W DOC AIRBUS | AMM A320F

Installation of the Blue Electric Pump Phase-Unbalance Detector


TASK 29-12-18-400-001-A
Installation of the Blue Electric Pump Phase-Unbalance Detector


FIN: 2707GJ
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
822
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 29-12-00-710-002-A
Operational Test of the Phase Unbalance Detector and the Current Transformer of the Blue Hydraulic System
3. Job Set-up
Subtask 29-12-18-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the access door 822.
   (2) Open the access door 822.
Subtask 29-12-18-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
123VUB HYD/ELEC PUMP2701GJAB09
4. Procedure
Subtask 29-12-18-420-050-A
A. Installation of the Blue Electric Pump Phase-Unbalance Detector
   (1) Install the detector (1) on the support.
   (2) Install the washers (2) and the screws (3).
   (3) Remove the blanking cap from the electrical connector (4).
   (4) Connect the electrical connector (4) to the detector (1).
Subtask 29-12-18-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
123VUB HYD/ELEC PUMP2701GJAB09
Subtask 29-12-18-710-050-A
C. Operational Test
   (1) Do the operational test of the detector (Ref. AMM TASK 29-12-00-710-002).
5. Close-up
Subtask 29-12-18-410-051-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 822.
   (3) Remove the access platform(s).