W DOC AIRBUS | AMM A320F

Installation of the Valve-Heater


TASK 30-73-56-400-001-A
Installation of the Valve-Heater


WARNING: ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE ENVIRONMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
NOTE: The installation procedure is the same for all the heater elements.
FIN: 91DW1 ** ON A/C NOT FOR ALL
FIN: 91DW2 ** ON A/C NOT FOR ALL
FIN: 91DW3 ** ON A/C NOT FOR ALL
FIN: 91DW4 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ELEC CONTACTS INSERTION EXTRACTION TOOL M15570-20
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05TAB1)
Adhesive Tape-- Glass Cloth -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [91DW1] (VALVE-HEATER,)
FOR [91DW2] (VALVE-HEATER,)
FOR [91DW3] (VALVE-HEATER,)
FOR [91DW4] (VALVE-HEATER,)
161DW
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 30-73-00-720-001-A
Functional Test of the Potable Water Ice-Protection
TASK 30-73-19-400-001-A
Installation of Temperature Sensor
FOR [91DW1] (VALVE-HEATER,)
FOR [91DW2] (VALVE-HEATER,)
FOR [91DW3] (VALVE-HEATER,)
FOR [91DW4] (VALVE-HEATER,)
TASK 25-55-12-000-001-A
Removal of the Aft Cargo-Compartment Partition at FR65
TASK 25-55-12-400-001-A
Installation of the Aft Cargo-Compartment Partition at FR65
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 30-73-56-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) FOR [91DW1] (VALVE-HEATER,), [91DW2] (VALVE-HEATER,), [91DW3] (VALVE-HEATER,), [91DW4] (VALVE-HEATER,)
     (a) Make sure that the aft cargo-compartment door is open. (Ref. AMM TASK 52-30-00-860-001)
     (b) Make sure that the CARGO COMP LT switch 8LU is set to ON.
     (c) Make sure that the partition panel 161DW is removed. (Ref. AMM TASK 25-55-12-000-001)
Subtask 30-73-56-865-054-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2001VUPOT/WASTE WIP-HEATER-CTL32DWD02
** ON A/C NOT FOR ALL
2001VUPOT/WASTE WIP-HEATER-LINE51DWD04
** ON A/C NOT FOR ALL
2001VUPOT/WASTE WIP HEATER CTL32DWD02
Subtask 30-73-56-140-050-A ** ON A/C NOT FOR ALL
C. Preparation of component
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
   (1) Clean the potable-water line with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a lint-free cloth Textile-Lint free Cotton - (Material No.14SBA1) .
   (2) Do an inspection of the component interfaces and the adjacent area.
4. Procedure
Subtask 30-73-56-420-050-A ** ON A/C NOT FOR ALL
A. Installation of Heater Cuff from Fill/ Overflow/ Drain Valve.
   (1) Put the Heater Cuff (3) in position on the potable-water line (7).
NOTE: The Heater Cuff sensor assembly must be correctly installed against the body of the valve assembly to monitor the temperature correctly (Ref. AMM TASK 30-73-19-400-001), gaps are not permitted.
   (2) Make sure that the Heater Cuff (3) on to the water pipe (7) adjacent to valve (1) and safety with adhesive tape (2) Adhesive Tape-- Glass Cloth - (Material No.05TAB1) .
   (3) Connect the electrical connections with the ELEC CONTACTS INSERTION EXTRACTION TOOL M15570-20 to the related terminal block as identified during the removal procedure.
   (4) Safety the electrical harness (6) to the aircraft stringers with new cable ties (4).
   (5) Install insulation pack to the heater valve assembly.
NOTE: The heater valve assembly insulation pack do not prevent the correct function of the valve lever.
Subtask 30-73-56-720-050-A ** ON A/C NOT FOR ALL
B. Do the functional test of the potable-water ice-protection. (Ref. AMM TASK 30-73-00-720-001)
5. Close-up
Subtask 30-73-56-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean an clear of tool(s) and other items.
   (2) FOR [91DW1] (VALVE-HEATER,), [91DW2] (VALVE-HEATER,), [91DW3] (VALVE-HEATER,), [91DW4] (VALVE-HEATER,)
     (a) Install the partition panel 161DW. (Ref. AMM TASK 25-55-12-400-001)
     (b) Set the CARGO COMP LT switch 8LU to OFF.
     (c) Close the aft cargo-compartment door. (Ref. AMM TASK 52-30-00-860-002)
Subtask 30-73-56-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network. (Ref. AMM TASK 24-42-00-862-001)
[Rev.10 from 2021] 2026.04.01 00:33:02 UTC