W DOC AIRBUS | AMM A320F

Installation of the Removable SIM Module (RSM) and the SIM Cards of the WGL-QAR


TASK 31-33-00-400-802-A
Installation of the Removable SIM Module (RSM) and the SIM Cards of the WGL-QAR


CAUTION: OBEY THESE PRECAUTIONS TO PREVENT ELECTROSTATIC DISCHARGE (ESD) DAMAGE TO THE COMPONENTS:
  • STAY ON A CONDUCTIVE SURFACE THAT IS ELECTRICALLY GROUNDED.
  • USE A CONDUCTIVE WRIST-STRAP THAT IS ELECTRICALLY GROUNDED. (CONNECTED TO A BONDING-POINT NEAR THE WORK AREA).
  • BEFORE YOU USE THE TOOLS, MOMENTARILY HOLD THEM AGAINST AN ELECTRICAL GROUND TO RELEASE STATIC ELECTRICITY.
CAUTION: BEFORE YOU REMOVE OR INSTALL THE REMOVABLE SIM MODULE, MAKE SURE THAT THE WGL QAR IS DE-ENERGIZED. IF YOU DO NOT OBEY THIS INSTRUCTION, DAMAGE TO THE EQUIPMENT CAN OCCUR.
CAUTION: MAKE SURE THAT EACH COMPACT FLASH CARD IS CORRECTLY ALIGNED BEFORE YOU INSTALL IT IN THE RELATED SLOT. ALSO DO NOT USE FORCE TO INSTALL IT. IF YOU DO NOT OBEY THESE INSTRUCTIONS, DAMAGE TO THE EQUIPMENT CAN OCCUR.
ZONE: 120
FIN: 3TU ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
120
AVIONICS COMPARTMENT
824
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-33-00-710-021-A
Operational Test of the Wireless Ground Link-Quick Access Recorder (WGL-QAR)
TASK 52-41-00-010-002-A
Open the Avionics Compartment Doors for Access
TASK 52-41-00-410-002-A
Close the Avionics Compartment Doors after Access
TASK 31-33-00-00
DIGITAL FLIGHT DATA RECORDING SYSTEM (DFDRS) - INTERCONNECTION - DESCRIPTION AND OPERATION
3. Job Set-up
Subtask 31-33-00-861-081-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 31-33-00-010-075-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below access door 824.
   (2) Open access door 824 (Ref. AMM TASK 52-41-00-010-002).
   (3) For the location of the WGL-QAR, refer to paragraph Component Location (Ref. AMM D/O 31-33-00-00).
Subtask 31-33-00-865-115-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VURCDR/ACCLRM9TUK18
121VUAIDS & RCDR/QAR14TUK17
121VURCDR/DFDR7TUK16
121VUAIDS & RCDR/FDIMU5TVK15
4. Procedure
Subtask 31-33-00-420-058-A ** ON A/C NOT FOR ALL
A. Installation of the Removable SIM Module (RSM)
   (1) If removed, install the new SIM cards (3).
NOTE: If the SIM cards (3) are replaced, a new OPC (configuration) file must be installed. Contact the vendor customer services for more information. This will help to prevent malfunction of the equipment.
NOTE: It is recommended to record the correct position of the SIM cards (3). You must install the new SIM cards (3) in the same position as before removal.
   (2) Put the shield (5) in position.
   (3) Install and secure the screws (4).
   (4) Make sure that the arrow marks on the RSM (2) point the up direction.
   (5) Hold tightly the handle of the RSM (2). Push the RSM (2) into the slot.
   (6) Move down the top clip and move up the bottom clip to safety the RSM (2).
   (7) Turn the thumbscrew (1) clockwise by hand to safety the access door.
Subtask 31-33-00-865-116-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VURCDR/ACCLRM9TUK18
121VUAIDS & RCDR/QAR14TUK17
121VURCDR/DFDR7TUK16
121VUAIDS & RCDR/FDIMU5TVK15
Subtask 31-33-00-710-109-A ** ON A/C NOT FOR ALL
C. Test
   (1) Do operational test of the WGL-QAR (Ref. AMM TASK 31-33-00-710-021).
5. Close-up
Subtask 31-33-00-410-074-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
   (3) Remove the access platform(s).
Subtask 31-33-00-862-082-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.01 00:34:23 UTC