W DOC AIRBUS | AMM A320F

Removal of the Potable and Waste Water Ice Protection Control Unit and of the Potable Water Ice Protection Control Unit


TASK 30-73-34-000-002-A
Removal of the Potable and Waste Water Ice Protection Control Unit and of the Potable Water Ice Protection Control Unit


FIN: 23DW ** ON A/C NOT FOR ALL
FIN: 3DW ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
132KW, 825
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 30-73-34-861-051-A ** ON A/C NOT FOR ALL
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 30-73-34-865-053-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUPOT/WASTE WIP-HEATER-LINE21DWA03
2000VUPOT/WASTE WIP-HEATER-LINE1DWA02
2000VUPOT/WASTE WIP-HEATER-CTL2DWA01
** ON A/C NOT FOR ALL
2000VUPOT WIP-HEATER-LINE21DWA03
2000VUPOT WIP-HEATER-LINE1DWA02
2000VUPOT WIP-HEATER-CTL2DWA01
Subtask 30-73-34-010-051-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at the FWD cargo-compartment door 825.
   (2) Open the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
   (3) Set the CARGO COMPT LIGHT switch 6LU to ON.
   (4) In the cargo compartment, remove the sidewall panel 132KW.
4. Procedure
Subtask 30-73-34-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the Potable and Waste Water Ice Protection Control Unit
   (1) Disconnect the connector (4) from the control unit (3).
     (a) Push the mechanical pushbutton (1) on the rack and pull out the control unit (3).
     (b) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (2) Remove the control unit (3).
[Rev.10 from 2021] 2026.04.01 00:32:47 UTC