Removal of the Low Level Switch of the Yellow Hydraulic Reservoir
TASK 29-13-41-000-004-A
Removal of the Low Level Switch of the Yellow Hydraulic Reservoir
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-13-41-865-060-A
Subtask 29-13-41-020-052-A
[Rev.10 from 2021]
2026.04.01 00:21:13 UTC
Removal of the Low Level Switch of the Yellow Hydraulic Reservoir
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | BAG - PLASTIC |
| No specific | 2 | CAP - BLANKING |
| No specific | 1 | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 196BB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-680-002-A | Drainage of the Reservoir of the Yellow Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
Subtask 29-13-41-865-060-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-13-41-941-056-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LOW/LVL/IND | 1832GQ | N32 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
B. Safety Precautions
(2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
Subtask 29-13-41-010-055-A Subtask 29-13-41-860-060-A WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Yellow hydraulic system.
D. Aircraft Maintenance Configuration
(1) Make sure that the Yellow hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(2) Depressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(3) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(4) Drain the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-10-00-680-002).
4. Procedure(1) Make sure that the Yellow hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(2) Depressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(3) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(4) Drain the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-10-00-680-002).
Subtask 29-13-41-020-052-A
A. Removal of the Low Level Switch
(1) Disconnect the electrical connector (11).
(2) Put a CAP - BLANKING on the disconnected electrical connector (11) and on the receptacle.
(3) Remove the bolts (10) and the washers (9).
(4) Remove the low level switch (8) from the reservoir (1).
(5) Discard the O-ring (7).
(6) Put the PLUG - BLANKING in the port of the reservoir (1).
(7) Put the low level switch (8) into a BAG - PLASTIC to keep it clean.
(1) Disconnect the electrical connector (11).
(2) Put a CAP - BLANKING on the disconnected electrical connector (11) and on the receptacle.
(3) Remove the bolts (10) and the washers (9).
(4) Remove the low level switch (8) from the reservoir (1).
(5) Discard the O-ring (7).
(6) Put the PLUG - BLANKING in the port of the reservoir (1).
(7) Put the low level switch (8) into a BAG - PLASTIC to keep it clean.
Quantity Indicator and Low Level Switch