General Visual Inspection of Bracket PN D9357060320000 for Damage
TASK 29-10-00-210-803-A
General Visual Inspection of Bracket PN D9357060320000 for Damage
Refer to the MPD TASK: 291300-01
GENERAL VISUAL INSPECTION OF BRACKET PN D9357060320000 FOR DAMAGE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 29-10-00-860-122-A
Subtask 29-10-00-210-071-A
Subtask 29-10-00-860-123-A
[Rev.10 from 2021]
2026.04.01 00:14:23 UTC
General Visual Inspection of Bracket PN D9357060320000 for Damage
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING:
DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
- FLUSH IT AWAY WITH CLEAN WATER
- GET MEDICAL AID.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 196
1. Reason for the JobRefer to the MPD TASK: 291300-01
GENERAL VISUAL INSPECTION OF BRACKET PN D9357060320000 FOR DAMAGE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | CONTAINER - HYDRAULIC FLUID RESISTANT |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 196 | HYDRAULIC COMPT AND FAIRINGS |
| 196BB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-34-24-869-002-A | Aircraft Grounding (Earthing) for the Maintenance Operations |
| TASK 12-34-24-869-002-A-01 | Aircraft Grounding (Earthing) during Transit, Turnaround or Overnight Stop |
| TASK 20-23-11-200-001-A | Permitted Damage and Defects on Hydraulic Tubing |
| TASK 20-23-11-200-003-A | Permitted Damage and Defects on Flexible Hydraulic Hoses |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-13-00-710-002-A | Operational Test of the Yellow Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-24-00-710-001-A | Operational Test of the Yellow Auxiliary Power |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 29-10-00-860-122-A
A. Aircraft Maintenance Configuration
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Make sure the aircraft is electrically grounded (Ref. AMM TASK 12-34-24-869-002).
(3) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
(Ref. AMM TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Yellow hydraulic system.
(Ref. AMM TASK 29-14-00-614-001).
(6) Make sure that the aircraft electrical circuits are de-energized
(Ref. AMM TASK 24-41-00-862-002).
(7) Open the access door 196BB.
(8) Put the CONTAINER - HYDRAULIC FLUID RESISTANT below the HP manifold of the Yellow hydraulic system.
(9) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
Subtask 29-10-00-865-109-A (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Make sure the aircraft is electrically grounded (Ref. AMM TASK 12-34-24-869-002).
(3) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panel of the Yellow hydraulic system.
(Ref. AMM TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Yellow hydraulic system.
(Ref. AMM TASK 29-14-00-614-001).
(6) Make sure that the aircraft electrical circuits are de-energized
(Ref. AMM TASK 24-41-00-862-002).
(7) Open the access door 196BB.
(8) Put the CONTAINER - HYDRAULIC FLUID RESISTANT below the HP manifold of the Yellow hydraulic system.
(9) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-10-00-110-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
C. Preparation of the Inspection Area
(1) Make sure that the inspection areas are sufficiently clean to do a satisfactory inspection.
(3) Make sure that the inspection area is dry before you continue.
4. Procedure(1) Make sure that the inspection areas are sufficiently clean to do a satisfactory inspection.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(2) If not, clean the inspection area with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) . (3) Make sure that the inspection area is dry before you continue.
Subtask 29-10-00-210-071-A
A. General Visual Inspection Procedure
(1) Do the general visual inspection of the bracket (4) for damage:
(a) If you do not find damage, continue with paragraph 4.C.
(b) If you find damage, replace the bracket (4).
1 If you find damage, replace the pipe assembly (1).
(d) Do the general visual inspection for signs of chafing on the hose (2) (Ref. AMM TASK 20-23-11-200-003).
1 If you find damage, replace the hose (2).
(e) Do the general visual inspection for signs of chafing on the pipe assembly (3) (Ref. AMM TASK 20-23-11-200-001).
1 If you find damage, replace the pipe assembly (3).
(f) Do the test of the Yellow hydraulic system, refer to paragraph 4.B.
Subtask 29-10-00-790-064-A (1) Do the general visual inspection of the bracket (4) for damage:
(a) If you do not find damage, continue with paragraph 4.C.
(b) If you find damage, replace the bracket (4).
NOTE: It is recommended to do the inspections of the hydraulic pipes and hoses before you replace the damaged bracket.
(c) Do the general visual inspection for signs of chafing on the pipe assembly (1) (Ref. AMM TASK 20-23-11-200-001). 1 If you find damage, replace the pipe assembly (1).
(d) Do the general visual inspection for signs of chafing on the hose (2) (Ref. AMM TASK 20-23-11-200-003).
1 If you find damage, replace the hose (2).
(e) Do the general visual inspection for signs of chafing on the pipe assembly (3) (Ref. AMM TASK 20-23-11-200-001).
1 If you find damage, replace the pipe assembly (3).
(f) Do the test of the Yellow hydraulic system, refer to paragraph 4.B.
B. Test of the Yellow hydraulic system
Subtask 29-10-00-865-110-A NOTE: If there were no damage and the pipe assembly (1), the bracket (4), the hose (2) and/or the pipe assembly (3), were not replaced then the test of the Yellow hydraulic system is not necessary.
(1) Do the operational test of the Yellow hydraulic system (Ref. AMM TASK 29-13-00-710-002). NOTE: It is necessary to check all connections of the replaced parts. Leaks are not permitted.
(2) Do the operational test of the Yellow auxiliary power (Ref. AMM TASK 29-24-00-710-001). C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
Subtask 29-10-00-860-123-A
A. Put the aircraft back to the serviceable condition.
(1) Connect the isolation coupling of the PTU (Ref. AMM TASK 29-23-00-860-002).
(2) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(4) Remove the CONTAINER - HYDRAULIC FLUID RESISTANT.
(5) Make sure that the work area is clean and clear of tools and other items.
(6) Close the access door 196BB.
(7) Remove the WARNING NOTICE(S).
(1) Connect the isolation coupling of the PTU (Ref. AMM TASK 29-23-00-860-002).
(2) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(4) Remove the CONTAINER - HYDRAULIC FLUID RESISTANT.
(5) Make sure that the work area is clean and clear of tools and other items.
(6) Close the access door 196BB.
(7) Remove the WARNING NOTICE(S).
Inspection Area of the Bracket, the Pipes and the Hose