Installation of the Yellow Engine Pump
TASK 29-13-51-400-004-A
Installation of the Yellow Engine Pump
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 29-13-51-860-056-A ** ON A/C NOT FOR ALL
Subtask 29-13-51-640-053-A ** ON A/C NOT FOR ALL
Subtask 29-13-51-860-074-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:23:31 UTC
Installation of the Yellow Engine Pump
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING:
DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME AND CAN CAUSE INJURY.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| (Material No.03ABA1) | Synthetic base Lubricating Oil-Turbine Engine - - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 435 | FAN AND ACCESSORY GEARBOX |
| 436 | FAN AND ACCESSORY GEARBOX |
| 445 | FAN AND ACCESSORY GEARBOX |
| 446 | FAN AND ACCESSORY GEARBOX |
| 195BB, 198CB, 447AL | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 40 | PACKING | AIPC 29-11-51-20-040 |
| 40 | PACKING | AIPC 29-11-51-21-010 |
| 70 | ADAPTER | AIPC 29-13-38-01-010 |
| 50 | NUT | AIPC 29-13-51-02-010 |
| 45 | GASKET | AIPC 29-13-51-02-020 |
| 30 | PACKING | AIPC 29-13-51-02-040 |
| 55 | PACKING | AIPC 29-13-51-02-060 |
| 63 | BACK-UP RING | AIPC 29-13-51-02-071 |
| 60 | PACKING | AIPC 29-13-51-02-073 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-10-00-720-001-A | Functional Check of Hydraulic Fire Shut-Off Valves |
| TASK 29-13-51-860-001-A | Hydraulic Maintenance Procedure after an Engine Installation (with Engine Pump Installed) or after an Engine Pump Installation |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-24-00-864-001-A | Depressurize the Yellow Hydraulic System |
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
Subtask 29-13-51-860-056-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-24-00-864-001).
(3) Make sure that the Yellow hydraulic reservoir is depressurized (Ref. AMM TASK 29-14-00-614-001).
(4) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Yellow hydraulic system:
(6) Make sure that an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the engine.
(7) Make sure that the left fan cowl door 447AL is open (Ref. AMM TASK 71-13-00-010-040).
(8) On the ECAM control panel:
Subtask 29-13-51-941-055-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-24-00-864-001).
(3) Make sure that the Yellow hydraulic reservoir is depressurized (Ref. AMM TASK 29-14-00-614-001).
(4) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Yellow hydraulic system:
- on the ground service panel 198CB.
(6) Make sure that an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the engine.
(7) Make sure that the left fan cowl door 447AL is open (Ref. AMM TASK 71-13-00-010-040).
(8) On the ECAM control panel:
- Make sure that the HYD key is pushed.
- Make sure that the ENG2/FIRE pushbutton is released.
- Make sure that the fire shut-off valve (3046GD) is closed.
B. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Yellow hydraulic system:
Subtask 29-13-51-865-057-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
- make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to start the engine.
(3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Yellow hydraulic system:
- in the cockpit, on the HYD section of the panel 40VU.
- make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off
- make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to energize the FADEC 1(2).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/MONG | 3700GD | Q37 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/CTL | 3701GD | Q36 |
Subtask 29-13-51-640-053-A ** ON A/C NOT FOR ALL
A. Preparation before Installation
(3) Remove the blanking covers from the threads that attach the unions (15) and (25), the reducer (65) and from the ports of the pump (35).
(4) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new AIPC 29-13-51-02-071 BACK-UP RING (63) and the new AIPC 29-13-51-02-040 PACKING (30), AIPC 29-13-51-02-060 PACKING (55) and AIPC 29-13-51-02-073 PACKING (60).
Subtask 29-13-51-640-053-B ** ON A/C NOT FOR ALL CAUTION:
DO NOT APPLY LUBRICANT ON POLYAMIDE-TYPE INTERNAL COUPLING- SHAFTS WHEN YOU INSTALL THE SHAFT ON THE PUMP. IF YOU APPLY LUBRICANT, DAMAGE CAN OCCUR.
(1) Apply Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) on the new AIPC 29-11-51-21-010 PACKING (40). CAUTION:
MAKE SURE THAT THE PACKING IS IN THE CORRECT LOCATION ON THE SPLINE SHAFT. IF THE PACKING IS NOT IN THE SQUARE SECTION GROOVE, THERE IS A RISK OF OIL LEAKAGE.
(2) Install the packing (40) in the square section groove on the input splined shaft of the pump (35).(3) Remove the blanking covers from the threads that attach the unions (15) and (25), the reducer (65) and from the ports of the pump (35).
(4) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new AIPC 29-13-51-02-071 BACK-UP RING (63) and the new AIPC 29-13-51-02-040 PACKING (30), AIPC 29-13-51-02-060 PACKING (55) and AIPC 29-13-51-02-073 PACKING (60).
A. Preparation before Installation
(1) Apply Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) on the new AIPC 29-11-51-20-040 PACKING (40).
(3) Remove the blanking covers from the threads that attach the unions (15), (25), the union reducer (65) and from the ports of the pump (35).
(4) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new AIPC 29-13-51-02-071 BACK-UP RING (63) and the new AIPC 29-13-51-02-040 PACKING (30), AIPC 29-13-51-02-060 PACKING (55) and AIPC 29-13-51-02-073 PACKING (60).
Subtask 29-13-51-420-058-A ** ON A/C NOT FOR ALL (1) Apply Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) on the new AIPC 29-11-51-20-040 PACKING (40).
CAUTION:
MAKE SURE THAT THE PACKING IS IN THE CORRECT LOCATION ON THE SPLINE SHAFT. IF THE PACKING IS NOT IN THE SQUARE SECTION GROOVE, THERE IS A RISK OF OIL LEAKAGE.
CAUTION:
WHEN YOU HANDLE THE COUPLING SHAFT PACKING, MAKE SURE THAT YOU DO NOT PUT IT IN CONTACT WITH THE ALKYL PHOSPHATE ESTER BASE FLUIDS USED IN THE PUMP. IF THE PACKING COMES IN CONTACT WITH THE ALKYL PHOSPHATE ESTER BASE FLUIDS, THIS WILL DECREASE ITS SERVICE LIFE TIME.
(2) Install the packing (40) in the square section groove on the input splined shaft of the pump (35).(3) Remove the blanking covers from the threads that attach the unions (15), (25), the union reducer (65) and from the ports of the pump (35).
(4) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new AIPC 29-13-51-02-071 BACK-UP RING (63) and the new AIPC 29-13-51-02-040 PACKING (30), AIPC 29-13-51-02-060 PACKING (55) and AIPC 29-13-51-02-073 PACKING (60).
B. Installation of the Unions
(2) Install the union/reducer (65) in the pressure port of the pump (35).
(3) TORQUE the union/reducer (65) to between 1450 and 1350 lbf.in (16.39 and 15.26 m.daN )
.
(4) Install the packing (30) on the union (25).
(5) Install the union (25) in the case drain port of the pump (35).
(6) TORQUE the union/reducer (25) to between 290 and 270 lbf.in (3.28 and 3.05 m.daN )
.
(7) Install the packing (55) on the union (15).
(8) Install the union (15) in the pump (35) suction port.
(9) TORQUE the union (15) to between 940 and 860 lbf.in (10.62 and 9.72 m.daN )
.
(10) Install the new AIPC 29-13-51-02-020 GASKET (45) on the gearbox mount pad.
(11) Install the new mount AIPC 29-13-51-02-010 NUT (50) loosely on the four studs on the pump mount pad.
Subtask 29-13-51-420-055-A ** ON A/C NOT FOR ALL CAUTION:
BE CAREFUL WHEN YOU INSTALL/CONNECT PARTS ON THE PUMP TO MAKE SURE THAT THE HYDRAULIC FLUID DOES NOT FLOW OUT. THE PUMP IS FULL OF HYDRAULIC FLUID.
(1) Put the back-up ring (63) and the packing (60) on the union/reducer (65). (2) Install the union/reducer (65) in the pressure port of the pump (35).
(3) TORQUE the union/reducer (65) to between 1450 and 1350 lbf.in (16.39 and 15.26 m.daN )
. (4) Install the packing (30) on the union (25).
(5) Install the union (25) in the case drain port of the pump (35).
(6) TORQUE the union/reducer (25) to between 290 and 270 lbf.in (3.28 and 3.05 m.daN )
. (7) Install the packing (55) on the union (15).
(8) Install the union (15) in the pump (35) suction port.
(9) TORQUE the union (15) to between 940 and 860 lbf.in (10.62 and 9.72 m.daN )
. (10) Install the new AIPC 29-13-51-02-020 GASKET (45) on the gearbox mount pad.
(11) Install the new mount AIPC 29-13-51-02-010 NUT (50) loosely on the four studs on the pump mount pad.
C. Installation of the Yellow-Engine Pump Vickers
(1) Put the pump (35) in position on the gearbox mount pad through the large holes in the pump flange.
(2) Turn the pump (35) counterclockwise until it touches the studs.
(3) Install the new nuts (50) on the studs of the mount pad and turn the nuts (50) until you feel resistance.
(4) Do a running torque check of the nuts (50) with a WRENCH - TORQUE.
(a) Set the WRENCH - TORQUE to 9.5 lbf.in (0.11 m.daN) and turn each nut (50) in the tightening direction. The nut(s) (50) must not turn before the set torque value.
(b) If the nut(s) (50) turns (turn) before you get 9.5 lbf.in (0.11 m.daN) torque, replace the nut(s) (50) and do step (4) again for each replacement nut (50).
(c) If the running torque check is correct, do not remove the nut(s) (50) from the stud(s) and do the next step (5).
(5) TORQUE the nuts (50) to between 320 and 260 lbf.in (3.62 and 2.94 m.daN )
.
(6) Remove the blanking covers from the hose couplings.
(7) Connection of the case drain hose:
(8) TORQUE the case drain-hose coupling-nut to between 245 and 215 lbf.in (2.77 and 2.43 m.daN )
.
(a) Use a second WRENCH - TORQUE to hold the union (25) when you torque the case drain-hose coupling-nut.
(9) Make sure that the seal of the adapter (70) is in correct position and condition.
(a) If the seal of the adapter (70) is damaged, replace the AIPC 29-13-38-01-010 ADAPTER (70).
(10) Connect the suction hose adapter (70) to the union (15) in the pump (35) suction port.
(11) Connect the suction hose (10) to the adapter (70).
(12) TORQUE the coupling nut of the suction hose (10) to the adapter (70) to between 900 and 800 lbf.in (10.17 and 9.04 m.daN )
.
(13) TORQUE the coupling nut of the adapter (70) to the union (15) to between 900 and 800 lbf.in (10.17 and 9.04 m.daN )
.
(a) Use the second WRENCH - TORQUE to hold the union (15) when you torque the hose adapter (70) coupling-nut.
(14) Connect the pressure hose (5) to the reducer (65).
(15) TORQUE the hose (5) coupling nut to between 1000 and 900 lbf.in (11.30 and 10.17 m.daN )
.
(a) Use the second WRENCH - TORQUE to hold the union/reducer (65) when you torque the hose coupling nut.
(16) Remove the protective cover from the electrical connector (3030GDA).
(17) Connect the electrical connector (3030GDA) to the pump (35).
(a) Make sure that all the electrical connections are clean and in the correct condition.
(b) Align the master-key (largest key) on the connector with the master-key in the receptacle.
(c) Use light hand pressure and push the connector in the receptacle. Turn the coupling nut clockwise to engage the connector threads.
(d) Tighten the connection.
Subtask 29-13-51-420-067-A ** ON A/C NOT FOR ALL (1) Put the pump (35) in position on the gearbox mount pad through the large holes in the pump flange.
(2) Turn the pump (35) counterclockwise until it touches the studs.
(3) Install the new nuts (50) on the studs of the mount pad and turn the nuts (50) until you feel resistance.
(4) Do a running torque check of the nuts (50) with a WRENCH - TORQUE.
(a) Set the WRENCH - TORQUE to 9.5 lbf.in (0.11 m.daN) and turn each nut (50) in the tightening direction. The nut(s) (50) must not turn before the set torque value.
(b) If the nut(s) (50) turns (turn) before you get 9.5 lbf.in (0.11 m.daN) torque, replace the nut(s) (50) and do step (4) again for each replacement nut (50).
(c) If the running torque check is correct, do not remove the nut(s) (50) from the stud(s) and do the next step (5).
(5) TORQUE the nuts (50) to between 320 and 260 lbf.in (3.62 and 2.94 m.daN )
. (6) Remove the blanking covers from the hose couplings.
(7) Connection of the case drain hose:
CAUTION:
BE CAREFUL WHEN YOU INSTALL/CONNECT PARTS ON THE PUMP TO MAKE SURE THAT THE HYDRAULIC FLUID DOES NOT FLOW OUT. THE PUMP IS FULL OF HYDRAULIC FLUID.
(a) Connect the case drain hose (20) to the union (25): (8) TORQUE the case drain-hose coupling-nut to between 245 and 215 lbf.in (2.77 and 2.43 m.daN )
. (a) Use a second WRENCH - TORQUE to hold the union (25) when you torque the case drain-hose coupling-nut.
(9) Make sure that the seal of the adapter (70) is in correct position and condition.
(a) If the seal of the adapter (70) is damaged, replace the AIPC 29-13-38-01-010 ADAPTER (70).
(10) Connect the suction hose adapter (70) to the union (15) in the pump (35) suction port.
(11) Connect the suction hose (10) to the adapter (70).
(12) TORQUE the coupling nut of the suction hose (10) to the adapter (70) to between 900 and 800 lbf.in (10.17 and 9.04 m.daN )
. (13) TORQUE the coupling nut of the adapter (70) to the union (15) to between 900 and 800 lbf.in (10.17 and 9.04 m.daN )
. (a) Use the second WRENCH - TORQUE to hold the union (15) when you torque the hose adapter (70) coupling-nut.
(14) Connect the pressure hose (5) to the reducer (65).
(15) TORQUE the hose (5) coupling nut to between 1000 and 900 lbf.in (11.30 and 10.17 m.daN )
. (a) Use the second WRENCH - TORQUE to hold the union/reducer (65) when you torque the hose coupling nut.
(16) Remove the protective cover from the electrical connector (3030GDA).
(17) Connect the electrical connector (3030GDA) to the pump (35).
(a) Make sure that all the electrical connections are clean and in the correct condition.
(b) Align the master-key (largest key) on the connector with the master-key in the receptacle.
(c) Use light hand pressure and push the connector in the receptacle. Turn the coupling nut clockwise to engage the connector threads.
(d) Tighten the connection.
CAUTION:
YOU MUST NOT STOP AT THE COLORED COUPLING INDICATOR LINE ON THE RECEPTACLE WHEN YOU TIGHTEN THE CONNECTOR. IF YOU STOP AT THE COLORED LINE THE CONNECTION WILL NOT BE TIGHT. THIS CAN CAUSE MECHANICAL AND/OR ELECTRICAL FAILURE.
1 With the threads correctly engaged, continue to turn the coupling nut clockwise with your hand until the connection is tight. Make sure that you can not see the colored coupling indicator line on the receptacle when the connection is fully tight. NOTE: If you move the connector from side to side when you turn the coupling nut it will make it easier to tighten.
(e) Use PLIERS - CONNECTOR, JAW, SOFT. CAUTION:
YOU MUST NOT USE PLIERS WITH METAL JAWS TO TIGHTEN OR LOOSEN THE CONNECTOR. THE METAL JAWS WILL CAUSE DAMAGE TO THE CONNECTOR.
1 Turn the connector ring from one eighth to a quarter of a turn with PLIERS - CONNECTOR, JAW, SOFT or WRENCH GLENAIR TG70 - STRAP to make sure that the connector is tight. Stop before the pliers or strap wrench moves but does no catch on the connector ring. D. Installation of the Yellow-Engine Pump Abex
(1) Put the pump (35) in position on the gearbox mount pad with the nuts (50) through the large holes in the pump flange.
(2) Turn the pump (35) counterclockwise until it touches the studs.
(3) Do a running torque check of the nuts with a WRENCH - TORQUE.
(b) Set the WRENCH - TORQUE to 9.5 lbf.in (0.11 m.daN) and turn each nut in the tightening direction. The nut(s) must not turn before the set torque value.
(c) If the nut(s) turn before you get 9.5 lbf.in (0.11 m.daN) torque, replace the nut(s) and do step (3) again for each replacement nut.
(d) If the running torque check is correct, do not remove the nut(s) from the stud(s) and do the next step (4).
(4) TORQUE the nuts (50) to between 320 and 260 lbf.in (3.62 and 2.94 m.daN )
.
(5) Remove the blanking covers from the hose couplings.
(6) Connection of the case drain hose:
(7) TORQUE the coupling nut to between 245 and 215 lbf.in (2.77 and 2.43 m.daN )
.
(a) Use a second WRENCH - TORQUE to hold the union (25) when you torque the hose coupling nut.
(8) Make sure that the seal of the adapter (70) is in correct position and condition.
(a) If the seal of the adapter (70) is damaged, replace the AIPC 29-13-38-01-010 ADAPTER (70).
(9) Connect the suction hose adapter (70) to the union (15) in the pump (35) suction port.
(10) Connect the suction hose (10) to the adapter (70).
(11) TORQUE the coupling nut of the suction hose (10) to the adapter (70) to between 900 and 800 lbf.in (10.17 and 9.04 m.daN )
.
(12) TORQUE the coupling nut of the adapter (70) to the union (15) to between 900 and 800 lbf.in (10.17 and 9.04 m.daN )
.
(a) Use the second WRENCH - TORQUE to hold the union (15) when you torque the hose adapter (70) coupling-nut.
(13) Connect the pressure hose (5) to the union/reducer (65).
(14) TORQUE the hose (5) coupling nut to between 1000 and 900 lbf.in (11.30 and 10.17 m.daN )
.
(a) Use the second WRENCH - TORQUE to hold the union/reducer (65) when you torque the hose coupling nut.
(15) Remove the protective cover from the electrical connector (3030GDA).
(16) Connect the electrical connector (3030GDA) to the pump (35).
(a) Make sure that all the electrical connections are clean and in the correct condition.
(b) Align the master-key (largest key) on the connector with the master-key in the receptacle.
(c) Use light hand pressure and push the connector in the receptacle. Turn the coupling nut clockwise to engage the connector threads.
(d) Tighten the connection.
Subtask 29-13-51-865-058-A ** ON A/C NOT FOR ALL (1) Put the pump (35) in position on the gearbox mount pad with the nuts (50) through the large holes in the pump flange.
(2) Turn the pump (35) counterclockwise until it touches the studs.
(3) Do a running torque check of the nuts with a WRENCH - TORQUE.
CAUTION:
DISCARD THE NUT(S) IF YOU CAN TURN THEM BY HAND WITH NO RESISTANCE.
(a) Install new nuts (50) on the studs of the mount pad and turn the nuts until you feel resistance. (b) Set the WRENCH - TORQUE to 9.5 lbf.in (0.11 m.daN) and turn each nut in the tightening direction. The nut(s) must not turn before the set torque value.
(c) If the nut(s) turn before you get 9.5 lbf.in (0.11 m.daN) torque, replace the nut(s) and do step (3) again for each replacement nut.
(d) If the running torque check is correct, do not remove the nut(s) from the stud(s) and do the next step (4).
(4) TORQUE the nuts (50) to between 320 and 260 lbf.in (3.62 and 2.94 m.daN )
. (5) Remove the blanking covers from the hose couplings.
(6) Connection of the case drain hose:
CAUTION:
BE CAREFUL WHEN YOU INSTALL/CONNECT PARTS ON THE PUMP TO MAKE SURE THAT THE HYDRAULIC FLUID DOES NOT FLOW OUT. THE PUMP IS FULL OF HYDRAULIC FLUID.
(a) Connect the case drain hose (20) to the union (25). (7) TORQUE the coupling nut to between 245 and 215 lbf.in (2.77 and 2.43 m.daN )
. (a) Use a second WRENCH - TORQUE to hold the union (25) when you torque the hose coupling nut.
(8) Make sure that the seal of the adapter (70) is in correct position and condition.
(a) If the seal of the adapter (70) is damaged, replace the AIPC 29-13-38-01-010 ADAPTER (70).
(9) Connect the suction hose adapter (70) to the union (15) in the pump (35) suction port.
(10) Connect the suction hose (10) to the adapter (70).
(11) TORQUE the coupling nut of the suction hose (10) to the adapter (70) to between 900 and 800 lbf.in (10.17 and 9.04 m.daN )
. (12) TORQUE the coupling nut of the adapter (70) to the union (15) to between 900 and 800 lbf.in (10.17 and 9.04 m.daN )
. (a) Use the second WRENCH - TORQUE to hold the union (15) when you torque the hose adapter (70) coupling-nut.
(13) Connect the pressure hose (5) to the union/reducer (65).
(14) TORQUE the hose (5) coupling nut to between 1000 and 900 lbf.in (11.30 and 10.17 m.daN )
. (a) Use the second WRENCH - TORQUE to hold the union/reducer (65) when you torque the hose coupling nut.
(15) Remove the protective cover from the electrical connector (3030GDA).
(16) Connect the electrical connector (3030GDA) to the pump (35).
(a) Make sure that all the electrical connections are clean and in the correct condition.
(b) Align the master-key (largest key) on the connector with the master-key in the receptacle.
(c) Use light hand pressure and push the connector in the receptacle. Turn the coupling nut clockwise to engage the connector threads.
(d) Tighten the connection.
CAUTION:
YOU MUST NOT STOP AT THE COLORED COUPLING INDICATOR LINE ON THE RECEPTACLE WHEN YOU TIGHTEN THE CONNECTOR. IF YOU STOP AT THE COLORED LINE THE CONNECTION WILL NOT BE TIGHT. THIS CAN CAUSE MECHANICAL AND/OR ELECTRICAL FAILURE.
1 With the threads correctly engaged, continue to turn the coupling nut clockwise with your hand until the connection is tight. Make sure that the colored coupling indicator line on the receptacle cannot be seen when the connection is fully tight. NOTE: If you move the connector from side to side when you turn the coupling nut it will make it easier to tighten.
(e) Use PLIERS - CONNECTOR, JAW, SOFT. CAUTION:
YOU MUST NOT USE PLIERS WITH METAL JAWS TO TIGHTEN OR LOOSEN THE CONNECTOR. THE METAL JAWS WILL CAUSE DAMAGE TO THE CONNECTOR.
1 Turn the connector ring from one eighth to a quarter of a turn with PLIERS - CONNECTOR, JAW, SOFT or WRENCH GLENAIR TG70 - STRAP to make sure that the connector is tight. Stop before the pliers or strap wrench moves but does no catch on the connector ring. E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 29-13-51-860-063-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/MONG | 3700GD | Q37 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/CTL | 3701GD | Q36 |
F. Do the hydraulic maintenance procedure after an engine pump installation (Ref. AMM TASK 29-13-51-860-001).
5. Close-upSubtask 29-13-51-860-074-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) On the ECAM control panel, push the HYD key:
Subtask 29-13-51-942-052-A ** ON A/C NOT FOR ALL (1) On the ECAM control panel, push the HYD key:
- On the SD, the HYD page comes into view.
- Push the ENG2/FIRE pushbutton switch.
- Make sure that the fire shut-off valve (3046GD) is opened.
B. Remove the safety precautions
(1) Remove the container.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Make sure that the work area is clean and clear of tools and other items.
Subtask 29-13-51-410-052-A ** ON A/C NOT FOR ALL (1) Remove the container.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Make sure that the work area is clean and clear of tools and other items.
C. Close Access
(1) Close the left fan cowl door (Ref. AMM TASK 71-13-00-410-040):
(a) FOR [1000EM2] (ENGINE-2)
Close the door 447AL.
Subtask 29-13-51-862-051-A ** ON A/C NOT FOR ALL (1) Close the left fan cowl door (Ref. AMM TASK 71-13-00-410-040):
(a) FOR [1000EM2] (ENGINE-2)
Close the door 447AL.
Yellow Engine Pump (Vickers)