W DOC AIRBUS | AMM A320F

Installation of the Magnetic Level-Indicator Rod


TASK 28-43-22-400-003-A
Installation of the Magnetic Level-Indicator Rod


WARNING: MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 206QM ** ON A/C NOT FOR ALL
FIN: 207QM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)
No specific
AR
SAFETY BARRIER(S)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 28-00-00-910-001-A
Fuel Safety Procedures
3. Job Set-up
Subtask 28-43-22-941-056-A ** ON A/C NOT FOR ALL
A. Safety Precautions
WARNING: OBEY THE FUEL SAFETY PROCEDURES.
   (1) You must obey the fuel safety procedures when you do work on the fuel system (Ref. AMM TASK 28-00-00-910-001).
   (2) Make sure that the SAFETY BARRIER(S) are in position.
Subtask 28-43-22-860-052-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Make sure that the ACCESS PLATFORM 3M (10 FT) is below the applicable Magnetic-Level-Indicator (MLI) rod (2).
4. Procedure
Subtask 28-43-22-420-054-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Clean the component interface and the adjacent areas with Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 28-43-22-420-053-A ** ON A/C NOT FOR ALL
B. Installation of the Magnetic-Level-Indicator Rod 206QM (207QM)
   (1) Install the Magnetic-Level-Indicator (MLI) rod (2) in the MLI housing.
   (2) Push the MLI rod (2) fully in, turn through 90 deg. and lock in position.
Subtask 28-43-22-710-051-A ** ON A/C NOT FOR ALL
CAUTION: DO NOT LET THE MLI's FALL FREELY.
C. Operational Test
F Magnetic-Level-Indicator Rod ** ON A/C NOT FOR ALL
   (1) Release the MLI rod (2) and make sure it extends fully and smoothly.
   (2) Push the MLI rod (2) fully in, turn through 90 deg. and lock in position.
5. Close-up
Subtask 28-43-22-942-052-A ** ON A/C NOT FOR ALL
A. Removal of Equipment
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the safety barriers.
   (3) Remove the access platform(s).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.02 06:18:13 UTC