W DOC AIRBUS | AMM A320F

Installation of the Air Pressure Gage of the Blue Hydraulic System


TASK 29-14-15-400-002-A
Installation of the Air Pressure Gage of the Blue Hydraulic System


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
FIN: 2383GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
2
WARNING NOTICE(S)
No specific
Torque wrench: range to between 1.71 and 1.52 m.daN (12.61 and 11.21 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.14CCB6)
Testing Medium-Leak Detection - Oxygen System
No specific
lockwire, corrosion resistant steel, 0.8mm (0.032 in.)
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
197FB
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
3. Job Set-up
Subtask 29-14-15-860-056-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Blue hydraulic system:
  • in the cockpit on the hydraulic section 40VU of the overhead panel,
  • on the ground service panel of the Blue hydraulic system.
   (2) Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (3) Make sure that the reservoir of the Blue hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (4) Make sure that the access door 197FB is open.
Subtask 29-14-15-865-054-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
121VUHYDRAULIC/LOW/LVL/IND1832GQN32
121VUHYDRAULIC/HYD/QTY/IND1831GQP35
123VUB HYD/ELEC PUMP2701GJAB09
4. Procedure
Subtask 29-14-15-420-051-A
A. Installation of the Air Pressure Gage
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the blanking plugs from the pressure gage (1) and from the ports on the top of the reservoir.
   (4) Install the pressure gage (1) on the adapter (2).
   (5) Hold the adapter (2) and TORQUE the connector of the pressure gage (1) to between 1.71 and 1.52 m.daN (12.61 and 11.21 lbf.ft ) T.
   (6) Safety the pressure gage (1) and the adapter (2) to the reservoir with lockwire, corrosion resistant steel, 0.8mm (0.032 in.).
Subtask 29-14-15-790-051-A
B. Test
   (1) Pressurize the reservoir of the Blue hydraulic system (
Ref. AMM TASK 29-14-00-614-002).
   (2) Apply leak detector Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the connection of the pressure gage (1) and the adapter (2) and make sure that there are no leaks.
5. Close-up
Subtask 29-14-15-865-055-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
121VUHYDRAULIC/LOW/LVL/IND1832GQN32
121VUHYDRAULIC/HYD/QTY/IND1831GQP35
123VUB HYD/ELEC PUMP2701GJAB09
Subtask 29-14-15-860-057-A
B. Put the aircraft back to the serviceable condition.
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the warning notices from the cockpit and from the ground service panel of the Blue hydraulic system.
Subtask 29-14-15-410-051-A
C. Close the access door 197FB.
[Rev.10 from 2021] 2026.04.01 00:24:29 UTC