Installation of the Yellow Electric Pump Phase-Unbalance Detector
TASK 29-24-16-400-001-A
Installation of the Yellow Electric Pump Phase-Unbalance Detector
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-24-16-860-050-A
Subtask 29-24-16-420-050-A
Subtask 29-24-16-410-050-A
[Rev.10 from 2021]
2026.04.01 00:27:01 UTC
Installation of the Yellow Electric Pump Phase-Unbalance Detector
FIN: 3808GX
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-24-00-710-002-A | Operational Test of the Phase Unbalance Detector and the Current Transformer of the Yellow Hydraulic System |
Subtask 29-24-16-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the access door 822.
(2) Open the access door 822.
Subtask 29-24-16-865-051-A (1) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the access door 822.
(2) Open the access door 822.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
Subtask 29-24-16-420-050-A
A. Installation of the Yellow Electric Pump Phase-Unbalance Detector
(1) Install the detector (1) on the support.
(2) Install the washers (2) and the screws (3).
(3) Remove the blanking cap from the connector (4).
(4) Connect the electrical connector (4) to the detector (1).
Subtask 29-24-16-865-053-A (1) Install the detector (1) on the support.
(2) Install the washers (2) and the screws (3).
(3) Remove the blanking cap from the connector (4).
(4) Connect the electrical connector (4) to the detector (1).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 29-24-16-710-050-A 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
Subtask 29-24-16-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 822.
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 822.
(3) Remove the access platform(s).
Yellow Electric Pump Phase-Unbalance Detector