Removal of the Ground Leakage-Measurement Manifold of the Yellow Hydraulic System
TASK 29-19-41-000-003-A
Removal of the Ground Leakage-Measurement Manifold of the Yellow Hydraulic System
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-19-41-865-056-A ** ON A/C NOT FOR ALL
Subtask 29-19-41-020-052-B ** ON A/C NOT FOR ALL
(1) Loosen the pipe end-fitting (2) and disconnect the pipe (1) from the union (3).
(2) Loosen the pipe end-fitting (17) and disconnect the pipe (16) from the union (18).
(3) Loosen the pipe end-fitting (14) and disconnect the pipe (15) from the union (13).
(4) Loosen the pipe end-fitting (7) and disconnect the pipe (8) from the union (6).
(5) Loosen the pipe end-fitting (10) and disconnect the pipe (9) from the union (11).
(6) Hold the manifold (12) and remove the bolts (4), the washers (5) and the manifold (12).
(7) Install a PLUG - BLANKING in all pipe connections and on the unions.
[Rev.10 from 2021]
2026.04.01 00:25:36 UTC
Removal of the Ground Leakage-Measurement Manifold of the Yellow Hydraulic System
FIN: 3146GM ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | CONTAINER 2 L (0.53 USGAL) |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 196BB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
Subtask 29-19-41-865-056-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-19-41-941-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST | 1881GP | N35 |
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
B. Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
Subtask 29-19-41-010-052-A ** ON A/C NOT FOR ALL Subtask 29-19-41-860-054-A ** ON A/C NOT FOR ALL - In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panel of the Yellow hydraulic system.
D. Aircraft Maintenance Configuration
(2) Depressurize the Yellow hydraulic system
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Yellow hydraulic system.
(Ref. AMM TASK 29-14-00-614-001).
(4) Put a CONTAINER 2 L (0.53 USGAL) below the manifold 3146GM to collect unwanted fluid.
(5) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
4. ProcedureWARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Depressurize the Yellow hydraulic system
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Yellow hydraulic system.
(Ref. AMM TASK 29-14-00-614-001).
(4) Put a CONTAINER 2 L (0.53 USGAL) below the manifold 3146GM to collect unwanted fluid.
(5) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
Subtask 29-19-41-020-052-B ** ON A/C NOT FOR ALL
CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
A. Removal of the Ground Leakage- Measurement Manifold 3146GM (1) Loosen the pipe end-fitting (2) and disconnect the pipe (1) from the union (3).
(2) Loosen the pipe end-fitting (17) and disconnect the pipe (16) from the union (18).
(3) Loosen the pipe end-fitting (14) and disconnect the pipe (15) from the union (13).
(4) Loosen the pipe end-fitting (7) and disconnect the pipe (8) from the union (6).
(5) Loosen the pipe end-fitting (10) and disconnect the pipe (9) from the union (11).
(6) Hold the manifold (12) and remove the bolts (4), the washers (5) and the manifold (12).
(7) Install a PLUG - BLANKING in all pipe connections and on the unions.
Ground Leakage-Measurement Manifold - Yellow Hydraulic System (3146GM)