W DOC AIRBUS | AMM A320F

Removal of the Ground Leakage-Measurement Manifold of the Blue Hydraulic System


TASK 29-19-41-000-002-A
Removal of the Ground Leakage-Measurement Manifold of the Blue Hydraulic System


FIN: 2146GM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CONTAINER 2 L (0.53 USGAL)
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
2
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
195BB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
3. Job Set-up
Subtask 29-19-41-865-053-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
121VUHYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST1881GPN35
123VUB HYD/ELEC PUMP2701GJAB09
Subtask 29-19-41-941-051-A ** ON A/C NOT FOR ALL
B. Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Blue hydraulic system:
  • In the cockpit on the hydraulic section 40VU of the overhead panel
  • On the ground service panel of the Blue hydraulic system.
Subtask 29-19-41-860-053-A ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (3) Depressurize the reservoir of the Blue hydraulic system.
(Ref. AMM TASK 29-14-00-614-001).
Subtask 29-19-41-010-051-A ** ON A/C NOT FOR ALL
D. Open the access door 195BB.
Subtask 29-19-41-941-054-A ** ON A/C NOT FOR ALL
E. Put a CONTAINER 2 L (0.53 USGAL) below the manifold 2146GM to collect unwanted fluid.
4. Procedure
Subtask 29-19-41-020-053-B ** ON A/C NOT FOR ALL
A. Removal of the Ground Leakage-Measurement Manifold 2146GM
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
   (1) Loosen the pipe end-fitting (5) and disconnect the pipe (6) from the union (4).
   (2) Loosen the union nut (8) and disconnect the tee-piece (7) together with the attached pipes from the union (9).
   (3) Loosen the pipe end-fitting (11) and disconnect the pipe (12) from the union (10).
   (4) Loosen the pipe end-fitting (14) and disconnect the pipe (13) from the union (15).
   (5) Loosen the pipe end-fitting (17) and disconnect the pipe (16) from the union (18).
   (6) Hold the manifold (1) and remove the bolts (2) and the washers (3).
   (7) Remove the manifold (1).
   (8) Install a PLUG - BLANKING in all the pipe connections and on the unions.
[Rev.10 from 2021] 2026.04.01 00:25:34 UTC