W DOC AIRBUS | AMM A320F

Installation of the Three-Axis-Accelerometer (LA)


TASK 31-33-16-400-001-A
Installation of the Three-Axis-Accelerometer (LA)


NOTE: For a correct function of the three-axis-accelerometer, you must install it exactly in horizontal position. If the adjustment of the three-axis-accelerometer position is necessary (studs were removed), you can do it through the installation of a different numbers of washers.
ZONE: 140
FIN: 6TU
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
140
CENTER WING
241JF
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-33-00-710-016-A
Operational Test of the Three-Axis-Accelerometer thru the MCDU
TASK 31-33-00-740-801-A
BITE Test of the Three-Axis-Accelerometer through the MCDU
TASK 53-32-12-000-002-A
Removal of the Cabin Floor Panels
TASK 53-32-12-400-002-A
Installation of the Cabin Floor Panels
3. Job Set-up
Subtask 31-33-16-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that floor panel 241JF is removed (Ref. AMM TASK 53-32-12-000-002).
Subtask 31-33-16-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VURCDR/ACCLRM9TUK18
** ON A/C NOT FOR ALL
121VURCDR/ACCLRM9TUK41
4. Procedure
Subtask 31-33-16-420-050-B
A. Installation of the Three-Axis Accelerometer
   (1) Clean the component interfaces and the adjacent area.
   (2) Put the three-axis accelerometer (1) in position.
NOTE: For a correct function of the three-axis-accelerometer (1), you must install it exactly in horizontal position.
If the adjustment of the three-axis-accelerometer position is necessary (the studs (4) were removed), you can do it through the installation of a different number of the washers (5) and (6).
   (3) Remove the blanking caps and connect the electrical connector (3) on the three-axis accelerometer (1).
Subtask 31-33-16-865-055-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VURCDR/ACCLRM9TUK18
** ON A/C NOT FOR ALL
121VURCDR/ACCLRM9TUK41
Subtask 31-33-16-710-050-B
C. Test
   (1) Do the bite test of the three-axis-accelerometer through the MCDU (Ref. AMM TASK 31-33-00-740-801).
NOTE: As an alternative procedure, you can do the operational test of the three-axis-accelerometer via the MCDU (Ref. AMM TASK 31-33-00-710-016).
Subtask 31-33-16-420-051-B
D. Tightening of the Three-Axis Accelerometer
   (1) Install the nuts (2).
   (2) TORQUE the nuts (2) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in ) T.
5. Close-up
Subtask 31-33-16-410-050-A
A. Close Access
   (1) Install floor panel
241JF (Ref. AMM TASK 53-32-12-400-002).
   (2) Make sure that the work area is clean and clear of tools and other items.
Subtask 31-33-16-860-053-A
B. Aircraft Maintenance Configuration
   (1) Put the aircraft back to its initial configuration.
   (2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.01 00:34:54 UTC