Removal of the Blue Electric Pump Phase-Unbalance Detector
TASK 29-12-18-000-001-A
Removal of the Blue Electric Pump Phase-Unbalance Detector
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-12-18-865-050-A
Subtask 29-12-18-020-051-A
[Rev.10 from 2021]
2026.04.01 00:18:57 UTC
Removal of the Blue Electric Pump Phase-Unbalance Detector
FIN: 2707GJ
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 29-12-18-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-12-18-010-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
| 123VU | B HYD/ELEC PUMP | 2701GJ | AB09 |
B. Get access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 822.
(2) Open the access door 822.
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 822.
(2) Open the access door 822.
Subtask 29-12-18-020-051-A
A. Removal of the Blue Electric Pump Phase-Unbalance Detector
(1) Disconnect the electrical connector (4) from the detector (1).
(2) Put a CAP - BLANKING on the disconnected electrical connector (4).
(3) Remove the screws (3) and the washers (2).
(4) Remove the detector (1).
(1) Disconnect the electrical connector (4) from the detector (1).
(2) Put a CAP - BLANKING on the disconnected electrical connector (4).
(3) Remove the screws (3) and the washers (2).
(4) Remove the detector (1).
Blue Electric Pump Phase-Unbalance Detector