Removal of the System Pressure Switch
TASK 29-32-12-000-001-A
Removal of the System Pressure Switch
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 29-32-12-010-050-A Subtask 29-32-12-865-050-A
Subtask 29-32-12-020-050-A
[Rev.10 from 2021]
2026.04.01 00:27:44 UTC
Removal of the System Pressure Switch
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
FIN: 1151GN
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | 1 | CAP - BLANKING |
| No specific | 1 | CONTAINER - HYDRAULIC FLUID RESISTANT |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
Subtask 29-32-12-010-050-A Subtask 29-32-12-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-32-12-860-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 121VU | FLIGHT CONTROLS/SEC3/SPLY | 21CE3 | Q19 |
| 121VU | FLIGHT CONTROLS/SEC2/SPLY | 21CE2 | Q18 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
C. Aircraft Maintenance Configuration
(2) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(4) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
(6) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(7) Put the CONTAINER - HYDRAULIC FLUID RESISTANT in position below the system pressure switch to collect any hydraulic fluid.
4. ProcedureWARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(4) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Green hydraulic system.
(6) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(7) Put the CONTAINER - HYDRAULIC FLUID RESISTANT in position below the system pressure switch to collect any hydraulic fluid.
Subtask 29-32-12-020-050-A
A. Removal of the System Pressure Switch
(1) Disconnect the electrical connector (1).
(2) Put the CAP - BLANKING on the disconnected electrical connector (1).
(3) Remove the nut (5), the washer (6), the screw (8), the bonding jumper (7) and the clamp (9) from the system pressure switch (2).
(4) Cut and remove the lockwire.
(5) Loosen the system pressure switch (2) and remove it together with the O-ring (3) from the manifold (4).
(6) Discard the O-ring.
(7) Install a PLUG - BLANKING in the open ports.
(1) Disconnect the electrical connector (1).
(2) Put the CAP - BLANKING on the disconnected electrical connector (1).
(3) Remove the nut (5), the washer (6), the screw (8), the bonding jumper (7) and the clamp (9) from the system pressure switch (2).
(4) Cut and remove the lockwire.
(5) Loosen the system pressure switch (2) and remove it together with the O-ring (3) from the manifold (4).
(6) Discard the O-ring.
(7) Install a PLUG - BLANKING in the open ports.
System Pressure Switch of the Green and Yellow Hydraulic Systems