W DOC AIRBUS | AMM A320F

Download and Readout of DFDR Data to Ensure Recorded Parameters Meet the Range and Accuracies Required by 14 CFR Part 121, Appendix M


TASK 31-33-00-710-809-A
Download and Readout of DFDR Data to Ensure Recorded Parameters Meet the Range and Accuracies Required by 14 CFR Part 121, Appendix M


FIN: 1TU ** ON A/C NOT FOR ALL
1. Reason for the Job
Refer to the MPD TASK: 313300-08
DOWNLOAD AND READOUT OF DFDR DATA TO ENSURE RECORDED PARAMETERS MEET THE RANGE AND ACCURACIES REQUIRED BY 14 CFR PART 121, APPENDIX M.
NOTE: The perimeter and check interval of the Digital Flight Data Recorder (DFDR) data must meet the local airworthiness authorities operational requirements. The operator must agree the perimeter and check interval of the DFDR data with the local airworthiness authorities.
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-33-00-710-009-A
Readout Procedure of the Digital Flight Data Recorder
TASK 31-33-00-710-009-B
Readout Procedure of the Digital Flight Data Recorder
3. Job Set-up
Subtask 31-33-00-861-083-A
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
4. Procedure
Subtask 31-33-00-710-115-A
A. Download and Readout of the DFDR Data
   (1) Do the readout procedure of the DFDR (Ref. AMM TASK 31-33-00-710-009).
   (2) Make sure that the perimeter and check interval of the DFDR data meet the local airworthiness authorities operational requirements.
The operator must agree the perimeter and check interval of the DFDR data with the local airworthiness authorities.
5. Close-up
Subtask 31-33-00-862-084-A
A. Aircraft Maintenance Configuration
   (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.01 00:34:25 UTC