W DOC AIRBUS | AMM A320F

Removal of the Clock


TASK 31-21-21-000-001-A
Removal of the Clock


ZONE: 210
FIN: 2FS
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 C. Referenced Information
REFERENCE
DESIGNATION
3. Job Set-up
Subtask 31-21-21-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUCLOCK/NORM/SPLY6FSF11
121VUCLOCK/STBY/SPLY4FSN02
4. Procedure
Subtask 31-21-21-020-050-A
A. Removal of the Clock
   (1) Remove the thermoformed cover from the center instrument panel.
   (2) Loosen the two screws (4). Do not remove them.
   (3) Disengage the clock (2) from its housing (1).
   (4) Disconnect the electrical connector (5).
   (5) Remove the clock (2).
   (6) Put CAP - BLANKING on the disconnected electrical connectors (3) and (5).
[Rev.10 from 2021] 2026.04.01 00:33:24 UTC