Installation of the Window Heat Computer (WHC)
TASK 30-42-34-400-001-A
Installation of the Window Heat Computer (WHC)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 30-42-34-860-050-A
Subtask 30-42-34-420-050-A
Subtask 30-42-34-865-052-A
[Rev.10 from 2021]
2026.04.01 00:30:59 UTC
Installation of the Window Heat Computer (WHC)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 121 | AVIONICS COMPARTMENT |
| 122 | AVIONICS COMPARTMENT |
| 811 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 30-42-00-710-001-A | Operational Test of the Windshield Anti-Icing and Defogging |
Subtask 30-42-34-860-050-A
A. Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position.
Subtask 30-42-34-010-051-A Subtask 30-42-34-865-051-A C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 2DG1 (WHC1) | |||
| 122VU | ANTI ICE/WINDOWS/L | 4DG1 | X14 |
| 122VU | ANTI ICE/WHC/1 | 5DG1 | X13 |
| 123VU | ANTI ICE/L/WHSLD | 1DG1 | AF10 |
| FOR FIN: 2DG2 (WHC2) | |||
| 122VU | ANTI ICE/WINDOWS/R | 4DG2 | W14 |
| 122VU | ANTI ICE/WHC/2 | 5DG2 | W13 |
| 123VU | ANTI ICE/R/WHSLD | 1DG2 | AF03 |
Subtask 30-42-34-420-050-A
A. Installation of the Window Heat Computer (WHC)
(1) Install the WHC (3).
(2) Install the screws (2) and washers (1). Tighten the screws (2).
(3) Remove the blanking caps and connect the electrical connectors (4) and (5).
5. Close-up(1) Install the WHC (3).
(2) Install the screws (2) and washers (1). Tighten the screws (2).
(3) Remove the blanking caps and connect the electrical connectors (4) and (5).
Subtask 30-42-34-865-052-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 30-42-34-860-052-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 2DG1 (WHC1) | |||
| 122VU | ANTI ICE/WINDOWS/L | 4DG1 | X14 |
| 123VU | ANTI ICE/L/WHSLD | 1DG1 | AF10 |
| FOR FIN: 2DG2 (WHC2) | |||
| 122VU | ANTI ICE/WINDOWS/R | 4DG2 | W14 |
| 123VU | ANTI ICE/R/WHSLD | 1DG2 | AF03 |
B. Circuit Breaker(s) Configuration
(1) After two seconds, remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s) that follow.
Subtask 30-42-34-865-053-A (1) After two seconds, remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s) that follow.
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 30-42-34-710-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 2DG1 (WHC1) | |||
| 122VU | ANTI ICE/WHC/1 | 5DG1 | X13 |
| FOR FIN: 2DG2 (WHC2) | |||
| 122VU | ANTI ICE/WHC/2 | 5DG2 | W13 |
D. Do an operational test of the cockpit windshield anti-icing and defogging system (Ref. AMM TASK 30-42-00-710-001)
Subtask 30-42-34-410-050-A E. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 811.
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 811.
(3) Remove the access platform(s).
Window Heat Computer (WHC)