W DOC AIRBUS | AMM A320F

Reactivation of the Drain Valves of the Green, Yellow and Blue Hydraulic Reservoirs


TASK 29-10-00-440-007-A
Reactivation of the Drain Valves of the Green, Yellow and Blue Hydraulic Reservoirs


WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
ZONE: 147
ZONE: 190
ZONE: 196
FIN: 2264GM
1. Reason for the Job
MMEL 29-10-10A
HYDRAULIC RESERVOIR DRAIN VALVE
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CONTAINER - HYDRAULIC FLUID RESISTANT
No specific
1
WRENCH - SPANNER, FLAT
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
147
MAIN GEAR WELL AND HYDRAULIC COMPARTMENT
190
BELLY FAIR, AIR CONDITIONING & HYD COMPT
196
HYDRAULIC COMPT AND FAIRINGS
191GB, 196BB, 197EB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 12-12-29-611-002-A
Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-11-41-000-004-A
Removal of the Drain Valve of the Green Hydraulic Reservoir
TASK 29-11-41-400-004-A
Installation of the Drain Valve of the Green Hydraulic Reservoir
TASK 29-12-35-000-001-A
Removal of the Reservoir Drain Valve
TASK 29-12-35-400-001-A
Installation of the Reservoir Drain Valve
TASK 29-13-41-000-005-A
Removal of the Drain Valve of the Yellow Reservoir
TASK 29-13-41-400-005-A
Installation of the Drain Valve of the Yellow Reservoir
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
3. Job Set-up
Subtask 29-10-00-860-130-A
A. Aircraft Maintenance Configuration
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration
(Ref. AMM TASK 29-00-00-864-001).
   (3) Put the CONTAINER - HYDRAULIC FLUID RESISTANT below the related drain valve.
Subtask 29-10-00-010-099-A
B. Get Access
   (1) Open the related service panel doors:
     (a) For the Yellow hydraulic drain valve: 196BB.
     (b) For the Green hydraulic drain valve: right MLG door (Ref. AMM TASK 32-12-00-010-001).
     (c) For the Blue hydraulic drain valve: 197EB.
   (2) Open Electrical Service Panel door 191GB and set the HYD COMPT WHEEL WELL LIGHT to the ON position.
4. Procedure
Subtask 29-10-00-440-054-A
A. Reactivation of the Drain Valve of the Green Hydraulic Reservoir
   (1) Use the WRENCH - SPANNER, FLAT to hold the drain valve (1) in position.
   (2) Remove the cap (2) from the drain valve (1).
   (3) Replace the drain valve (1) (Ref. AMM TASK 29-11-41-000-004) (Ref. AMM TASK 29-11-41-400-004).
Subtask 29-10-00-440-055-A
B. Reactivation of the Drain Valve of the Blue Hydraulic Reservoir
   (1) Use the WRENCH - SPANNER, FLAT to hold the drain valve (1) in position.
   (2) Remove the cap (2) from the drain valve (1).
   (3) Replace the drain valve (1) (Ref. AMM TASK 29-12-35-000-001) (Ref. AMM TASK 29-12-35-400-001).
Subtask 29-10-00-440-056-A
C. Reactivation of the Drain Valve of the Yellow Hydraulic Reservoir
   (1) Use the WRENCH - SPANNER, FLAT to hold the drain valve (1) in position.
   (2) Remove the cap (2) from the drain valve (1).
   (3) Replace the drain valve (1) (Ref. AMM TASK 29-13-41-000-005) (Ref. AMM TASK 29-13-41-400-005).
Subtask 29-10-00-790-065-A
D. Test(s)
   (1) Put the related hydraulic system back to its initial configuration (Ref. AMM TASK 29-00-00-864-001).
   (2) Pressurize the reservoirs of the hydraulic systems.
(Ref. AMM TASK 29-14-00-614-002).
   (3) Make sure that fluid level in the reservoirs of the hydraulic systems is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
   (4) Make sure that there are no leaks form the connections of the Green, Blue and Yellow reservoirs drain valves (1).
5. Close-up
Subtask 29-10-00-860-131-A
A. Put the aircraft back to the serviceable condition.
   (1) Remove the containers.
Subtask 29-10-00-410-097-A
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the related service panel doors:
     (a) For the Yellow hydraulic drain valve: 196BB.
     (b) For the Green hydraulic drain valve: right MLG door (Ref. AMM TASK 32-12-00-410-001).
     (c) For the Blue hydraulic drain valve: 197EB.
   (3) Set the HYD COMPT WHEEL WELL LIGHT switch to the OFF position.
   (4) Close Electrical Service Panel door 191GB.
[Rev.10 from 2021] 2026.04.01 00:13:50 UTC