Removal of the Air Pressure Gage of the Green Hydraulic System
TASK 29-14-15-000-001-A
Removal of the Air Pressure Gage of the Green Hydraulic System
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 29-14-15-865-050-A
Subtask 29-14-15-020-050-A
[Rev.10 from 2021]
2026.04.01 00:24:25 UTC
Removal of the Air Pressure Gage of the Green Hydraulic System
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
FIN: 1383GM
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 2 | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
Subtask 29-14-15-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-14-15-860-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LOW/LVL/IND | 1832GQ | N32 |
| 121VU | HYDRAULIC/HYD/QTY/IND | 1831GQ | P35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
B. Aircraft Maintenance Configuration
(1) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
(3) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(4) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(5) Disconnect the isolation coupling of the power transfer unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
4. Procedure(1) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
- In the cockpit on the hydraulic section 40VU of the overhead panel,
- On the ground service panel of the Green hydraulic system.
(3) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(4) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(5) Disconnect the isolation coupling of the power transfer unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
Subtask 29-14-15-020-050-A
A. Removal of the Air Pressure Gage
(1) Cut and remove the lockwire from the pressure gage (1) and the adapter (2).
(2) Hold the adapter (2) and remove the pressure gage (1).
(3) Install a PLUG - BLANKING in the open ends of the pressure gage (1) and the adapter (2).
(1) Cut and remove the lockwire from the pressure gage (1) and the adapter (2).
(2) Hold the adapter (2) and remove the pressure gage (1).
(3) Install a PLUG - BLANKING in the open ends of the pressure gage (1) and the adapter (2).
Air Pressure Gage