Installation of the Center Tank Harness
TASK 28-42-44-400-002-A
Installation of the Center Tank Harness
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Referenced Information
3. Job Set-up
Subtask 28-42-44-941-053-A
Subtask 28-42-44-942-054-A
[Rev.10 from 2021]
2026.04.02 06:18:11 UTC
Installation of the Center Tank Harness
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 18QT
1. Reason for the JobSelf Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.06ABA1) | Polysulfide Sealant-Fuel Tank Brushable - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 28-10-00-910-001-A | Safety Procedures When You Do Work in a Fuel Tank |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 28-25-00-650-001-A | Pressure Defuel |
| TASK 28-42-00-740-001-A | Status Report (BITE) |
| TASK 28-42-15-000-002-A | Removal of the Center Tank Fuel-Quantity-Probe |
| TASK 28-42-15-400-004-A | Installation of the Center (Transfer) Tank Fuel-Quantity Probe |
| TASK 28-42-47-400-001-A | Installation of the Ultracomp |
| TASK 28-46-00-740-001-A | Functional (BITE) Test |
| TASK 28-46-15-400-012-A | Installation of the Center-Tank Fuel-Level Sensors |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 57-17-11-000-001-A | Removal of Access Cover 147AZ(148AZ) |
| TASK 57-17-11-000-001-B | Removal of Access Cover 148AZ or/and the ACT-Equipment Support Door |
| TASK 57-17-11-400-001-A | Installation of Access Cover 147AZ(148AZ) |
| TASK 57-17-11-400-001-B | Installation of Access Cover 148AZ or/and the ACT-Equipment Support-Door |
Subtask 28-42-44-941-053-A
A. Safety Precautions
(2) Make sure that the SAFETY BARRIER(S) are in position.
Subtask 28-42-44-860-051-A WARNING:
BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
(1) You must obey the fuel safety procedures (Ref. AMM TASK 28-10-00-910-001) when you do work in a fuel tank. (2) Make sure that the SAFETY BARRIER(S) are in position.
B. Aircraft Maintenance Configuration
(1) Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
(3) Make sure that the ACCESS PLATFORM 4M (13 FT) is below the applicable cover 147AZ (148AZ).
(4) Make sure that the applicable access cover 147AZ (148AZ) has been removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-17-11-000-001).
4. Procedure(1) Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
- 1QL, 2QL, 3QL, 1QT, 2QT and 8QT.
(3) Make sure that the ACCESS PLATFORM 4M (13 FT) is below the applicable cover 147AZ (148AZ).
(4) Make sure that the applicable access cover 147AZ (148AZ) has been removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-17-11-000-001).
WARNING:
MAKE SURE THAT ALL CABLES IN FUEL TANKS ARE CORRECTLY SUPPORTED (BY CLIPS AND OTHER SUPPORTS).
IF CLIPS OR SUPPORTS ARE MISSING OR DAMAGED, YOU MUST REPLACE THEM.
WARNING:
DO NOT REPAIR CABLES THAT ARE IN FUEL TANKS. DO NOT MAKE IN-LINE SPLICES. IF A CABLE IS DEFECTIVE, YOU MUST REPLACE THE FULL CABLE ASSEMBLY.
WARNING:
MAKE SURE THAT THE INSTALLATION AND ROUTING OF ALL ELECTRICAL CABLES AGREE WITH THE REQUIREMENTS OF THE ELECTRICAL STANDARD PRACTICES MANUAL.
Subtask 28-42-44-420-054-A A. Preparation for Installation
(2) Use a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) to clean:
(4) Make sure the parts retained from the removed component are clean and in the correct condition.
Subtask 28-42-44-420-051-C ** ON A/C NOT FOR ALL WARNING:
WHEN YOU USE COMPRESSED AIR:
- USE THE CORRECT PROTECTION (FACE SHIELD OR GOGGLES)
- DO NOT POINT THE AIRFLOW AT YOURSELF OR OTHER PERSONS.
WARNING:
DO NOT LET COMPRESSED GAS TOUCH YOUR SKIN. THE GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS CONDITION CAN KILL YOU.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(1) Use a SPATULA - PLASTIC to remove the sealant at the interface of the electrical backshell (21) and the tank wall. (2) Use a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) to clean:
- the electrical backshell (21)
- the interface of the electrical backshell (21) and the tank wall.
(4) Make sure the parts retained from the removed component are clean and in the correct condition.
B. Installation of the Harness
(3) Remove and discard the adhesive tape and the string from the harness (23).
(4) Put the harness (23) in position.
(5) If necessary remove the items that follow:
(7) If necessary put the loop-clamps (4), (5), (7), (8) and (9) with the harness (22) in position.
(8) Install the screws (1), (2) and (10) the washers (3) and the nuts (11) and tighten.
(9) Make sure that the electrical connectors are clean and in the correct condition.
(10) Connect the center tank harness 18QT:
(a) Identify the cable ends for the probes that follow and connect them to the correct terminals (Ref. AMM TASK 28-42-15-400-004):
(11) Install the O-ring (17) on the electrical backshell (21).
(12) Install the electrical backshell (21) in the applicable position.
(13) Install the washer (18) and the nut (19).
(14) TORQUE the nut (19) to between 1.07 and 0.96 m.daN (94.69 and 84.96 lbf.in )
.
(15) Safety the nut (19) to the nut on the adjacent electrical backshell with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(16) Apply Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) around the electrical backshell (21) to seal it to the tank wall.
(17) Connect the electrical connector (20) to the electrical backshell (21).
(18) Do a bonding check between the electrical connector (20) and FR42 (Ref. AMM TASK 20-28-00-912-802). The bonding resistance must be less than 10 milliohms.
Subtask 28-42-44-420-051-D ** ON A/C NOT FOR ALL WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(1) Use TAPE - ADHESIVE to secure the electrical connectors of the new harness (23) together. Attach the string to the end of the harness. NOTE: This will help you to move the center tank harness through its conduit.
(2) Use the string to pull the center tank harness (23) through its conduit (15). When you install the center tank harness make sure it does not catch. (3) Remove and discard the adhesive tape and the string from the harness (23).
(4) Put the harness (23) in position.
(5) If necessary remove the items that follow:
- the screws (1), (2) and (10)
- the washers (3)
- the nut (11)
- the loop-clamps (4), (5), (6), (7), (8), (9) and (14).
(7) If necessary put the loop-clamps (4), (5), (7), (8) and (9) with the harness (22) in position.
(8) Install the screws (1), (2) and (10) the washers (3) and the nuts (11) and tighten.
(9) Make sure that the electrical connectors are clean and in the correct condition.
(10) Connect the center tank harness 18QT:
(a) Identify the cable ends for the probes that follow and connect them to the correct terminals (Ref. AMM TASK 28-42-15-400-004):
- 35QT, and 39QT.
- 22QJ.
(11) Install the O-ring (17) on the electrical backshell (21).
(12) Install the electrical backshell (21) in the applicable position.
(13) Install the washer (18) and the nut (19).
(14) TORQUE the nut (19) to between 1.07 and 0.96 m.daN (94.69 and 84.96 lbf.in )
. (15) Safety the nut (19) to the nut on the adjacent electrical backshell with
(16) Apply Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) around the electrical backshell (21) to seal it to the tank wall.
(17) Connect the electrical connector (20) to the electrical backshell (21).
(18) Do a bonding check between the electrical connector (20) and FR42 (Ref. AMM TASK 20-28-00-912-802). The bonding resistance must be less than 10 milliohms.
B. Installation of the Harness
(3) Remove and discard the adhesive tape and the string from the harness (23).
(4) Put the harness (23) in position.
(5) If necessary remove the items that follow:
(7) If necessary put the loop-clamps (4), (5), (7), (8) and (9) with the harness (22) in position.
(8) Install the screws (1), (2) and (10) the washers (3) and the nuts (11) and tighten.
(9) Make sure that the electrical connectors are clean and in the correct condition.
(10) Connect the center tank harness 18QT:
(a) Identify the cable ends for the probes 35QT and 39QT and connect them to the correct terminals (Ref. AMM TASK 28-42-15-000-002).
(b) Identify the cable ends for the sensor 22QJ and connect them to the correct terminals (Ref. AMM TASK 28-46-15-400-012).
(11) Install the O-ring (17) on the electrical backshell (21).
(12) Install the electrical backshell (21) in the applicable position.
(13) Install the washer (18) and the nut (19).
(14) TORQUE the nut (19) to between 1.07 and 0.96 m.daN (94.69 and 84.96 lbf.in )
.
(15) Safety the nut (19) to the nut on the adjacent electrical backshell with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(16) Apply Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) around the electrical backshell (21) to seal it to the tank wall.
(17) Connect the fused adapter (24) to the electrical backshell (21).
(18) Connect the electrical connector (20) to the fused adapter (24).
(19) Do a bonding check between the electrical connector (20) and FR42 (Ref. AMM TASK 20-28-00-912-802). The bonding resistance must be less than 10 milliohms.
Subtask 28-42-44-865-053-A WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(1) Use TAPE - ADHESIVE to secure the electrical connectors of the new harness (23) together. Attach the string to the end of the harness. NOTE: This will help you to move the center tank harness through its conduit.
(2) Use the string to pull the center tank harness (23) through its conduit (15). When you install the center tank harness make sure it does not catch. (3) Remove and discard the adhesive tape and the string from the harness (23).
(4) Put the harness (23) in position.
(5) If necessary remove the items that follow:
- the screws (1), (2) and (10)
- the washers (3)
- the nut (11)
- the loop-clamps (4), (5), (6), (7), (8), (9) and (14).
(7) If necessary put the loop-clamps (4), (5), (7), (8) and (9) with the harness (22) in position.
(8) Install the screws (1), (2) and (10) the washers (3) and the nuts (11) and tighten.
(9) Make sure that the electrical connectors are clean and in the correct condition.
(10) Connect the center tank harness 18QT:
(a) Identify the cable ends for the probes 35QT and 39QT and connect them to the correct terminals (Ref. AMM TASK 28-42-15-000-002).
(b) Identify the cable ends for the sensor 22QJ and connect them to the correct terminals (Ref. AMM TASK 28-46-15-400-012).
(11) Install the O-ring (17) on the electrical backshell (21).
(12) Install the electrical backshell (21) in the applicable position.
(13) Install the washer (18) and the nut (19).
(14) TORQUE the nut (19) to between 1.07 and 0.96 m.daN (94.69 and 84.96 lbf.in )
. (15) Safety the nut (19) to the nut on the adjacent electrical backshell with
(16) Apply Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) around the electrical backshell (21) to seal it to the tank wall.
(17) Connect the fused adapter (24) to the electrical backshell (21).
(18) Connect the electrical connector (20) to the fused adapter (24).
(19) Do a bonding check between the electrical connector (20) and FR42 (Ref. AMM TASK 20-28-00-912-802). The bonding resistance must be less than 10 milliohms.
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 28-42-44-410-053-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | FUEL/FQI/CHAN/1 | 1QT | A13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/FQI/CHANNEL/1 AND 2 | 8QT | L26 |
| ** ON A/C ALL | |||
| 121VU | FUEL/FQI/CHAN/2 | 2QT | M27 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/CTR TK/AUTO/CTL | 3QL | R27 |
| 121VU | FUEL/CTR TK/L&R XFR/CTL & IND | 2QL | R26 |
| 121VU | FUEL/CTR TK/L&R XFR/CTL & IND | 1QL | R25 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/FQI/CHANNEL/1 AND 2 | 8QT | L25 |
D. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable cover(s) 147AZ (148AZ) (Ref. AMM TASK 57-17-11-400-001).
(3) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
Subtask 28-42-44-740-053-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable cover(s) 147AZ (148AZ) (Ref. AMM TASK 57-17-11-400-001).
(3) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
E. Test
(1) Do a status report (BITE) of the fuel-quantity indicating system (Ref. AMM TASK 28-42-00-740-001).
(2) Do a functional (BITE) test of the fuel-tank level-sensing system (Ref. AMM TASK 28-46-00-740-001).
5. Close-up(1) Do a status report (BITE) of the fuel-quantity indicating system (Ref. AMM TASK 28-42-00-740-001).
(2) Do a functional (BITE) test of the fuel-tank level-sensing system (Ref. AMM TASK 28-46-00-740-001).
Subtask 28-42-44-942-054-A
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Center Tank Harness 18QT - Location and Detail