W DOC AIRBUS | AMM A320F

Removal of the Yellow Electric Pump Phase-Unbalance Detector


TASK 29-24-16-000-001-A
Removal of the Yellow Electric Pump Phase-Unbalance Detector


FIN: 3808GX
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
822
 C. Referenced Information
REFERENCE
DESIGNATION
3. Job Set-up
Subtask 29-24-16-010-050-A
A. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 822.
   (2) Open the access door 822.
Subtask 29-24-16-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
** ON A/C ALL
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
4. Procedure
Subtask 29-24-16-020-050-A
A. Removal of the Yellow Electric Pump Phase-Unbalance Detector
   (1) Disconnect the electrical connector (4) from the detector (1).
   (2) Put a CAP - BLANKING on the disconnected electrical connector (4).
   (3) Remove the screws (3) and the washers (2).
   (4) Remove the detector (1).
[Rev.10 from 2021] 2026.04.01 00:27:00 UTC