Removal of the Ground Leakage-Measurement Manifold of the Blue Hydraulic System
TASK 29-19-41-000-002-A
Removal of the Ground Leakage-Measurement Manifold of the Blue Hydraulic System
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-19-41-865-053-A ** ON A/C NOT FOR ALL
Subtask 29-19-41-020-053-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:25:34 UTC
Removal of the Ground Leakage-Measurement Manifold of the Blue Hydraulic System
FIN: 2146GM ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | CONTAINER 2 L (0.53 USGAL) |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 195BB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
Subtask 29-19-41-865-053-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-19-41-941-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
| 121VU | HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST | 1881GP | N35 |
| 123VU | B HYD/ELEC PUMP | 2701GJ | AB09 |
B. Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Blue hydraulic system:
Subtask 29-19-41-860-053-A ** ON A/C NOT FOR ALL - In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panel of the Blue hydraulic system.
C. Aircraft Maintenance Configuration
(2) Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Blue hydraulic system.
(Ref. AMM TASK 29-14-00-614-001).
Subtask 29-19-41-010-051-A ** ON A/C NOT FOR ALL Subtask 29-19-41-941-054-A ** ON A/C NOT FOR ALL WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Blue hydraulic system.
(Ref. AMM TASK 29-14-00-614-001).
E. Put a CONTAINER 2 L (0.53 USGAL) below the manifold 2146GM to collect unwanted fluid.
4. ProcedureSubtask 29-19-41-020-053-B ** ON A/C NOT FOR ALL
A. Removal of the Ground Leakage-Measurement Manifold 2146GM
(2) Loosen the union nut (8) and disconnect the tee-piece (7) together with the attached pipes from the union (9).
(3) Loosen the pipe end-fitting (11) and disconnect the pipe (12) from the union (10).
(4) Loosen the pipe end-fitting (14) and disconnect the pipe (13) from the union (15).
(5) Loosen the pipe end-fitting (17) and disconnect the pipe (16) from the union (18).
(6) Hold the manifold (1) and remove the bolts (2) and the washers (3).
(7) Remove the manifold (1).
(8) Install a PLUG - BLANKING in all the pipe connections and on the unions.
CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
(1) Loosen the pipe end-fitting (5) and disconnect the pipe (6) from the union (4). (2) Loosen the union nut (8) and disconnect the tee-piece (7) together with the attached pipes from the union (9).
(3) Loosen the pipe end-fitting (11) and disconnect the pipe (12) from the union (10).
(4) Loosen the pipe end-fitting (14) and disconnect the pipe (13) from the union (15).
(5) Loosen the pipe end-fitting (17) and disconnect the pipe (16) from the union (18).
(6) Hold the manifold (1) and remove the bolts (2) and the washers (3).
(7) Remove the manifold (1).
(8) Install a PLUG - BLANKING in all the pipe connections and on the unions.
Ground Leakage-Measurement Manifold - Blue Hydraulic System (2146GM)