Installation of the Accumulator-Gas Charging Valve
TASK 29-12-22-400-001-A
Installation of the Accumulator-Gas Charging Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 29-12-22-860-051-A
Subtask 29-12-22-420-050-A
Subtask 29-12-22-860-053-A
[Rev.10 from 2021]
2026.04.01 00:19:01 UTC
Installation of the Accumulator-Gas Charging Valve
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| (Material No.14CCB6) | Testing Medium-Leak Detection - Oxygen System |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 195 | HYDRAULIC COMPT AND FAIRINGS |
| 195BB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 3 | 0-RING | AIPC 29-14-14-01-010 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 12-14-29-614-001-A | Fill the Hydraulic Power Accumulators with Nitrogen |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-863-003-A | Pressurize the Blue Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-863-003-A-01 | Pressurize the Blue Hydraulic System with the Blue Electric Pump |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
Subtask 29-12-22-860-051-A
A. Aircraft Maintenance Configuration
(2) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Blue hydraulic system:
(Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that the reservoir of the Blue hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the access door 195BB is open .
Subtask 29-12-22-865-051-A WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Blue hydraulic system:
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panel of the Blue hydraulic system.
(Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that the reservoir of the Blue hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the access door 195BB is open .
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
| 121VU | HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST | 1881GP | N35 |
| 123VU | B HYD/ELEC PUMP | 2701GJ | AB09 |
Subtask 29-12-22-420-050-A
A. Installation of the Gas Charging-Valve
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the PLUG - BLANKING from the adapter (2).
(4) Remove the CAP - BLANKING from the gas charging-valve (4).
(5) Apply the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the gas charging-valve (4) connection.
(6) Make sure that the 0-ring seal (3) is installed on the gas charging-valve (4).
(7) If the removed charging-valve (4) is to be installed, remove the used 0-ring seal (3) and install a new AIPC 29-14-14-01-010 0-RING (3)
(8) Install the gas charging-valve (4) on the adapter (2).
(9) TORQUE the gas charging-valve (4) to between 3.44 and 3.34 m.daN (25.37 and 24.63 lbf.ft )
.
(10) Safety the gas charging-valve (4) with the lockwire14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
Subtask 29-12-22-860-052-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the PLUG - BLANKING from the adapter (2).
(4) Remove the CAP - BLANKING from the gas charging-valve (4).
(5) Apply the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the gas charging-valve (4) connection.
(6) Make sure that the 0-ring seal (3) is installed on the gas charging-valve (4).
(7) If the removed charging-valve (4) is to be installed, remove the used 0-ring seal (3) and install a new AIPC 29-14-14-01-010 0-RING (3)
(8) Install the gas charging-valve (4) on the adapter (2).
(9) TORQUE the gas charging-valve (4) to between 3.44 and 3.34 m.daN (25.37 and 24.63 lbf.ft )
. (10) Safety the gas charging-valve (4) with the lockwire
B. Preparation for Test
(1) Fill the accumulator with nitrogen (Ref. AMM TASK 12-14-29-614-001).
(2) Close the gas charging-valve nut (5).
(3) Torque the gas charging-valve nut (5) to between 60.00 and 50.00 lbf.in (0.68 and 0.57 m.daN )
.
(4) Remove the WARNING NOTICE(S) from the cockpit and the ground service panel.
(5) Pressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(6) Make sure that the fluid level in the reservoir of the Blue hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(7) Pressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-863-003).
Subtask 29-12-22-790-050-A (1) Fill the accumulator with nitrogen (Ref. AMM TASK 12-14-29-614-001).
(2) Close the gas charging-valve nut (5).
(3) Torque the gas charging-valve nut (5) to between 60.00 and 50.00 lbf.in (0.68 and 0.57 m.daN )
. (4) Remove the WARNING NOTICE(S) from the cockpit and the ground service panel.
(5) Pressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(6) Make sure that the fluid level in the reservoir of the Blue hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(7) Pressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-863-003).
C. Test
(1) Apply the leak detector Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the connections of the gas charging-valve (4), the adapter (2) and the endcap (6). Make sure that there are no leaks.
5. Close-up(1) Apply the leak detector Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the connections of the gas charging-valve (4), the adapter (2) and the endcap (6). Make sure that there are no leaks.
Subtask 29-12-22-860-053-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 195BB.
Subtask 29-12-22-865-052-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 195BB.
Gas Charging Valve