W DOC AIRBUS | AMM A320F

Removal of the Yellow E-Pump Check Valve


TASK 29-24-21-000-001-A
Removal of the Yellow E-Pump Check Valve


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
FIN: 3083GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CONTAINER 5 L (1.32 USGAL)
No specific
2
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
2
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
196BB, 198CB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
3. Job Set-up
Subtask 29-24-21-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
** ON A/C ALL
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 29-24-21-860-050-A
B. Aircraft Maintenance Configuration
   (1) Open the access door 198CB.
   (2) Open the access panel 196BB.
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
   (3) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (4) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
  • in the cockpit on the hydraulic section 40VU of the overhead panel,
  • on the ground service panel of the Yellow hydraulic system.
   (5) Make sure that the Yellow hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (6) Depressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-001).
   (7) Put the CONTAINER 5 L (1.32 USGAL) below the HP manifold of the Yellow hydraulic system.
   (8) Disconnect the isolation coupling of the power transfer unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
4. Procedure
Subtask 29-24-21-020-050-A
A. Removal of the Yellow E-Pump Check Valve (3083GM)
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
   (1) Loosen the pipe end-fitting (2) and disconnect the pipe (1) from the check valve (3).
   (2) Remove the check valve (3) from the T-fitting (5).
   (3) Put a PLUG - BLANKING on the disconnected pipe end-fitting (2) and in the open port of the T-fitting (5).
   (4) Remove and discard the packing (4).
[Rev.10 from 2021] 2026.04.01 00:27:03 UTC