Removal of the Green Power Accumulator
TASK 29-11-42-000-001-A
Removal of the Green Power Accumulator
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-11-42-865-050-A
Subtask 29-11-42-614-051-A
[Rev.10 from 2021]
2026.04.02 06:18:35 UTC
Removal of the Green Power Accumulator
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | 1 | CONTAINER - HYDRAULIC FLUID RESISTANT |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 147 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
Subtask 29-11-42-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-11-42-860-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
B. Aircraft Maintenance Configuration
(2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
(4) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001).
(6) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(7) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.
(8) Put a CONTAINER - HYDRAULIC FLUID RESISTANT below the accumulator to collect any hydraulic fluid.
4. ProcedureWARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Green hydraulic system.
(4) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001).
(6) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(7) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.
(8) Put a CONTAINER - HYDRAULIC FLUID RESISTANT below the accumulator to collect any hydraulic fluid.
Subtask 29-11-42-614-051-A
A. Release the nitrogen pressure from the accumulator as follows:
(1) Remove the endcap from the charging valve (13).
(2) Turn the nut to the OPEN position and release the nitrogen pressure.
Subtask 29-11-42-020-050-A (1) Remove the endcap from the charging valve (13).
(2) Turn the nut to the OPEN position and release the nitrogen pressure.
B. Removal of the Power Accumulator
(2) Remove the union (2) from the accumulator assembly.
(3) Remove the nut (3) and washer (4) from the union (5).
(4) Hold the accumulator assembly, loosen the two clamp screws and remove the two clamps (7).
(5) Remove the accumulator from the mounting.
(6) Close the open ends of the accumulator assembly and the hydraulic line with a CAP - BLANKING.
CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
(1) Loosen the union nut (1) and the union (2) and disconnect the hydraulic line from the union (2). (2) Remove the union (2) from the accumulator assembly.
(3) Remove the nut (3) and washer (4) from the union (5).
(4) Hold the accumulator assembly, loosen the two clamp screws and remove the two clamps (7).
(5) Remove the accumulator from the mounting.
(6) Close the open ends of the accumulator assembly and the hydraulic line with a CAP - BLANKING.
Green Power Accumulator