W DOC AIRBUS | AMM A320F

Installation of the Probe Heat Computer (PHC)


TASK 30-31-34-400-002-A
Installation of the Probe Heat Computer (PHC)


WARNING: MAKE SURE THAT CIRCUIT BREAKERS 2KS1 AND 2KS2 ARE CLOSED BEFORE YOU CLOSE PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3). IF YOU DO NOT OBEY THIS INSTRUCTION: - THE PROBES WILL BECOME TOO HOT. - THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
ZONE: 121
ZONE: 122
FIN: 6DA1
FIN: 6DA2
FIN: 6DA3
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
121
AVIONICS COMPARTMENT
122
AVIONICS COMPARTMENT
811
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 30-31-00-710-001-A
Operational Test of the Probe Ice Protection
3. Job Set-up
Subtask 30-31-34-865-052-A
WARNING: MAKE SURE THAT THE PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3) ARE OPEN BEFORE YOU OPEN THE PHC CIRCUIT BREAKERS 2DA1(2,3). IF YOU DO NOT OBEY THIS PRECAUTION, THE PROBES WILL BECOME TOO HOT. THIS CAN CAUSE INJURY TO MAINTENANCE PERSONNEL AND/OR DAMAGE TO EQUIPMENT.
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 6DA1 (PHC1)
49VUANTI ICE/PROBES/AOA/14DA1D04
49VUANTI ICE/PROBES/PHC/12DA1D03
49VUANTI ICE/PROBES/PITOT/13DA1D02
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
122VUANTI ICE/PROBES/1/TAT1DA1Z12
FOR FIN: 6DA2 (PHC2)
122VUANTI ICE/PROBES/2/TAT1DA2Y15
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/PHC/22DA2Y12
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
FOR FIN: 6DA3 (PHC3)
122VUANTI ICE/PROBES/PHC/32DA3Y16
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
Subtask 30-31-34-010-051-A
B. Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position.
   (1) Make sure that the access door 811 is open.
4. Procedure
Subtask 30-31-34-420-050-A
A. Installation of the PHC
   (1) Install the PHC (3).
   (2) Install the screws (1) and the washers (2).
   (3) Tighten the screws (1).
   (4) Remove the CAP-BLANKING from each electrical connector and receptacle.
CAUTION: DO NOT TWIST OR BEND THE ELECTRICAL HARNESS WHEN YOU DISCONNECT/CONNECT THE ELECTRICAL CONNECTOR. IF YOU DO, YOU CAN CAUSE DAMAGE TO THE HARNESS AND THUS CAUSE ELECTRICAL CIRCUIT DEFECTS.
   (5) Turn the position of the backshell in relation to the PHC according to the ESPM 20-33-45 and connect the electrical connector (4).
NOTE: Obey the rules in the ESPM 20-33-11 to prevent the electrical harness stress, twist or wrong bend radius.
Subtask 30-31-34-865-053-A
WARNING: CLOSE THE PHC CIRCUIT BREAKERS 2DA1(2,3) BEFORE YOU CLOSE THE PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3). IF YOU DO NOT OBEY THIS SEQUENCE, THE PROBES WILL BECOME TOO HOT. THIS CAN CAUSE INJURY TO MAINTENANCE PERSONNEL AND/OR DAMAGE TO EQUIPMENT.
B. Remove the safety clips and tags and close these circuit breakers in this sequence:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 6DA1 (PHC1)
49VUANTI ICE/PROBES/PHC/12DA1D03
122VUANTI ICE/PROBES/1/TAT1DA1Z12
49VUANTI ICE/PROBES/PITOT/13DA1D02
49VUANTI ICE/PROBES/AOA/14DA1D04
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
FOR FIN: 6DA2 (PHC2)
122VUANTI ICE/PROBES/PHC/22DA2Y12
122VUANTI ICE/PROBES/2/TAT1DA2Y15
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
FOR FIN: 6DA3 (PHC3)
122VUANTI ICE/PROBES/PHC/32DA3Y16
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
Subtask 30-31-34-710-050-A
C. Do an operational test of the probe ice protection system (Ref. AMM TASK 30-31-00-710-001).
5. Close-up
Subtask 30-31-34-410-050-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 811.
   (3) Remove the access platform(s).
[Rev.10 from 2021] 2026.04.01 00:30:51 UTC