2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 29-10-00-860-129-A
Subtask 29-10-00-040-054-A
Subtask 29-10-00-860-132-A
[Rev.10 from 2021]
2026.04.01 00:13:49 UTC
Deactivation of the Drain Valves of the Green, Yellow and Blue Hydraulic Reservoirs
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
MMEL 29-10-10A
HYDRAULIC RESERVOIR DRAIN VALVE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CONTAINER - HYDRAULIC FLUID RESISTANT |
| No specific | 1 | WRENCH - SPANNER, FLAT |
| No specific | Torque wrench: range to between 11 and 9 m.N (97.35 and 79.65 lbf.in ) ![]() |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 147 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| 190 | BELLY FAIR, AIR CONDITIONING & HYD COMPT |
| 196 | HYDRAULIC COMPT AND FAIRINGS |
| 191GB, 196BB, 197EB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | CAP | AIPC 29-11-03-04-240 |
| 2 | CAP | AIPC 29-11-83-01-180 |
| 2 | CAP | AIPC 29-12-04-11-270 |
| 2 | CAP | AIPC 29-12-84-08-430 |
| 2 | CAP | AIPC 29-13-03-04-250 |
| 2 | CAP | AIPC 29-13-83-01-230 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 12-12-29-611-002-A | Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 29-10-00-860-129-A
A. Aircraft Maintenance Configuration
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration
(Ref. AMM TASK 29-00-00-864-001).
(3) Put the CONTAINER - HYDRAULIC FLUID RESISTANT below the related drain valve.
Subtask 29-10-00-010-098-A (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration
(Ref. AMM TASK 29-00-00-864-001).
(3) Put the CONTAINER - HYDRAULIC FLUID RESISTANT below the related drain valve.
B. Get Access
(1) Open the related service panel doors:
(a) For the Yellow hydraulic drain valve: 196BB.
(b) For the Green hydraulic drain valve: right MLG door (Ref. AMM TASK 32-12-00-010-001).
(c) For the Blue hydraulic drain valve: 197EB.
(2) Open Electrical Service Panel door 191GB and set the HYD COMPT WHEEL WELL LIGHT to the ON position.
4. Procedure(1) Open the related service panel doors:
(a) For the Yellow hydraulic drain valve: 196BB.
(b) For the Green hydraulic drain valve: right MLG door (Ref. AMM TASK 32-12-00-010-001).
(c) For the Blue hydraulic drain valve: 197EB.
(2) Open Electrical Service Panel door 191GB and set the HYD COMPT WHEEL WELL LIGHT to the ON position.
Subtask 29-10-00-040-054-A
A. Deactivation of the Drain Valve of the Green Hydraulic Reservoir
(1) Install the AIPC 29-11-03-04-240 CAP (2) or AIPC 29-11-83-01-180 CAP (2) on the drain valve (1).
(2) With the WRENCH - SPANNER, FLAT, hold the drain valve (1) in position.
(3) TORQUE the cap (2) to between 11 and 9 m.N (97.35 and 79.65 lbf.in )
.
Subtask 29-10-00-040-055-A (1) Install the AIPC 29-11-03-04-240 CAP (2) or AIPC 29-11-83-01-180 CAP (2) on the drain valve (1).
(2) With the WRENCH - SPANNER, FLAT, hold the drain valve (1) in position.
(3) TORQUE the cap (2) to between 11 and 9 m.N (97.35 and 79.65 lbf.in )
.B. Deactivation of the Drain Valve of the Blue Hydraulic Reservoir
(1) Install the AIPC 29-12-04-11-270 CAP (2) or AIPC 29-12-84-08-430 CAP (2) on the drain valve (1).
(2) With the WRENCH - SPANNER, FLAT, hold the drain valve (1) in position.
(3) TORQUE the cap (2) to between 11 and 9 m.N (97.35 and 79.65 lbf.in )
.
Subtask 29-10-00-040-056-A (1) Install the AIPC 29-12-04-11-270 CAP (2) or AIPC 29-12-84-08-430 CAP (2) on the drain valve (1).
(2) With the WRENCH - SPANNER, FLAT, hold the drain valve (1) in position.
(3) TORQUE the cap (2) to between 11 and 9 m.N (97.35 and 79.65 lbf.in )
.C. Deactivation of the Drain Valve of the Yellow Hydraulic Reservoir
(1) Install the AIPC 29-13-03-04-250 CAP (2) or AIPC 29-13-83-01-230 CAP (2) on the drain valve (1).
(2) With the WRENCH - SPANNER, FLAT, hold the drain valve (1) in position.
(3) TORQUE the cap (2) to between 11 and 9 m.N (97.35 and 79.65 lbf.in )
.
5. Close-up(1) Install the AIPC 29-13-03-04-250 CAP (2) or AIPC 29-13-83-01-230 CAP (2) on the drain valve (1).
(2) With the WRENCH - SPANNER, FLAT, hold the drain valve (1) in position.
(3) TORQUE the cap (2) to between 11 and 9 m.N (97.35 and 79.65 lbf.in )
.Subtask 29-10-00-860-132-A
A. Aircraft Maintenance Configuration
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove all the fixtures, tools, test and support equipment used during this procedure.
(3) Make an entry in the logbook.
(4) Put the related hydraulic system back to its initial configuration (Ref. AMM TASK 29-00-00-864-001).
(5) Make sure that fluid level in the reservoirs of the hydraulic systems is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
(6) Close the related service panel doors:
(a) For the Yellow hydraulic drain valve: 196BB.
(b) For the Green hydraulic drain valve: right MLG door (Ref. AMM TASK 32-12-00-410-001).
(c) For the Blue hydraulic drain valve: 197EB.
(7) Set the HYD COMPT WHEEL WELL LIGHT switch to the OFF position.
(8) Close Electrical Service Panel door 191GB.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove all the fixtures, tools, test and support equipment used during this procedure.
(3) Make an entry in the logbook.
(4) Put the related hydraulic system back to its initial configuration (Ref. AMM TASK 29-00-00-864-001).
(5) Make sure that fluid level in the reservoirs of the hydraulic systems is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
(6) Close the related service panel doors:
(a) For the Yellow hydraulic drain valve: 196BB.
(b) For the Green hydraulic drain valve: right MLG door (Ref. AMM TASK 32-12-00-410-001).
(c) For the Blue hydraulic drain valve: 197EB.
(7) Set the HYD COMPT WHEEL WELL LIGHT switch to the OFF position.
(8) Close Electrical Service Panel door 191GB.