMM A320F

Installation of the Data Loading Selector


TASK 31-38-21-400-001-A
Installation of the Data Loading Selector


ZONE: 210
FIN: 101TD ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
LOADER - DATA, PORTABLE
ALT45200001
1
PORTABLE DATA LOADER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 31-38-21-860-050-A ** ON A/C NOT FOR ALL
A. Make sure that the aircraft electrical circuits from the external power is de-energized (Ref. AMM TASK 24-41-00-862-002).
Subtask 31-38-21-865-052-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUDATA/LOADER/SPLY3TDJ16
** ON A/C NOT FOR ALL
121VUDLS&/DLRB/SPLY5TDJ15
4. Procedure
Subtask 31-38-21-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Data Loading Selector
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Make sure that the housing of the data loading selector is clean and clear of tool(s) and other items.
   (6) Connect the electrical connector (1).
   (7) Install the data loading selector (2) in its housing.
   (8) Tighten the quarter-turn fasteners (3).
Subtask 31-38-21-865-053-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUDATA/LOADER/SPLY3TDJ16
** ON A/C NOT FOR ALL
121VUDLS&/DLRB/SPLY5TDJ15
Subtask 31-38-21-861-050-A ** ON A/C NOT FOR ALL
C. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 31-38-21-710-050-A ** ON A/C NOT FOR ALL
D. Test
ACTION
RESULT
1.On the overhead panel, on the Data Loading Selector (DLS):
  • Set the ON/OFF switch to ON.
On the DLS screen, the indication that follows is shown:
  • DB/N:
    PUSH NEXT/PREV.
2.On the overhead panel, on the DLS:
  • Push the PREV or NEXT pushbutton switch until you get the FMGC1 indication.
On the DLS screen, the indication that follows is shown:
  • FMGC1
    NOT SELECTED.
3.On the overhead panel, on the DLS:
  • Push the SEL CTL pushbutton switch.
On the DLS screen, the indication that follows is shown:
  • FMGC1
    SELECTED.
4.On the overhead panel, on the DLS:
  • Push the SEL CTL pushbutton switch.
On the DLS screen, the indication that follows is shown:
  • FMGC1
    NOT SELECTED.
Subtask 31-38-21-710-050-C ** ON A/C NOT FOR ALL
D. Test
ACTION
RESULT
1.On the overhead panel, on DATA LOADING panel 52VU:
  • Loosen the two middle quick-release fasteners of the access cover and remove the access cover.
  • Connect the cable to the ALT45200001 PORTABLE DATA LOADER or to the LOADER - DATA, PORTABLE and to the SYSTEMS data loader connector (2TD).

2.On the overhead panel, on the Data Loading Selector (DLS):
  • Set the ON/OFF switch to ON.
On the DLS screen, the indication that follows is shown:
  • DB/N:
    PUSH NEXT/PREV.
3.On the overhead panel, on the DLS:
  • Push the PREV or NEXT pushbutton switch until you get the FMGC1 indication.
On the DLS screen, the indication that follows is shown:
  • FMGC1
    NOT SELECTED.
4.On the overhead panel, on the DLS:
  • Push the SEL CTL pushbutton switch.
On the DLS screen, the indication that follows is shown:
  • FMGC1
    SELECTED.
5.On the overhead panel, on the DSL:
  • Push the SEL CTL pushbutton switch.
On the DLS screen, the indication that follows is shown:
  • FMGC1
    NOT SELECTED.
6.On the overhead panel, on the DLS:
  • Set the ON/OFF switch to OFF.

7.On the overhead panel, on DATA LOADING panel 52VU:
  • Disconnect the cable from the ALT45200001 PORTABLE DATA LOADER or from the LOADER - DATA, PORTABLE and from the SYSTEMS data loader connector (2TD).
  • Install the access cover and tighten the two middle quick-release fasteners.

Subtask 31-38-21-710-050-D ** ON A/C NOT FOR ALL
D. Test
ACTION
RESULT
1.On the center pedestal, on the DATA LOADING panel 117VU:
  • Loosen the two middle quick-release fasteners of the access cover and remove the access cover.
  • Connect the cable to the ALT45200001 PORTABLE DATA LOADER or to the LOADER - DATA, PORTABLE and to the DATA LOADER connector (2147VC).

2.On the overhead panel, on the Data Loading Selector (DLS):
  • Set the ON/OFF switch to ON.
On the DLS screen, the indication that follows is shown:
  • The DB/N:
    PUSH NEXT/PREV.
3.On the overhead panel, on the DLS:
  • Push the PREV or NEXT pushbutton switch until you get the FMGC1 indication.
On the DLS screen, the indication that follows is shown:
  • The FMGC1
    NOT SELECTED.
4.On the overhead panel, on the DLS:
  • Push the SEL CTL pushbutton switch.
On the DLS screen, the indication that follows is shown:
  • The FMGC1
    SELECTED.
5.On the overhead panel, on the DLS:
  • Push the SEL CTL pushbutton switch.
On the DLS screen, the indication that follows is shown:
  • The FMGC1
    NOT SELECTED.
6.On the overhead panel, on the DLS:
  • Set the ON/OFF switch to OFF.

7.On the center pedestal, on DATA LOADING panel 117VU:
  • Disconnect the cable from the ALT45200001 PORTABLE DATA LOADER or from the LOADER - DATA, PORTABLE and from the DATA LOADER connector (2147VC).
  • Install the access cover and tighten the two middle quick-release fasteners.

5. Close-up
Subtask 31-38-21-860-051-A ** ON A/C NOT FOR ALL
A. Make sure that the work area is clean and clear of tools and other items.
[Rev.10 from 2021] 2026.04.01 00:36:38 UTC