Removal of the Yellow E-Pump Check Valve
TASK 29-24-21-000-001-A
Removal of the Yellow E-Pump Check Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-24-21-865-050-A
Subtask 29-24-21-020-050-A
[Rev.10 from 2021]
2026.04.01 00:27:03 UTC
Removal of the Yellow E-Pump Check Valve
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
FIN: 3083GM
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | CONTAINER 5 L (1.32 USGAL) |
| No specific | 2 | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 196BB, 198CB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
Subtask 29-24-21-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-24-21-860-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
B. Aircraft Maintenance Configuration
(1) Open the access door 198CB.
(2) Open the access panel 196BB.
(4) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
(Ref. AMM TASK 29-00-00-864-001).
(6) Depressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(7) Put the CONTAINER 5 L (1.32 USGAL) below the HP manifold of the Yellow hydraulic system.
(8) Disconnect the isolation coupling of the power transfer unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
4. Procedure(1) Open the access door 198CB.
(2) Open the access panel 196BB.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(3) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (4) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Yellow hydraulic system.
(Ref. AMM TASK 29-00-00-864-001).
(6) Depressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(7) Put the CONTAINER 5 L (1.32 USGAL) below the HP manifold of the Yellow hydraulic system.
(8) Disconnect the isolation coupling of the power transfer unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
Subtask 29-24-21-020-050-A
A. Removal of the Yellow E-Pump Check Valve (3083GM)
(2) Remove the check valve (3) from the T-fitting (5).
(3) Put a PLUG - BLANKING on the disconnected pipe end-fitting (2) and in the open port of the T-fitting (5).
(4) Remove and discard the packing (4).
CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
(1) Loosen the pipe end-fitting (2) and disconnect the pipe (1) from the check valve (3). (2) Remove the check valve (3) from the T-fitting (5).
(3) Put a PLUG - BLANKING on the disconnected pipe end-fitting (2) and in the open port of the T-fitting (5).
(4) Remove and discard the packing (4).
Yellow E-Pump Check Valve (3083GM)