W DOC AIRBUS | AMM A320F

Installation of the RAT Ground Control Unit


TASK 29-22-12-400-003-A
Installation of the RAT Ground Control Unit


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 3GE
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Consumable Materials
REFERENCE
DESIGNATION
(Material No.04QAB2)
Coating_- Flexible Structure
(Material No.06AEB2)
Polysulfide Sealant-Low Adhesion Fillet Structure
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
197EB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 29-22-00-710-007-A
Operational Test of the Manual Deployment and the Retraction of the Ram Air Turbine
3. Job Set-up
Subtask 29-22-12-865-056-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUHYD/RAT/CTL2801GED14
** ON A/C NOT FOR ALL
49VUHYD/RAT/CTL2801GEB13
Subtask 29-22-12-860-052-A
B. Make sure that the access panel 197EB is open.
4. Procedure
Subtask 29-22-12-420-052-A
A. Installation of the RAT Ground Control Unit
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Install the bonding strap (7) with the screw (5) and the washer (6) on the RAT ground control unit (3) (Ref. AMM TASK 20-28-00-912-802).
   (4) Remove the blanking cap from the electrical connector (4) and the receptacle.
   (5) Make sure that all the electrical connections are clean and in the correct condition.
   (6) Connect the electrical connector (4) to the receptacle.
   (7) Apply a layer of the Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) to the contact surface of the RAT ground control unit (3).
   (8) Install and align the RAT ground control unit (3) in the Blue ground service panel (1).
   (9) Apply the zinc chromate putty Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the threads of the screws (2).
   (10) Install and tighten the screws (2).
   (11) Remove the unwanted sealant from around the edges of the RAT ground control unit.
   (12) Make the remaining sealant smooth, then apply the Coating_- Flexible Structure (Material No.04QAB2) to protect it.
Subtask 29-22-12-865-057-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUHYD/RAT/CTL2801GED14
** ON A/C NOT FOR ALL
49VUHYD/RAT/CTL2801GEB13
Subtask 29-22-12-720-052-A
C. Operational Test
   (1) Do the test of the deployment and retraction of the RAT (Ref. AMM TASK 29-22-00-710-007).
5. Close-up
Subtask 29-22-12-410-052-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access panel 197EB.
[Rev.10 from 2021] 2026.04.02 06:19:38 UTC