W DOC AIRBUS | AMM A320F

Installation of the Accumulator-Gas Charging Valve


TASK 29-11-22-400-001-A
Installation of the Accumulator-Gas Charging Valve


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 147
FIN: 1071GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
1
CAP - BLANKING
No specific
1
PLUG - BLANKING
No specific
1
WARNING NOTICE(S)
No specific
Torque wrench: range to between 60.00 and 50.00 lbf.in (0.68 and 0.57 m.daN ) T
No specific
Torque wrench: range to between 3.44 and 3.34 m.daN (25.37 and 24.63 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
(Material No.14CCB6)
Testing Medium-Leak Detection - Oxygen System
(Material No.14QFB1)
Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
147
MAIN GEAR WELL AND HYDRAULIC COMPARTMENT
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
0-RING
AIPC 29-14-14-01-010
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 12-12-29-611-002-A
Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart
TASK 12-14-29-614-001-A
Fill the Hydraulic Power Accumulators with Nitrogen
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-863-001-A
Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-863-001-A
Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
3. Job Set-up
Subtask 29-11-22-860-051-A
A. Aircraft Maintenance Configuration
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Green hydraulic system:
  • In the cockpit on the hydraulic section 40VU of the overhead panel
  • On the ground service panel of the Green hydraulic system.
   (3) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (4) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (5) Make sure that the left main door of the main gear is open (Ref. AMM TASK 32-12-00-010-001).
   (6) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at the left door of the main gear.
   (7) Make sure that the isolation coupling of the Power Transfer Unit (PTU) is disconnected (Ref. AMM TASK 29-23-00-860-001).
Subtask 29-11-22-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST1881GPN35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
4. Procedure
Subtask 29-11-22-420-050-B
A. Installation of the Gas Charging-Valve (1071GM)
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the PLUG - BLANKING from the adapter (2).
   (4) Remove the CAP - BLANKING from the gas charging-valve (4).
   (5) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the gas charging-valve connection.
   (6) Make sure that the O-ring seal (3) is installed on the gas charging-valve (4).
   (7) If the removed charging-valve (4) is to be installed, remove the used O-ring seal (3) and install the new AIPC 29-14-14-01-010 0-RING (3).
   (8) Install the gas charging-valve (4) on the adapter (2).
   (9) TORQUE the gas charging-valve (4) to between 3.44 and 3.34 m.daN (25.37 and 24.63 lbf.ft )
T.
   (10) Safety the gas charging-valve with the lockwire 14QFB1Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -.
Subtask 29-11-22-860-052-A
B. Preparation for Test
   (1) Fill the accumulator with nitrogen (
Ref. AMM TASK 12-14-29-614-001).
   (2) Close the gas charging-valve nut (5).
   (3) TORQUE the gas charging-valve nut (5) to between 60.00 and 50.00 lbf.in (0.68 and 0.57 m.daN ) T.
   (4) Install the endcap (6) on the gas charging-valve (4).
   (5) Remove the WARNING NOTICE(S).
   (6) Pressurize the reservoir of the Green hydraulic system (
Ref. AMM TASK 29-14-00-614-002).
   (7) Make sure that the fluid level in the reservoir of the Green hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
   (8) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
Subtask 29-11-22-790-050-A
C. Test
   (1) Apply the leak detector Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the connections of the gas charging-valve (4), the adapter (2) and the endcap (6). Make sure that there are no leaks.
5. Close-up
Subtask 29-11-22-860-053-A
A. Put the aircraft back to the serviceable condition.
   (1) Connect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-002).
   (2) Make sure that the work area is clean and clear of tools and other items.
   (3) Remove the access platform(s).
   (4) Close the left main door of the main gear (Ref. AMM TASK 32-12-00-410-001).
Subtask 29-11-22-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST1881GPN35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33