W DOC AIRBUS | AMM A320F

Removal of the Accumulator-Air Pressure Gage


TASK 29-11-21-000-001-A
Removal of the Accumulator-Air Pressure Gage


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
ZONE: 147
FIN: 1072GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
2
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
2
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
147
MAIN GEAR WELL AND HYDRAULIC COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
3. Job Set-up
Subtask 29-11-21-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST1881GPN35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
Subtask 29-11-21-860-052-A
B. Aircraft Maintenance Configuration
   (1) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
  • in the cockpit on the hydraulic section 40VU of the overhead panel,
  • on the ground service panel of the Green hydraulic system.
   (2) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (3) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001).
   (4) Open the left main door of the main gear (Ref. AMM TASK 32-12-00-010-001).
   (5) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the left door of the main gear.
   (6) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
4. Procedure
Subtask 29-11-21-614-051-A
A. Depressurization of the Power Accumulator (1070GM)
   (1) Remove the endcap from the charging valve (5).
   (2) Turn the nut to the OPEN position and release the nitrogen pressure.
Subtask 29-11-21-020-050-A
B. Removal of the Pressure Gage
   (1) Cut, remove and discard the lockwire from the pressure gage (2).
   (2) Hold the pressure gage (2) and release the nut (3).
   (3) Remove the pressure gage (2).
   (4) Install a PLUG - BLANKING on the pressure gage and the adapter.