Reactivation of the Green Power Accumulator
TASK 29-10-00-440-004-A
Reactivation of the Green Power Accumulator
MMEL 29-10-04A
HYDRAULIC SYSTEM ACCUMULATOR
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Referenced Information
3. Job Set-up
Subtask 29-10-00-865-085-A
Subtask 29-10-00-020-057-B
Subtask 29-10-00-410-077-A
[Rev.10 from 2021]
2026.04.01 00:13:59 UTC
Reactivation of the Green Power Accumulator
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
FIN: 1070GM
1. Reason for the JobMMEL 29-10-04A
HYDRAULIC SYSTEM ACCUMULATOR
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 12-14-29-614-001-A | Fill the Hydraulic Power Accumulators with Nitrogen |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-870-003-A | Bleeding Procedure of the Green Hydraulic System Downstream of the Engine Pump |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-863-001-A | Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-11-42-000-001-A | Removal of the Green Power Accumulator |
| TASK 29-11-42-400-001-A | Installation of the Green Power Accumulator |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 29-10-00-865-085-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-10-00-860-102-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
B. Aircraft Maintenance Configuration
(2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
(4) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001)
(5) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001)
(6) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(7) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.
(8) Put a CONTAINER 5 L (1.32 USGAL) below the power accumulator to collect the unwanted hydraulic fluid.
(9) Make sure that the defective power accumulator is replaced (Ref. AMM TASK 29-11-42-000-001) and (Ref. AMM TASK 29-11-42-400-001).
4. ProcedureWARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel
- on the ground service panel of the Green hydraulic system.
(4) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001)
(5) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001)
(6) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(7) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.
(8) Put a CONTAINER 5 L (1.32 USGAL) below the power accumulator to collect the unwanted hydraulic fluid.
(9) Make sure that the defective power accumulator is replaced (Ref. AMM TASK 29-11-42-000-001) and (Ref. AMM TASK 29-11-42-400-001).
Subtask 29-10-00-020-057-B
A. Remove the Blanking Caps
(2) Remove the blanking cap from the union (3) of the HP-manifold (2).
Subtask 29-10-00-420-054-B ** ON A/C NOT FOR ALL CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
(1) If installed remove the blanking cap from the union (7) of the power accumulator (8). (2) Remove the blanking cap from the union (3) of the HP-manifold (2).
B. Installation of the Hydraulic Pipe
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the line end fittings (1) and (6) of the pipe (4).
(5) Fill the power accumulator (8) with the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
(6) Install the pipe (4) loosely on the union (7) of the power accumulator (8) and on the union (3) of the HP-manifold (2).
(7) Install the clamp (5), the bolt (13) and the nut (12) to attach the pipe (4) to the clamp block bracket (11).
(8) TORQUE the line end fittings (1) and (6) to between 10.7 and 9.7 m.daN (78.91 and 71.53 lbf.ft )
.
Subtask 29-10-00-420-054-C ** ON A/C NOT FOR ALL CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
CAUTION:
YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS LUBRICANT.
(1) Clean the component interfaces and the adjacent area.(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the line end fittings (1) and (6) of the pipe (4).
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(4) Apply the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the line end fittings (1) and (6). (5) Fill the power accumulator (8) with the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
(6) Install the pipe (4) loosely on the union (7) of the power accumulator (8) and on the union (3) of the HP-manifold (2).
(7) Install the clamp (5), the bolt (13) and the nut (12) to attach the pipe (4) to the clamp block bracket (11).
(8) TORQUE the line end fittings (1) and (6) to between 10.7 and 9.7 m.daN (78.91 and 71.53 lbf.ft )
. B. Installation of the Hydraulic Pipe
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the line end fittings (1) and (6) of the pipe (4).
(5) Fill the power accumulator (8) with the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
(7) Install the clamp (5), the bolt (13) and the nut (12) to attach the pipe (4) to the clamp block bracket (11).
(8) TORQUE the line end fittings (1) and (10) to between 10.7 and 9.7 m.daN (78.91 and 71.53 lbf.ft )
.
Subtask 29-10-00-865-086-A CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
CAUTION:
YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS LUBRICANT.
(1) Clean the component interfaces and the adjacent area.(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the line end fittings (1) and (6) of the pipe (4).
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(4) Apply the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the line end fittings (1) and (6). (5) Fill the power accumulator (8) with the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
NOTE: It is not permitted to use high-density fluid Skydrol 500B-4.
(6) Install the pipe (4) loosely on the union (7) of the power accumulator (8) and on the union (3) of the HP-manifold (2). (7) Install the clamp (5), the bolt (13) and the nut (12) to attach the pipe (4) to the clamp block bracket (11).
(8) TORQUE the line end fittings (1) and (10) to between 10.7 and 9.7 m.daN (78.91 and 71.53 lbf.ft )
. C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 29-10-00-790-054-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
D. Test of the Power Accumulator
(2) Remove the WARNING NOTICE(S) from the ground service panel of the Green hydraulic system and from the cockpit.
(3) Pressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(4) Make sure that the fluid level in the reservoir of the Green hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(5) Pressurize the Green hydraulic system
(Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
(6) After 5 minutes, examine the connections of the power accumulator (8), the pipe (4) and the HP-manifold (2). Make sure that there are no hydraulic fluid or nitrogen leaks.
(7) Depressurize the Green hydraulic system
(Ref. AMM TASK 29-00-00-864-001).
(8) Do the bleeding procedure of the Green hydraulic system downstream of the engine pump (Ref. AMM TASK 29-00-00-870-003).
5. Close-upWARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
(1) Fill the power accumulator (8) with nitrogen (Ref. AMM TASK 12-14-29-614-001). (2) Remove the WARNING NOTICE(S) from the ground service panel of the Green hydraulic system and from the cockpit.
(3) Pressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(4) Make sure that the fluid level in the reservoir of the Green hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(5) Pressurize the Green hydraulic system
(Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
(6) After 5 minutes, examine the connections of the power accumulator (8), the pipe (4) and the HP-manifold (2). Make sure that there are no hydraulic fluid or nitrogen leaks.
(7) Depressurize the Green hydraulic system
(Ref. AMM TASK 29-00-00-864-001).
(8) Do the bleeding procedure of the Green hydraulic system downstream of the engine pump (Ref. AMM TASK 29-00-00-870-003).
NOTE: When you do the bleeding procedure, nitrogen, which has gone into the hydraulic system from the defective accumulator, is removed.
Subtask 29-10-00-410-077-A
A. Put the aircraft back to the serviceable condition.
(1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(2) Remove the CONTAINER 5 L (1.32 USGAL) from below the power accumulator.
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Remove the access platform(s).
(5) Close the left main-gear door (Ref. AMM TASK 32-12-00-410-001).
(6) Remove the entry from the log book.
(1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(2) Remove the CONTAINER 5 L (1.32 USGAL) from below the power accumulator.
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Remove the access platform(s).
(5) Close the left main-gear door (Ref. AMM TASK 32-12-00-410-001).
(6) Remove the entry from the log book.
Green Power Accumulator (1070GM)