Dump Procedure to Download the FDIMU Data with PDL
TASK 31-36-00-710-014-B
Dump Procedure to Download the FDIMU Data with PDL
1. Reason for the Job
This procedure contains the download of the Smart Access Recorder (SAR) or REPORT-files, which are stored in the non-volatile Solid-State Mass Memory (SSMM).
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 31-36-00-860-123-A ** ON A/C NOT FOR ALL
Subtask 31-36-00-710-123-A ** ON A/C NOT FOR ALL
Subtask 31-36-00-410-088-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:35:45 UTC
Dump Procedure to Download the FDIMU Data with PDL
1. Reason for the Job
This procedure contains the download of the Smart Access Recorder (SAR) or REPORT-files, which are stored in the non-volatile Solid-State Mass Memory (SSMM).
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | LOADER - DATA, PORTABLE |
| ALT45200001 | 1 | PORTABLE DATA LOADER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 31-36-00-860-123-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the DISK-DATA is not write-protected.
Subtask 31-36-00-865-155-A ** ON A/C NOT FOR ALL NOTE: For the download procedure, a 1,44 MB formatted 3,5 inch disk is necessary. You must prepare this disk on a Ground Support Equipment (GSE) Application Software. Refer to the software vendor documentation.
(1) Energize the aircraft electrical circuits(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the DISK-DATA is not write-protected.
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 31-36-00-480-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | AIDS & RCDR/QAR | 14TU | K17 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | DLS&/DLRB/SPLY | 5TD | J15 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | CFDS/CFDIU/SPLY | 2TW | J18 |
| 121VU | CFDS/CFDIU/BACK/UP | 8TW | J17 |
| 121VU | PDL/PWR/SPLY | 14TD | K19 |
| 121VU | AIDS & RCDR/FDIMU | 5TV | K15 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ENGINE/ENG1 AND 2/EVMU | 1EV | R44 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | DLSU &/DLRB/SPLY | 5TD | J15 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | PDL/PWR/SPLY | 14TD | J45 |
| 121VU | CFDS/CFDIU/SPLY | 2TW | J41 |
| 121VU | CFDS/CFDIU/BACK/UP | 8TW | J40 |
| 121VU | DLSU &/DLRB/SPLY | 5TD | J38 |
| 121VU | AIDS & RCDR/FDIMU | 5TV | K38 |
C. Installation of the Portable Data Loader
(1) On the overhead panel, on the DATA LOADING panel 52VU:
(a) Loosen the two middle quick-release fasteners of the access cover and remove it.
(b) Connect the cable to the ALT45200001 PORTABLE DATA LOADER or LOADER - DATA, PORTABLE and to the SYSTEMS data loader connector (2TD).
Subtask 31-36-00-860-124-A ** ON A/C NOT FOR ALL (1) On the overhead panel, on the DATA LOADING panel 52VU:
(a) Loosen the two middle quick-release fasteners of the access cover and remove it.
(b) Connect the cable to the ALT45200001 PORTABLE DATA LOADER or LOADER - DATA, PORTABLE and to the SYSTEMS data loader connector (2TD).
D. Start the Portable Data Loader
(1) Start the ALT45200001 PORTABLE DATA LOADER or LOADER - DATA, PORTABLE (Refer to the portable data-loader user-guide).
4. Procedure(1) Start the ALT45200001 PORTABLE DATA LOADER or LOADER - DATA, PORTABLE (Refer to the portable data-loader user-guide).
Subtask 31-36-00-710-123-A ** ON A/C NOT FOR ALL
A. Dump Procedure to Download FDIMU Data with PDL
Subtask 31-36-00-860-125-A ** ON A/C NOT FOR ALL NOTE: If the PDL has the digital signature check, the PDL can trigger two messages:
- When the software has no signature (refer to the PDL user-guide), this message has no effect on the A/C software upload and you can ignore it
- When the signature is incorrect or corrupted (refer to the PDL user-guide), the software upload is not and it is necessary to use other software.
| ACTION | RESULT |
|---|---|
| 1.On the overhead panel, on the Data Loading Selector: | On the Data Loading Selector display: |
|
|
|
|
|
|
2.On the Portable Data Loader (PDL):
| |
| 3.On the Data Loading Selector | On the Data Loading Selector display: |
|
|
| |
B. Stop the Portable Data Loader
(1) Stop the ALT45200001 PORTABLE DATA LOADER or LOADER - DATA, PORTABLE (Refer to the portable data-loader user-guide).
Subtask 31-36-00-080-051-A ** ON A/C NOT FOR ALL (1) Stop the ALT45200001 PORTABLE DATA LOADER or LOADER - DATA, PORTABLE (Refer to the portable data-loader user-guide).
C. Removal of the Portable Data Loader
(1) On the overhead panel, on the DATA LOADING panel 52VU:
(a) Disconnect the cable from the ALT45200001 PORTABLE DATA LOADER or LOADER - DATA, PORTABLE and from the SYSTEMS data loader connector (2TD).
(b) Install the access cover and tighten the two middle quick-release fasteners.
5. Close-up(1) On the overhead panel, on the DATA LOADING panel 52VU:
(a) Disconnect the cable from the ALT45200001 PORTABLE DATA LOADER or LOADER - DATA, PORTABLE and from the SYSTEMS data loader connector (2TD).
(b) Install the access cover and tighten the two middle quick-release fasteners.
Subtask 31-36-00-410-088-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
Subtask 31-36-00-862-085-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.