Deactivation of the Yellow Power Accumulator
TASK 29-10-00-040-006-A
Deactivation of the Yellow Power Accumulator
MMEL 29-10-04A
HYDRAULIC SYSTEM ACCUMULATOR
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 29-10-00-865-091-A
Subtask 29-10-00-614-054-A
Subtask 29-10-00-410-080-A
[Rev.10 from 2021]
2026.04.01 00:14:04 UTC
Deactivation of the Yellow Power Accumulator
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobMMEL 29-10-04A
HYDRAULIC SYSTEM ACCUMULATOR
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 196BB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-870-007-A | Bleeding Procedure of the Yellow Hydraulic System Downstream of the Engine Pump |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-863-002-A | Pressurize the Yellow Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-864-002-A | Depressurize the Yellow Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
Subtask 29-10-00-865-091-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-10-00-860-105-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | B HYD/ELEC PUMP | 2701GJ | AB09 |
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
B. Aircraft Maintenance Configuration
(2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
(Ref. AMM TASK 29-00-00-864-001).
(4) Depressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(5) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(6) Put a CONTAINER 5 L (1.32 USGAL) below the accumulator to collect the unwanted hydraulic fluid.
Subtask 29-10-00-010-080-A 4. ProcedureWARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Yellow hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Yellow hydraulic system.
(Ref. AMM TASK 29-00-00-864-001).
(4) Depressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(5) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(6) Put a CONTAINER 5 L (1.32 USGAL) below the accumulator to collect the unwanted hydraulic fluid.
Subtask 29-10-00-614-054-A
A. Release the nitrogen pressure from the power accumulator (3) as follows:
(1) Remove the end cap (5) from the charging valve.
(2) Turn the nut (4) to release the nitrogen pressure.
(3) When the nitrogen pressure is fully released turn the nut (4) to close the charging valve.
(4) Install the end cap (5) on the charging valve.
Subtask 29-10-00-020-060-A (1) Remove the end cap (5) from the charging valve.
(2) Turn the nut (4) to release the nitrogen pressure.
(3) When the nitrogen pressure is fully released turn the nut (4) to close the charging valve.
(4) Install the end cap (5) on the charging valve.
B. Removal of the Hydraulic Pipe
(2) Disconnect the line end fitting (1) from the union (2) of the power accumulator (3).
(3) Remove the nuts (10), the bolts (7) and the pipe (6) with the clamp-block halves (8) and (9).
(4) Install the blanking caps on the line end fittings (1) and (12) of the removed pipe (6).
Subtask 29-10-00-420-057-A CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
(1) Disconnect the line end fitting (12) from the union (13) of the HP-manifold (14). (2) Disconnect the line end fitting (1) from the union (2) of the power accumulator (3).
(3) Remove the nuts (10), the bolts (7) and the pipe (6) with the clamp-block halves (8) and (9).
(4) Install the blanking caps on the line end fittings (1) and (12) of the removed pipe (6).
C. Installation of the Blanking Caps
(2) Install the CAP - BLANKING (ABS0946V12 TYPE)CAP - BLANKING (MS21914-12 TYPE) on the unions (2) and (13).
(3) TORQUE the blanking caps to between 9.5 and 8.5 m.daN (70.06 and 62.68 lbf.ft )
.
Subtask 29-10-00-865-092-A CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
(1) Apply the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the unions (2) and (13). (2) Install the CAP - BLANKING (ABS0946V12 TYPE)CAP - BLANKING (MS21914-12 TYPE) on the unions (2) and (13).
(3) TORQUE the blanking caps to between 9.5 and 8.5 m.daN (70.06 and 62.68 lbf.ft )
. D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 29-10-00-790-057-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | B HYD/ELEC PUMP | 2701GJ | AB09 |
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
E. Leak Test
(2) Pressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-863-002).
(3) After 5 minutes, examine the connections of the blanking cap to the union (13) of the HP-manifold (14). Make sure that there are no hydraulic fluid or nitrogen leaks.
(4) Depressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-864-002).
(5) Do the bleeding procedure of the Yellow hydraulic system downstream of the engine pump (Ref. AMM TASK 29-00-00-870-007).
5. Close-upWARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
(1) Pressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-002). (2) Pressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-863-002).
(3) After 5 minutes, examine the connections of the blanking cap to the union (13) of the HP-manifold (14). Make sure that there are no hydraulic fluid or nitrogen leaks.
(4) Depressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-864-002).
(5) Do the bleeding procedure of the Yellow hydraulic system downstream of the engine pump (Ref. AMM TASK 29-00-00-870-007).
NOTE: When you do the bleeding procedure, nitrogen, which has gone into the hydraulic system from the defective accumulator, is removed.
Subtask 29-10-00-410-080-A
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the fluid level in the reservoir of the Yellow hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(2) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(3) Remove the CONTAINER 5 L (1.32 USGAL) from below the power accumulator.
(4) Make sure that the work area is clean and clear of tools and other items.
(5) Close the access door 196BB.
(6) Remove the WARNING NOTICE(S).
(7) Make an entry in the logbook.
(1) Make sure that the fluid level in the reservoir of the Yellow hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(2) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(3) Remove the CONTAINER 5 L (1.32 USGAL) from below the power accumulator.
(4) Make sure that the work area is clean and clear of tools and other items.
(5) Close the access door 196BB.
(6) Remove the WARNING NOTICE(S).
(7) Make an entry in the logbook.
Yellow Power Accumulator (3070GM)