Installation of the RAT Ground Control Unit
TASK 29-22-12-400-003-A
Installation of the RAT Ground Control Unit
Self explanatory
2. Job Set-up Information
A. Consumable Materials
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-22-12-865-056-A
Subtask 29-22-12-420-052-A
Subtask 29-22-12-410-052-A
[Rev.10 from 2021]
2026.04.02 06:19:38 UTC
Installation of the RAT Ground Control Unit
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 3GE
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04QAB2) | Coating_- Flexible Structure |
| (Material No.06AEB2) | Polysulfide Sealant-Low Adhesion Fillet Structure |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 197EB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 29-22-00-710-007-A | Operational Test of the Manual Deployment and the Retraction of the Ram Air Turbine |
Subtask 29-22-12-865-056-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 29-22-12-860-052-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYD/RAT/CTL | 2801GE | D14 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYD/RAT/CTL | 2801GE | B13 |
B. Make sure that the access panel 197EB is open.
4. ProcedureSubtask 29-22-12-420-052-A
A. Installation of the RAT Ground Control Unit
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the bonding strap (7) with the screw (5) and the washer (6) on the RAT ground control unit (3) (Ref. AMM TASK 20-28-00-912-802).
(4) Remove the blanking cap from the electrical connector (4) and the receptacle.
(5) Make sure that all the electrical connections are clean and in the correct condition.
(6) Connect the electrical connector (4) to the receptacle.
(7) Apply a layer of the Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) to the contact surface of the RAT ground control unit (3).
(8) Install and align the RAT ground control unit (3) in the Blue ground service panel (1).
(9) Apply the zinc chromate putty Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the threads of the screws (2).
(10) Install and tighten the screws (2).
(11) Remove the unwanted sealant from around the edges of the RAT ground control unit.
(12) Make the remaining sealant smooth, then apply the Coating_- Flexible Structure (Material No.04QAB2) to protect it.
Subtask 29-22-12-865-057-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the bonding strap (7) with the screw (5) and the washer (6) on the RAT ground control unit (3) (Ref. AMM TASK 20-28-00-912-802).
(4) Remove the blanking cap from the electrical connector (4) and the receptacle.
(5) Make sure that all the electrical connections are clean and in the correct condition.
(6) Connect the electrical connector (4) to the receptacle.
(7) Apply a layer of the Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) to the contact surface of the RAT ground control unit (3).
(8) Install and align the RAT ground control unit (3) in the Blue ground service panel (1).
(9) Apply the zinc chromate putty Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the threads of the screws (2).
(10) Install and tighten the screws (2).
(11) Remove the unwanted sealant from around the edges of the RAT ground control unit.
(12) Make the remaining sealant smooth, then apply the Coating_- Flexible Structure (Material No.04QAB2) to protect it.
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 29-22-12-720-052-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYD/RAT/CTL | 2801GE | D14 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYD/RAT/CTL | 2801GE | B13 |
C. Operational Test
(1) Do the test of the deployment and retraction of the RAT (Ref. AMM TASK 29-22-00-710-007).
5. Close-up(1) Do the test of the deployment and retraction of the RAT (Ref. AMM TASK 29-22-00-710-007).
Subtask 29-22-12-410-052-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access panel 197EB.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access panel 197EB.
RAT Ground Control Unit