W DOC AIRBUS | AMM A320F

Removal of the Lighted Icing Indicator


TASK 30-81-21-000-001-A
Removal of the Lighted Icing Indicator


WARNING: MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE OPENED, SAFETIED AND TAGGED.
FIN: 16DD
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
ESPM 2043130
3. Job Set-up
Subtask 30-81-21-861-051-A
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 30-81-21-010-051-A
B. Get Access
   (1) Put an ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position on the side of the aircraft to get access to the lighted icing indicator.
   (2) Remove the lining panel 211MW.
Subtask 30-81-21-865-053-A
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VULIGHTING/STBY/COMP/LIGHT1LFH04
** ON A/C NOT FOR ALL
49VULIGHTING/STBY/COMP/LIGHT1LFH02
** ON A/C ALL
121VUCOM NAV/RADAR/15SQ1K13
** ON A/C NOT FOR ALL
121VUCOM NAV/RADAR/25SQ2K14
** ON A/C ALL
122VUANTI ICE/WINDOWS/R4DG2W14
122VUANTI ICE/WHC/25DG2W13
122VUANTI ICE/WINDOWS/L4DG1X14
122VUANTI ICE/WHC/15DG1X13
123VUANTI ICE/L/WHSLD1DG1AF10
123VUANTI ICE/R/WHSLD1DG2AF03
4. Procedure
Subtask 30-81-21-020-051-A
A. Removal of the Lighted Icing Indicator
NOTE: Two persons are necessary to remove the lighted icing indicator:
  • One person out of the aircraft to hold the lighted icing indicator.
  • A second person in the aircraft to remove the lighted icing indicator.
   (1) Remove and discard the cable ties (5) that attach the electrical cables (4) against the draining pipe (8).
   (2) Disconnect the electrical cables from the splice (6) then discard the splice ESPM 2043130 .
   (3) Remove the nut (1), the washer (2) and the icing indicator (3).
   (4) Clean the remaining sealant.
[Rev.10 from 2021] 2026.04.02 06:20:19 UTC