Installation of the Reservoir Depressurization Valve of the Green Hydraulic System


TASK 29-14-16-400-001-A
Installation of the Reservoir Depressurization Valve of the Green Hydraulic System


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 1087GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
2
WARNING NOTICE(S)
No specific
Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T
No specific
Torque wrench: range to between 3.50 and 3.20 m.daN (25.81 and 23.60 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
(Material No.04QAB2)
Coating_- Flexible Structure
(Material No.06AEB2)
Polysulfide Sealant-Low Adhesion Fillet Structure
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
(Material No.14CCB6)
Testing Medium-Leak Detection - Oxygen System
No specific
lockwire, corrosion resistant steel 1.2 mm (0.047 in.)
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
197BB, 197CB
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
O-RING
AIPC 29-14-04-03-030
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
3. Job Set-up
Subtask 29-14-16-860-053-A
A. Aircraft Maintenance Configuration
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Green hydraulic system:
  • in the cockpit on the hydraulic section 40VU of the overhead panel,
  • on the ground service panel of the Green hydraulic system.
   (3) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (4) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (5) Make sure that the access panel 197BB is removed (Ref. AMM TASK 53-35-13-000-002).
   (6) Make sure that the access door 197BB is open.
Subtask 29-14-16-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C ALL
121VUHYDRAULIC/LOW/LVL/IND1832GQN32
121VUHYDRAULIC/HYD/QTY/IND1831GQP35
4. Procedure
Subtask 29-14-16-420-050-A
A. Installation of the Reservoir Pressurization Valve
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
CAUTION: YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS LUBRICANT.
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the contact surface of the depressurization valve (4) and the ground service panel is clean.
   (4) Apply Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) to the contact surface of the depressurization valve (4).
   (5) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the bolts (5).
   (6) Install the depressurization valve (4) in the ground service panel.
   (7) Install the bolts (5) and the nuts (6) and tighten them.
   (8) Install the removed parts on the depressurization valve as follows:
     (a) Remove the blanking plugs from the depressurization valve (4) and the reducer (2).
     (b) Lubricate the threads of the adapter (2) and the new AIPC 29-14-04-03-030 O-RING (3) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
     (c) Put the new O-ring (3) in position on the reducer (2).
     (d) Install the reducer (2).
     (e) TORQUE the reducer (2) to between 3.50 and 3.20 m.daN (25.81 and 23.60 lbf.ft ) T.
   (9) Apply Coating_- Flexible Structure (Material No.
04QAB2) to the sealant around the depressurization valve (4).
   (10) Remove the blanking plugs from the line ends.
   (11) Make sure that the hydraulic line end-fittings are serviceable.
   (12) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the thread of the line end-fitting.
   (13) Connect the line end-fitting (1) to the reducer (2).
   (14) TORQUE the line end-fitting (1) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T.
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
   (15) Safety the cap assembly of the depressurization valve (4) with lockwire, corrosion resistant steel 1.2 mm (0.047 in.)
Subtask 29-14-16-790-050-A
B. Test
   (1) Make sure that the depressurization valve (4) is closed.
   (2) Pressurize the reservoir of the Green hydraulic system (
Ref. AMM TASK 29-14-00-614-002).
   (3) Apply Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the connection of the pipe end-fitting (1) and the reducer (2) and make sure that there are no leaks.
5. Close-up
Subtask 29-14-16-942-050-A
A. Remove the warning notices from the cockpit and from the ground service panel.
Subtask 29-14-16-410-050-A
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panel 197BB (Ref. AMM TASK 53-35-13-400-002).
   (3) Close the access door 197CB.
Subtask 29-14-16-865-056-A
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C ALL
121VUHYDRAULIC/LOW/LVL/IND1832GQN32
121VUHYDRAULIC/HYD/QTY/IND1831GQP35
[Rev.10 from 2021] 2026.04.01 00:24:33 UTC