Operational Test of the DFDR
TASK 31-33-00-710-007-A
Operational Test of the DFDR
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 31-33-00-861-055-A ** ON A/C NOT FOR ALL
Subtask 31-33-00-710-063-A ** ON A/C NOT FOR ALL
Subtask 31-33-00-862-055-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:34:40 UTC
Operational Test of the DFDR
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-008-A | Procedure to Get Access to the SYSTEM REPORT/TEST/INST Page |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 31-33-00-861-055-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) Energize the CFDS (Ref. AMM TASK 31-32-00-860-008).
Subtask 31-33-00-865-061-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) Energize the CFDS (Ref. AMM TASK 31-32-00-860-008).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CVR/CTL | 4RK | E13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | RCDR/ACCLRM | 9TU | K18 |
| 121VU | RCDR/DFDR | 7TU | K16 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FDIU | 8TU | K17 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AIDS & RCDR/QAR | 14TU | K17 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AIDS & RCDR/FDIMU | 5TV | K15 |
Subtask 31-33-00-710-063-A ** ON A/C NOT FOR ALL
A. Operational test of the DFDR
5. Close-up| ACTION | RESULT |
|---|---|
| 1.On control panel 21VU: | On control panel 21VU: |
|
|
| 2.On panel 121VU: | On the ECAM display: |
|
|
|
|
| 3.On control panel 21VU: | On control panel 21VU: |
|
|
Subtask 31-33-00-862-055-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Put the aircraft back to its initial configuration.
(2) De-energize the CFDS (Ref. AMM TASK 31-32-00-860-008).
(3) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Put the aircraft back to its initial configuration.
(2) De-energize the CFDS (Ref. AMM TASK 31-32-00-860-008).
(3) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).