Replacement of the Clogging Indicator
TASK 29-13-45-960-001-A
Replacement of the Clogging Indicator
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 29-13-45-865-052-A
Subtask 29-13-45-020-051-A
Subtask 29-13-45-860-054-A
[Rev.10 from 2021]
2026.04.01 00:21:51 UTC
Replacement of the Clogging Indicator
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | CONTAINER 1 L (1/4 USGAL) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 196BB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 7 | PACKING | AIPC 29-13-45-01-050 |
| 8 | PACKING | AIPC 29-13-45-01-060 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-863-002-A | Pressurize the Yellow Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-864-002-A | Depressurize the Yellow Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
Subtask 29-13-45-865-052-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-13-45-941-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
B. Safety Precautions
(1) Put a WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
Subtask 29-13-45-010-052-A Subtask 29-13-45-860-053-A (1) Put a WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panel of the Yellow hydraulic system.
D. Aircraft Maintenance Configuration
(2) Make sure that the Yellow hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(4) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(5) Put the CONTAINER 1 L (1/4 USGAL) below the filter to collect the unwanted hydraulic fluid.
4. ProcedureWARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Make sure that the Yellow hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(4) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(5) Put the CONTAINER 1 L (1/4 USGAL) below the filter to collect the unwanted hydraulic fluid.
Subtask 29-13-45-020-051-A
A. Removal of the Clogging Indicator
(1) Loosen and remove the clogging indicator (4) from the filter head (1).
(2) Remove and discard the packings (7) and (8) from the clogging indicator (4).
(3) Remove and retain the ring (6) from the clogging indicator (4).
Subtask 29-13-45-560-051-A (1) Loosen and remove the clogging indicator (4) from the filter head (1).
(2) Remove and discard the packings (7) and (8) from the clogging indicator (4).
(3) Remove and retain the ring (6) from the clogging indicator (4).
B. Preparation for Installation
(1) Put the ring (6) on the clogging indicator (4).
(2) Lubricate the new AIPC 29-13-45-01-050 PACKING (7) and the new AIPC 29-13-45-01-060 PACKING (8) with the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) and install them on the clogging indicator (4).
(3) Lubricate the threads of the clogging indicator (4) with the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
Subtask 29-13-45-420-051-A (1) Put the ring (6) on the clogging indicator (4).
(2) Lubricate the new AIPC 29-13-45-01-050 PACKING (7) and the new AIPC 29-13-45-01-060 PACKING (8) with the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) and install them on the clogging indicator (4).
(3) Lubricate the threads of the clogging indicator (4) with the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
C. Installation of the Clogging Indicator
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the new clogging indicator (4) in the filter head (1).
Subtask 29-13-45-942-052-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the new clogging indicator (4) in the filter head (1).
D. Safety Precautions
(1) Remove the WARNING NOTICE(S).
Subtask 29-13-45-865-053-A (1) Remove the WARNING NOTICE(S).
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 29-13-45-790-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
F. Test of the Filter Assembly
(1) Pressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(2) Pressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-863-002).
(3) Make sure that the clogging indicator stays in.
(4) Make sure that no hydraulic fluid comes out of the filter assembly.
(5) Depressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-864-002).
5. Close-up(1) Pressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(2) Pressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-863-002).
(3) Make sure that the clogging indicator stays in.
(4) Make sure that no hydraulic fluid comes out of the filter assembly.
(5) Depressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-864-002).
Subtask 29-13-45-860-054-A
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the fluid level in the Yellow reservoir is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(2) Remove the container from below the filter.
(3) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(4) Make sure that the work area is clean and clear of tools and other items.
Subtask 29-13-45-410-051-A (1) Make sure that the fluid level in the Yellow reservoir is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(2) Remove the container from below the filter.
(3) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(4) Make sure that the work area is clean and clear of tools and other items.
HP Filter