W DOC AIRBUS | AMM A320F

Installation of the Potable and Waste water Ice Protection Control Unit and of the Potable Water Ice Protection Control Unit


TASK 30-73-34-400-002-A
Installation of the Potable and Waste water Ice Protection Control Unit and of the Potable Water Ice Protection Control Unit


ZONE: 132
FIN: 23DW ** ON A/C NOT FOR ALL
FIN: 3DW ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
132
FORWARD CARGO COMPARTMENT
132KW, 825
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 30-73-00-740-001-A
BITE Test of the Potable Water Ice-Protection
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 30-73-34-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the FWD cargo-compartment door 825.
Subtask 30-73-34-010-053-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Make sure that the FWD cargo-compartment door 825 is open (Ref. AMM TASK 52-30-00-860-001).
   (2) Make sure that the CARGO COMPT LIGHT switch 6LU is in the ON position.
   (3) In the cargo compartment, make sure that the sidewall panel 132KW is removed.
Subtask 30-73-34-865-054-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUPOT/WASTE WIP-HEATER-LINE21DWA03
2000VUPOT/WASTE WIP-HEATER-LINE1DWA02
2000VUPOT/WASTE WIP-HEATER-CTL2DWA01
** ON A/C NOT FOR ALL
2000VUPOT WIP-HEATER-LINE21DWA03
2000VUPOT WIP-HEATER-LINE1DWA02
2000VUPOT WIP-HEATER-CTL2DWA01
4. Procedure
Subtask 30-73-34-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the Potable and Waste Water Ice Protection Control Unit
   (1) Put the control unit (3) on the rack.
   (2) Remove the blanking caps from the electrical connectors.
   (3) Push the control unit (3) fully into position. The mechanical pushbutton comes out with a click.
   (4) Connect the connector (4) to the control unit (3).
5. Close-up
Subtask 30-73-34-865-055-A ** ON A/C NOT FOR ALL
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUPOT/WASTE WIP-HEATER-LINE21DWA03
2000VUPOT/WASTE WIP-HEATER-LINE1DWA02
2000VUPOT/WASTE WIP-HEATER-CTL2DWA01
** ON A/C NOT FOR ALL
2000VUPOT WIP-HEATER-LINE21DWA03
2000VUPOT WIP-HEATER-LINE1DWA02
2000VUPOT WIP-HEATER-CTL2DWA01
Subtask 30-73-34-740-050-A ** ON A/C NOT FOR ALL
B. Do the BITE test of the potable water ice-protection (Ref. AMM TASK 30-73-00-740-001).
Subtask 30-73-34-410-051-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the sidewall panel 132KW.
   (3) Set the CARGO COMPT LIGHT switch 6LU to OFF.
   (4) Close the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
   (5) Remove the access platform(s).
Subtask 30-73-34-862-051-A ** ON A/C NOT FOR ALL
D. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.01 00:32:49 UTC