Installation of the Wing Tank Harness
TASK 28-42-43-400-005-A
Installation of the Wing Tank Harness
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 28-42-43-941-063-A ** ON A/C NOT FOR ALL
Subtask 28-42-43-942-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:18:10 UTC
Installation of the Wing Tank Harness
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
ZONE: 540
ZONE: 640
FIN: 57QT ** ON A/C NOT FOR ALL
FIN: 58QT ** ON A/C NOT FOR ALL
FIN: 63QT ** ON A/C NOT FOR ALL
FIN: 64QT ** ON A/C NOT FOR ALL
1. Reason for the JobZONE: 640
FIN: 57QT ** ON A/C NOT FOR ALL
FIN: 58QT ** ON A/C NOT FOR ALL
FIN: 63QT ** ON A/C NOT FOR ALL
FIN: 64QT ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05BAA1) | Threadlocking Adhesive-- Low strength - |
| (Material No.06ABA1) | Polysulfide Sealant-Fuel Tank Brushable - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.12ACB1) | Corrosion Preventive Compound-Heavy Duty Hard Film - |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 540 | FUEL TANK |
| 640 | FUEL TANK |
| 540BB, 574BB, 640BB, 674BB | |
| FOR [57QT] (HARNESS-LEFT WING TANK A) | |
| 540AB, 540AZ, 540BB, 540BZ, 540DB, 540HB, 540NB | |
| FOR [58QT] (HARNESS-RIGHT WING, TANK A) | |
| 640AB, 640AZ, 640BB, 640BZ, 640DB, 640HB, 640NB | |
| FOR [63QT] (HARNESS-LEFT WING TANK B) | |
| 540AB, 540BB, 540BZ, 540EB, 540FB, 540LB, 540MB, 540PB, 540QB | |
| FOR [64QT] (HARNESS-RIGHT WING TANK B) | |
| 640AB, 640BB, 640BZ, 640EB, 640FB, 640LB, 640MB, 640PB, 640QB | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 1 | CABLE-TIES | AIPC 28-42-05-55-010 |
| 1 | CABLE-TIES | AIPC 28-42-05-56-010 |
| 4 | O-RING | AIPC 28-42-43-02-025 |
| 8 | O-RING | AIPC 28-42-43-02-025 |
| 1 | CABLE-TIES | AIPC 28-42-85-55-010 |
| 1 | CABLE-TIES | AIPC 28-42-85-56-010 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 28-10-00-910-001-A | Safety Procedures When You Do Work in a Fuel Tank |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 28-25-00-650-001-A | Pressure Defuel |
| TASK 28-42-00-740-001-A | Status Report (BITE) |
| TASK 28-42-15-400-005-A | Installation of the Wing-Tank Fuel-Quantity Probes |
| TASK 28-42-46-400-001-A | Installation of the Dualcomp |
| TASK 28-42-48-400-001-A | Installation of the Ultracomp |
| TASK 28-46-00-740-001-A | Functional (BITE) Test |
| TASK 28-46-15-400-009-A | Installation of the Wing-Tank Fuel-Level Sensors |
| TASK 28-46-17-400-001-A | Installation of the Temperature Sensor |
| TASK 28-46-19-400-001-A | Installation of the IDG Shut-off Sensor. |
| TASK 57-27-11-000-001-A | Removal of the Access Panel |
| TASK 57-27-11-000-002-A | Removal of the Access Panel |
| TASK 57-27-11-400-001-A | Installation of the Access Panel |
| TASK 57-27-11-400-002-A | Installation of the Access Panel |
| TASK 57-51-37-000-009-A | Removal of the Access Door |
| TASK 57-51-37-400-009-A | Installation of the Access Door |
| ESPM 2048140 | |
| ESPM 2048190 | |
| FOR [57QT] (HARNESS-LEFT WING TANK A) | |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 57-27-11-000-001-A | Removal of the Access Panel |
| TASK 57-27-11-000-002-A | Removal of the Access Panel |
| TASK 57-27-11-400-001-A | Installation of the Access Panel |
| TASK 57-27-11-400-002-A | Installation of the Access Panel |
| TASK 57-27-12-000-002-A | Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ) |
| TASK 57-27-12-400-002-A | Installation of the Rib 2 Access Panel 540AZ (640AZ) or 540BZ (640BZ) |
| FOR [57QT] (HARNESS-LEFT WING TANK A) | |
| FOR [63QT] (HARNESS-LEFT WING TANK B) | |
| TASK 28-42-48-400-001-A | Installation of the Ultracomp |
| FOR [58QT] (HARNESS-RIGHT WING, TANK A) | |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 57-27-11-000-001-A | Removal of the Access Panel |
| TASK 57-27-11-000-002-A | Removal of the Access Panel |
| TASK 57-27-11-400-001-A | Installation of the Access Panel |
| TASK 57-27-11-400-002-A | Installation of the Access Panel |
| TASK 57-27-12-000-002-A | Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ) |
| TASK 57-27-12-400-002-A | Installation of the Rib 2 Access Panel 540AZ (640AZ) or 540BZ (640BZ) |
| FOR [58QT] (HARNESS-RIGHT WING, TANK A) | |
| FOR [64QT] (HARNESS-RIGHT WING TANK B) | |
| FOR [63QT] (HARNESS-LEFT WING TANK B) | |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 57-27-11-000-001-A | Removal of the Access Panel |
| TASK 57-27-11-000-002-A | Removal of the Access Panel |
| TASK 57-27-11-400-001-A | Installation of the Access Panel |
| TASK 57-27-11-400-002-A | Installation of the Access Panel |
| TASK 57-27-12-000-002-A | Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ) |
| TASK 57-27-12-400-002-A | Installation of the Rib 2 Access Panel 540AZ (640AZ) or 540BZ (640BZ) |
| FOR [64QT] (HARNESS-RIGHT WING TANK B) | |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 57-27-11-000-001-A | Removal of the Access Panel |
| TASK 57-27-11-000-002-A | Removal of the Access Panel |
| TASK 57-27-11-400-001-A | Installation of the Access Panel |
| TASK 57-27-11-400-002-A | Installation of the Access Panel |
| TASK 57-27-12-000-002-A | Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ) |
| TASK 57-27-12-400-002-A | Installation of the Rib 2 Access Panel 540AZ (640AZ) or 540BZ (640BZ) |
Subtask 28-42-43-941-063-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(2) Make sure that the SAFETY BARRIER(S) are in position.
Subtask 28-42-43-860-051-A ** ON A/C NOT FOR ALL WARNING:
BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
(1) You must obey the fuel safety procedures (Ref. AMM TASK 28-10-00-910-001) when you do work in a fuel tank. (2) Make sure that the SAFETY BARRIER(S) are in position.
B. Aircraft Maintenance Configuration
(1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001) .
(2) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is below the applicable zone:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
below ZONE 540.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A), [64QT] (HARNESS-RIGHT WING TANK B)
below ZONE 640.
(3) Make sure that the applicable access panels have been removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Remove 540AB, 540BB, 540DB, 540HB and 540NB.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Remove 640AB, 640BB, 640DB, 640HB and 640NB.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Remove 540AB, 540BB, 540EB, 540FB, 540LB, 540MB, 540PB and 540QB.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Remove 640AB, 640BB, 640EB, 640FB, 640LB, 640MB, 640PB and 640QB.
(4) Open access panel 574BB(674BB).
(5) Make sure that the applicable surge door is open:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Open 540AZ and 540BZ.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Open 640AZ and 640BZ.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Open 540BZ.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Open 640BZ.
(6) Make sure that the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) or 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS) is on the applicable surge door.
Subtask 28-42-43-860-051-B ** ON A/C NOT FOR ALL (1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001) .
(2) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is below the applicable zone:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
below ZONE 540.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A), [64QT] (HARNESS-RIGHT WING TANK B)
below ZONE 640.
(3) Make sure that the applicable access panels have been removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Remove 540AB, 540BB, 540DB, 540HB and 540NB.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Remove 640AB, 640BB, 640DB, 640HB and 640NB.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Remove 540AB, 540BB, 540EB, 540FB, 540LB, 540MB, 540PB and 540QB.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Remove 640AB, 640BB, 640EB, 640FB, 640LB, 640MB, 640PB and 640QB.
(4) Open access panel 574BB(674BB).
(5) Make sure that the applicable surge door is open:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Open 540AZ and 540BZ.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Open 640AZ and 640BZ.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Open 540BZ.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Open 640BZ.
(6) Make sure that the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) or 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS) is on the applicable surge door.
B. Aircraft Maintenance Configuration
(1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is below the applicable zone:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
below ZONE 540.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A), [64QT] (HARNESS-RIGHT WING TANK B)
below ZONE 640.
(3) Make sure that the applicable access panels are removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Remove 540AB, 540BB, 540DB, 540HB and 540NB.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Remove 640AB, 640BB, 640DB, 640HB and 640NB.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Remove 540AB, 540BB, 540EB, 540FB, 540LB, 540MB, 540PB and 540QB.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Remove 640AB, 640BB, 640EB, 640FB, 640LB, 640MB, 640PB and 640QB.
(4) Open access panel 574BB(674BB).
(5) Make sure that the applicable surge door is open:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Open 540AZ and 540BZ.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Open 640AZ and 640BZ.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Open 540BZ.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Open 640BZ.
(6) Make sure that the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) or 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS) is on the applicable surge door.
Subtask 28-42-43-860-051-D ** ON A/C NOT FOR ALL (1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is below the applicable zone:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
below ZONE 540.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A), [64QT] (HARNESS-RIGHT WING TANK B)
below ZONE 640.
(3) Make sure that the applicable access panels are removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Remove 540AB, 540BB, 540DB, 540HB and 540NB.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Remove 640AB, 640BB, 640DB, 640HB and 640NB.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Remove 540AB, 540BB, 540EB, 540FB, 540LB, 540MB, 540PB and 540QB.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Remove 640AB, 640BB, 640EB, 640FB, 640LB, 640MB, 640PB and 640QB.
(4) Open access panel 574BB(674BB).
(5) Make sure that the applicable surge door is open:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Open 540AZ and 540BZ.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Open 640AZ and 640BZ.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Open 540BZ.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Open 640BZ.
(6) Make sure that the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) or 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS) is on the applicable surge door.
B. Aircraft Maintenance Configuration
(1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) (a) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
Below zone 540.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A), [64QT] (HARNESS-RIGHT WING TANK B)
Below zone 640.
(3) Make sure that the applicable access panels are removed that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Remove 540AB, 540BB, 540DB, 540HB and 540NB (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002).
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Remove 640AB, 640BB, 640DB, 640HB and 640NB (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002).
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Remove 540AB, 540BB, 540EB, 540FB, 540LB, 540MB, 540PB and 540QB (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002).
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Remove 640AB, 640BB, 640EB, 640FB, 640LB, 640MB, 640PB and 640QB (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002).
(4) Remove the applicable access door 574BB ( 674BB) (Ref. AMM TASK 57-51-37-000-009).
(5) Make sure that the applicable RIB2 access panels are removed that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Remove 540AZ and 540BZ (Ref. AMM TASK 57-27-12-000-002).
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Remove 640AZ and 640BZ (Ref. AMM TASK 57-27-12-000-002).
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Remove 540BZ (Ref. AMM TASK 57-27-12-000-002).
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Remove 640BZ (Ref. AMM TASK 57-27-12-000-002).
Subtask 28-42-43-865-063-A ** ON A/C NOT FOR ALL (1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) (a) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
Below zone 540.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A), [64QT] (HARNESS-RIGHT WING TANK B)
Below zone 640.
(3) Make sure that the applicable access panels are removed that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Remove 540AB, 540BB, 540DB, 540HB and 540NB (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002).
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Remove 640AB, 640BB, 640DB, 640HB and 640NB (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002).
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Remove 540AB, 540BB, 540EB, 540FB, 540LB, 540MB, 540PB and 540QB (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002).
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Remove 640AB, 640BB, 640EB, 640FB, 640LB, 640MB, 640PB and 640QB (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 57-27-11-000-002).
(4) Remove the applicable access door 574BB ( 674BB) (Ref. AMM TASK 57-51-37-000-009).
(5) Make sure that the applicable RIB2 access panels are removed that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Remove 540AZ and 540BZ (Ref. AMM TASK 57-27-12-000-002).
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Remove 640AZ and 640BZ (Ref. AMM TASK 57-27-12-000-002).
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Remove 540BZ (Ref. AMM TASK 57-27-12-000-002).
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Remove 640BZ (Ref. AMM TASK 57-27-12-000-002).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FUEL/FQI/CHAN/1 | 1QT | A13 |
| 49VU | FUEL/AFT LOW LVL/& OVFL/WING R | 44QJ | A11 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/FQI/CHANNEL/1 AND 2 | 8QT | L26 |
| 121VU | FUEL/HI/LVL/SPLY | 1QJ | L25 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/FQI/CHAN/2 | 2QT | M27 |
| 121VU | FUEL/FWD LOW LVL/WING/R | 45QJ | M23 |
| 121VU | FUEL/FWD LOW LVL/WING/L | 46QJ | M22 |
| 121VU | FUEL/CTR TK/AUTO/CTL | 3QL | R27 |
| 121VU | FUEL/CTR TK/L&R XFR/CTL & IND | 2QL | R26 |
| 121VU | FUEL/CTR TK/L&R XFR/CTL & IND | 1QL | R25 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/FQI/CHANNEL/1 AND 2 | 8QT | L25 |
| 121VU | FUEL/HI/LVL/SPLY | 1QJ | L24 |
WARNING:
MAKE SURE THAT ALL CABLES IN FUEL TANKS ARE CORRECTLY SUPPORTED (BY CLIPS AND OTHER SUPPORTS).
IF CLIPS OR SUPPORTS ARE MISSING OR DAMAGED, YOU MUST REPLACE THEM.
WARNING:
DO NOT REPAIR CABLES THAT ARE IN FUEL TANKS. DO NOT MAKE IN-LINE SPLICES. IF A CABLE IS DEFECTIVE, YOU MUST REPLACE THE FULL CABLE ASSEMBLY.
WARNING:
MAKE SURE THAT THE INSTALLATION AND ROUTING OF ALL ELECTRICAL CABLES AGREE WITH THE REQUIREMENTS OF THE ELECTRICAL STANDARD PRACTICES MANUAL.
Subtask 28-42-43-420-098-A ** ON A/C NOT FOR ALL A. Preparation for Installation
Wing Tank Harness RIB 2 to RIB 3 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness (Group A) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness (Group B) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 1 to RIB 2 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 3 to RIB 4 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 5 to RIB 6 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 6 to RIB 14 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 16 to RIB 17 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 18 to RIB 21 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 2 to RIB 3 - Detail ** ON A/C NOT FOR ALL
(2) Use a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) to clean:
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 28-42-43-420-098-B ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 2 to RIB 3 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness (Group A) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness (Group B) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 1 to RIB 2 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 3 to RIB 4 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 5 to RIB 6 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 6 to RIB 14 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 16 to RIB 17 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 18 to RIB 21 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 2 to RIB 3 - Detail ** ON A/C NOT FOR ALL WARNING:
WHEN YOU USE COMPRESSED AIR:
- USE THE CORRECT PROTECTION (FACE SHIELD OR GOGGLES)
- DO NOT POINT THE AIRFLOW AT YOURSELF OR OTHER PERSONS.
WARNING:
DO NOT LET COMPRESSED GAS TOUCH YOUR SKIN. THE GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS CONDITION CAN KILL YOU.
(1) Use a SPATULA - PLASTIC to remove the sealant at the interface of the electrical backshell (8) and the rear spar. (2) Use a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) to clean:
- the electrical backshell (8)
- the interface of the electrical backshell (8) and the rear spar.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
A. Preparation for Installation
(2) Use a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) to clean:
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 28-42-43-420-091-C ** ON A/C NOT FOR ALL WARNING:
WHEN YOU USE COMPRESSED AIR:
- USE THE CORRECT PROTECTION (FACE SHIELD OR GOGGLES)
- DO NOT POINT THE AIRFLOW AT YOURSELF OR OTHER PERSONS.
WARNING:
DO NOT LET COMPRESSED GAS TOUCH YOUR SKIN. THE GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS CONDITION CAN KILL YOU.
(1) Use a SPATULA - PLASTIC to remove the sealant at the interface of the electrical backshell (7) and the rear spar. (2) Use a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) to clean:
- The electrical backshell (7)
- The interface of the electrical backshell (7) and the rear spar.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
B. Installation of the Wing-Tank Harness 57QT (58QT), 63QT (64QT)
Wing Tank Harness (Group A) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness (Group B) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 1 to RIB 2 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 2 to RIB 3 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 3 to RIB 4 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 5 to RIB 6 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 6 to RIB 14 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 16 to RIB 17 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 18 to RIB 21 - Detail ** ON A/C NOT FOR ALL
(1) Get access to opening 540BB ( 640BB).
(2) Identify and attach each piece of string to its applicable wing-tank harness cable.
(3) Attach the related connectors together at all the ends of the wing tank harness with a TAPE - ADHESIVE.
(5) When you install the wing tank harness, make sure that it does not catch.
(6) Remove and discard the adhesive tape and the string from all the ends of the wing tank harness.
(7) Apply a Threadlocking Adhesive-- Low strength - (Material No.05BAA1) to the threads of the electrical backshell (8).
(8) Install a new AIPC 28-42-43-02-025 O-RING (4) on the electrical backshell (8).
(9) Install the electrical backshell (8) in the rear spar.
(10) Get access through opening 574BB ( 674BB).
(11) Install the washer (5) and the nut (6).
(12) TORQUE the nut (6) to between 1.27 and 1.16 m.daN (112.39 and 102.65 lbf.in )
.
(13) Use a Textile-Lint free Cotton - (Material No.14SBA1) to remove unwanted adhesive from the electrical backshell (8) and the nut (6).
(14) Safety the nut (6) an adjacent tag with a14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(15) Apply a Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) around the electrical backshell (8) to seal it to the rear spar.
(16) Connect the electrical connector (7) to the electrical backshell (8).
(17) Clean the electrical connector (7) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with a Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(18) Apply a continuous layer of Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) to the electrical connector (7).
(19) Identify the cable ends for the probes that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2), 60QT1(60QT2) and 34QT1(34QT2).
(20) Use a CRIMPING TOOL 46447 to crimp the correct terminal connectors to the color identified wires ESPM 2048140 and ESPM 2048190.
(21) Connect the cable ends to their correct terminals of the probes (Ref. AMM TASK 28-42-15-400-005):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2), 60QT1(60QT2) and 34QT1(34QT2).
(22) Identify the cable ends for the sensors that follow and connect them to their correct terminals (Ref. AMM TASK 28-46-15-400-009) (Ref. AMM TASK 28-46-17-400-001) (Ref. AMM TASK 28-46-19-400-001):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
16QJ1(16QJ2), 29QJ1(29QJ2), 38QJ1(38QJ2), 40QJ1(40QJ2) and 17QJ1(17QJ2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
23QJ1(23QJ2), 24QJ1(24QJ2), 15QJ1(15QJ2), 39QJ1(39QJ2), 25QJ1(25QJ2), 26QJ1(26QJ2) and 27QJ1(27QJ2).
(c) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
correct terminals (Ref. AMM TASK 28-42-48-400-001).
(23) Identify the cable ends for the dualcomp (53QT) and connect them to their correct terminals (Ref. AMM TASK 28-42-46-400-001).
(24) Identify the cable ends for the ultracomp (52QT) and connect them to their correct terminals (Ref. AMM TASK 28-42-48-400-001).
(25) Attach the wing tank harness to the aircraft structure as follows:
Subtask 28-42-43-420-091-E ** ON A/C NOT FOR ALL
Wing Tank Harness (Group A) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness (Group B) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 1 to RIB 2 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 2 to RIB 3 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 3 to RIB 4 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 5 to RIB 6 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 6 to RIB 14 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 16 to RIB 17 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 18 to RIB 21 - Detail ** ON A/C NOT FOR ALL (2) Identify and attach each piece of string to its applicable wing-tank harness cable.
(3) Attach the related connectors together at all the ends of the wing tank harness with a TAPE - ADHESIVE.
NOTE: This will help you move the wing tank harness through its conduit.
(4) Use the string carefully to pull the wing tank harness through its conduit.(5) When you install the wing tank harness, make sure that it does not catch.
(6) Remove and discard the adhesive tape and the string from all the ends of the wing tank harness.
(7) Apply a Threadlocking Adhesive-- Low strength - (Material No.05BAA1) to the threads of the electrical backshell (8).
(8) Install a new AIPC 28-42-43-02-025 O-RING (4) on the electrical backshell (8).
(9) Install the electrical backshell (8) in the rear spar.
(10) Get access through opening 574BB ( 674BB).
(11) Install the washer (5) and the nut (6).
(12) TORQUE the nut (6) to between 1.27 and 1.16 m.daN (112.39 and 102.65 lbf.in )
. (13) Use a Textile-Lint free Cotton - (Material No.14SBA1) to remove unwanted adhesive from the electrical backshell (8) and the nut (6).
(14) Safety the nut (6) an adjacent tag with a
(15) Apply a Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) around the electrical backshell (8) to seal it to the rear spar.
(16) Connect the electrical connector (7) to the electrical backshell (8).
(17) Clean the electrical connector (7) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with a Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(18) Apply a continuous layer of Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) to the electrical connector (7).
(19) Identify the cable ends for the probes that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2), 60QT1(60QT2) and 34QT1(34QT2).
(20) Use a CRIMPING TOOL 46447 to crimp the correct terminal connectors to the color identified wires ESPM 2048140 and ESPM 2048190.
(21) Connect the cable ends to their correct terminals of the probes (Ref. AMM TASK 28-42-15-400-005):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2), 60QT1(60QT2) and 34QT1(34QT2).
(22) Identify the cable ends for the sensors that follow and connect them to their correct terminals (Ref. AMM TASK 28-46-15-400-009) (Ref. AMM TASK 28-46-17-400-001) (Ref. AMM TASK 28-46-19-400-001):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
16QJ1(16QJ2), 29QJ1(29QJ2), 38QJ1(38QJ2), 40QJ1(40QJ2) and 17QJ1(17QJ2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
23QJ1(23QJ2), 24QJ1(24QJ2), 15QJ1(15QJ2), 39QJ1(39QJ2), 25QJ1(25QJ2), 26QJ1(26QJ2) and 27QJ1(27QJ2).
(c) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
correct terminals (Ref. AMM TASK 28-42-48-400-001).
(23) Identify the cable ends for the dualcomp (53QT) and connect them to their correct terminals (Ref. AMM TASK 28-42-46-400-001).
(24) Identify the cable ends for the ultracomp (52QT) and connect them to their correct terminals (Ref. AMM TASK 28-42-48-400-001).
(25) Attach the wing tank harness to the aircraft structure as follows:
- Install the related loop-clamps (3) and the related bolts (2)
- Install the related AIPC 28-42-05-55-010 CABLE-TIES (1) inboard of RIB15
- Install the related AIPC 28-42-05-56-010 CABLE-TIES (1) outboard of RIB15.
B. Installation of the Wing-Tank Harness 57QT (58QT), 63QT (64QT)
Wing Tank Harness (Group A) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness (Group B) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 1 to RIB 2 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 2 to RIB 3 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 3 to RIB 4 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 5 to RIB 6 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 6 to RIB 14 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 16 to RIB 17 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 18 to RIB 21 - Detail ** ON A/C NOT FOR ALL
(1) Get access to opening 540BB ( 640BB).
(2) Identify and attach each piece of string to its applicable wing-tank harness cable.
(3) Attach the related connectors together at all the ends of the wing tank harness with a TAPE - ADHESIVE.
(5) When you install the wing tank harness, make sure that it does not catch.
(6) Remove and discard the adhesive tape and the string from every end of the wing tank harness.
(7) Apply a Threadlocking Adhesive-- Low strength - (Material No.05BAA1) to the threads of the electrical backshell (8).
(8) Install a new AIPC 28-42-43-02-025 O-RING (4) on the electrical backshell (8).
(9) Install the electrical backshell (8) in the rear spar.
(10) Get access through opening 574BB ( 674BB).
(11) Install the washer (5) and the nut (6).
(12) TORQUE the nut (6) to between 1.27 and 1.16 m.daN (112.39 and 102.65 lbf.in )
.
(13) Use a Textile-Lint free Cotton - (Material No.14SBA1) to remove unwanted adhesive from the electrical backshell (8) and the nut (6).
(14) Safety the nut (6) to an adjacent tag with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(15) Apply a Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) around the electrical backshell (8) to seal it to the rear spar.
(16) Connect the electrical connector (7) to the electrical backshell (8).
(17) Clean the electrical connector (7) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with a Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(18) Apply a continuous layer of Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) to the electrical connector (7).
(19) Identify the cable ends for the probes that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2), 60QT1(60QT2) and 34QT1(34QT2).
(20) Use a CRIMPING TOOL 46447 to crimp the correct terminal connectors to the color identified wires ESPM 2048140 and ESPM 2048190.
(21) Connect the cable ends to their correct terminals of the probes (Ref. AMM TASK 28-42-15-400-005):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2) 60QT1(60QT2) and 34QT1(34QT2).
(22) Identify the cable ends for the sensors that follow and connect them to their correct terminals (Ref. AMM TASK 28-46-15-400-009) (Ref. AMM TASK 28-46-17-400-001) (Ref. AMM TASK 28-46-19-400-001):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
16QJ1(16QJ2), 29QJ1(29QJ2), 38QJ1(38QJ2), 40QJ1(40QJ2) and 17QJ1(17QJ2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
23QJ1(23QJ2), 24QJ1(24QJ2), 15QJ1(15QJ2), 39QJ1(39QJ2), 25QJ1(25QJ2), 26QJ1(26QJ2) and 27QJ1(27QJ2).
(c) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
correct terminals (Ref. AMM TASK 28-42-48-400-001).
(23) Identify the cable ends for the dualcomp (53QT) and connect them to their correct terminals (Ref. AMM TASK 28-42-46-400-001).
(24) Identify the cable ends for the ultracomp (52QT) and connect them to their correct terminals (Ref. AMM TASK 28-42-48-400-001).
(25) Attach the wing tank harness to the aircraft structure as follows:
Subtask 28-42-43-420-091-F ** ON A/C NOT FOR ALL
Wing Tank Harness (Group A) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness (Group B) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 1 to RIB 2 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 2 to RIB 3 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 3 to RIB 4 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 5 to RIB 6 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 6 to RIB 14 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 16 to RIB 17 - Detail ** ON A/C NOT FOR ALL
Wing Tank Harness RIB 18 to RIB 21 - Detail ** ON A/C NOT FOR ALL (2) Identify and attach each piece of string to its applicable wing-tank harness cable.
(3) Attach the related connectors together at all the ends of the wing tank harness with a TAPE - ADHESIVE.
NOTE: This will help you move the wing tank harness through its conduit.
(4) Use the string to carefully pull the wing tank harness through its conduit.(5) When you install the wing tank harness, make sure that it does not catch.
(6) Remove and discard the adhesive tape and the string from every end of the wing tank harness.
(7) Apply a Threadlocking Adhesive-- Low strength - (Material No.05BAA1) to the threads of the electrical backshell (8).
(8) Install a new AIPC 28-42-43-02-025 O-RING (4) on the electrical backshell (8).
(9) Install the electrical backshell (8) in the rear spar.
(10) Get access through opening 574BB ( 674BB).
(11) Install the washer (5) and the nut (6).
(12) TORQUE the nut (6) to between 1.27 and 1.16 m.daN (112.39 and 102.65 lbf.in )
. (13) Use a Textile-Lint free Cotton - (Material No.14SBA1) to remove unwanted adhesive from the electrical backshell (8) and the nut (6).
(14) Safety the nut (6) to an adjacent tag with
(15) Apply a Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) around the electrical backshell (8) to seal it to the rear spar.
(16) Connect the electrical connector (7) to the electrical backshell (8).
(17) Clean the electrical connector (7) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with a Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(18) Apply a continuous layer of Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) to the electrical connector (7).
(19) Identify the cable ends for the probes that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2), 60QT1(60QT2) and 34QT1(34QT2).
(20) Use a CRIMPING TOOL 46447 to crimp the correct terminal connectors to the color identified wires ESPM 2048140 and ESPM 2048190.
(21) Connect the cable ends to their correct terminals of the probes (Ref. AMM TASK 28-42-15-400-005):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2) 60QT1(60QT2) and 34QT1(34QT2).
(22) Identify the cable ends for the sensors that follow and connect them to their correct terminals (Ref. AMM TASK 28-46-15-400-009) (Ref. AMM TASK 28-46-17-400-001) (Ref. AMM TASK 28-46-19-400-001):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
16QJ1(16QJ2), 29QJ1(29QJ2), 38QJ1(38QJ2), 40QJ1(40QJ2) and 17QJ1(17QJ2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
23QJ1(23QJ2), 24QJ1(24QJ2), 15QJ1(15QJ2), 39QJ1(39QJ2), 25QJ1(25QJ2), 26QJ1(26QJ2) and 27QJ1(27QJ2).
(c) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
correct terminals (Ref. AMM TASK 28-42-48-400-001).
(23) Identify the cable ends for the dualcomp (53QT) and connect them to their correct terminals (Ref. AMM TASK 28-42-46-400-001).
(24) Identify the cable ends for the ultracomp (52QT) and connect them to their correct terminals (Ref. AMM TASK 28-42-48-400-001).
(25) Attach the wing tank harness to the aircraft structure as follows:
- Install the related loop-clamps (3) and the related bolts (2).
- Install the related AIPC 28-42-05-55-010 CABLE-TIES (1) and nylon spacers (9) inboard of RIB15
- Install the related AIPC 28-42-05-56-010 CABLE-TIES (1) outboard of RIB15.
B. Installation of the Wing-Tank Harness 57QT (58QT), 63QT (64QT)
(1) Get access to opening 540BB ( 640BB).
(2) Identify and attach each piece of string to its applicable wing-tank harness cable.
(3) Attach the related connectors together at all the ends of the wing tank harness with TAPE - ADHESIVE.
(5) When you install the wing tank harness, make sure that it does not catch.
(6) Remove and discard the adhesive tape and the string from every end of the wing tank harness.
(7) Apply a Threadlocking Adhesive-- Low strength - (Material No.05BAA1) to the threads of the electrical backshell (7).
(8) Install a new AIPC 28-42-43-02-025 O-RING (8) on the electrical backshell (7).
(9) Install the electrical backshell (7) in the rear spar.
(10) Get access through the opening 574BB ( 674BB).
(11) Install the washer (9) and the nut (10).
(12) TORQUE the nut (10) to between 1.27 and 1.16 m.daN (112.39 and 102.65 lbf.in )
.
(13) Use a Textile-Lint free Cotton - (Material No.14SBA1) to remove unwanted adhesive from the electrical backshell (7) and the nut (10).
(14) Safety the nut (10) to an adjacent tag with a14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(15) Apply a Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) around the electrical backshell (7) to seal it to the rear spar.
(16) Connect the electrical connector (11) to the electrical backshell (7).
(17) Clean the electrical connector (11) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with a Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(18) Apply a continuous layer of Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) to the electrical connector (11).
(19) Identify the cable ends for the probes that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2), 60QT1(60QT2) and 34QT1(34QT2).
(20) Use a CRIMPING TOOL 46447 to crimp the correct terminal connectors to the color identified wires ESPM 2048140 and ESPM 2048190.
(21) Connect the cable ends to their correct terminals of the probes (Ref. AMM TASK 28-42-15-400-005):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2) 60QT1(60QT2) and 34QT1(34QT2).
(22) Identify the cable ends for the sensors that follow and connect them to their correct terminals (Ref. AMM TASK 28-46-15-400-009) (Ref. AMM TASK 28-46-17-400-001) (Ref. AMM TASK 28-46-19-400-001):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
16QJ1(16QJ2), 29QJ1(29QJ2), 38QJ1(38QJ2), 40QJ1(40QJ2) and 17QJ1(17QJ2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
23QJ1(23QJ2), 24QJ1(24QJ2), 15QJ1(15QJ2), 39QJ1(39QJ2), 25QJ1(25QJ2), 26QJ1(26QJ2) and 27QJ1(27QJ2).
(c) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
(24) Identify the cable ends for the ultracomp (52QT) and connect them to their correct terminals (Ref. AMM TASK 28-42-48-400-001).
(25) Attach the wing tank harness to the aircraft structure as follows:
(a) Install the related loop-clamps (3) and the related bolts (2).
(b) Install the related new AIPC 28-42-85-55-010 CABLE-TIES (1) and nylon spacers (6) at the RIB2.
(c) Install the related loop-clamps (3), the bolt (4), the nylon spacer (6) and the nut (5) at the RIB2.
(d) TORQUE the nut (5) to between 0.40 and 0.30 m.daN (35.40 and 26.55 lbf.in )
.
(e) Install the related new cable-ties (1) inboard of the RIB15.
(f) Install the related new AIPC 28-42-85-56-010 CABLE-TIES (1) outboard of the RIB15.
(26) Apply a Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) to the bolts (2) and their related anchor nuts.
Subtask 28-42-43-865-064-A ** ON A/C NOT FOR ALL (1) Get access to opening 540BB ( 640BB).
(2) Identify and attach each piece of string to its applicable wing-tank harness cable.
(3) Attach the related connectors together at all the ends of the wing tank harness with TAPE - ADHESIVE.
NOTE: This will help you move the wing tank harness through its conduit.
(4) Use the string to carefully pull the wing tank harness through its conduit.(5) When you install the wing tank harness, make sure that it does not catch.
(6) Remove and discard the adhesive tape and the string from every end of the wing tank harness.
(7) Apply a Threadlocking Adhesive-- Low strength - (Material No.05BAA1) to the threads of the electrical backshell (7).
(8) Install a new AIPC 28-42-43-02-025 O-RING (8) on the electrical backshell (7).
(9) Install the electrical backshell (7) in the rear spar.
(10) Get access through the opening 574BB ( 674BB).
(11) Install the washer (9) and the nut (10).
(12) TORQUE the nut (10) to between 1.27 and 1.16 m.daN (112.39 and 102.65 lbf.in )
. (13) Use a Textile-Lint free Cotton - (Material No.14SBA1) to remove unwanted adhesive from the electrical backshell (7) and the nut (10).
(14) Safety the nut (10) to an adjacent tag with a
(15) Apply a Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) around the electrical backshell (7) to seal it to the rear spar.
(16) Connect the electrical connector (11) to the electrical backshell (7).
(17) Clean the electrical connector (11) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with a Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(18) Apply a continuous layer of Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) to the electrical connector (11).
(19) Identify the cable ends for the probes that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2), 60QT1(60QT2) and 34QT1(34QT2).
(20) Use a CRIMPING TOOL 46447 to crimp the correct terminal connectors to the color identified wires ESPM 2048140 and ESPM 2048190.
(21) Connect the cable ends to their correct terminals of the probes (Ref. AMM TASK 28-42-15-400-005):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
21QT1(21QT2), 54QT1(54QT2), 23QT1(23QT2), 25QT1(25QT2), 27QT1(27QT2), 29QT1(29QT2), 59QT1(59QT2) and 61QT1(61QT2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
54QT1(54QT2), 56QT1(56QT2), 26QT1(26QT2), 28QT1(28QT2), 30QT1(30QT2) 60QT1(60QT2) and 34QT1(34QT2).
(22) Identify the cable ends for the sensors that follow and connect them to their correct terminals (Ref. AMM TASK 28-46-15-400-009) (Ref. AMM TASK 28-46-17-400-001) (Ref. AMM TASK 28-46-19-400-001):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
16QJ1(16QJ2), 29QJ1(29QJ2), 38QJ1(38QJ2), 40QJ1(40QJ2) and 17QJ1(17QJ2).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
23QJ1(23QJ2), 24QJ1(24QJ2), 15QJ1(15QJ2), 39QJ1(39QJ2), 25QJ1(25QJ2), 26QJ1(26QJ2) and 27QJ1(27QJ2).
(c) FOR [57QT] (HARNESS-LEFT WING TANK A), [63QT] (HARNESS-LEFT WING TANK B)
- Correct terminals (Ref. AMM TASK 28-42-48-400-001).
(24) Identify the cable ends for the ultracomp (52QT) and connect them to their correct terminals (Ref. AMM TASK 28-42-48-400-001).
(25) Attach the wing tank harness to the aircraft structure as follows:
(a) Install the related loop-clamps (3) and the related bolts (2).
(b) Install the related new AIPC 28-42-85-55-010 CABLE-TIES (1) and nylon spacers (6) at the RIB2.
(c) Install the related loop-clamps (3), the bolt (4), the nylon spacer (6) and the nut (5) at the RIB2.
(d) TORQUE the nut (5) to between 0.40 and 0.30 m.daN (35.40 and 26.55 lbf.in )
. (e) Install the related new cable-ties (1) inboard of the RIB15.
(f) Install the related new AIPC 28-42-85-56-010 CABLE-TIES (1) outboard of the RIB15.
(26) Apply a Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) to the bolts (2) and their related anchor nuts.
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 28-42-43-410-061-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FUEL/FQI/CHAN/1 | 1QT | A13 |
| 49VU | FUEL/AFT LOW LVL/& OVFL/WING R | 44QJ | A11 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/FQI/CHANNEL/1 AND 2 | 8QT | L26 |
| 121VU | FUEL/HI/LVL/SPLY | 1QJ | L25 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/FQI/CHAN/2 | 2QT | M27 |
| 121VU | FUEL/FWD LOW LVL/WING/R | 45QJ | M23 |
| 121VU | FUEL/FWD LOW LVL/WING/L | 46QJ | M22 |
| 121VU | FUEL/CTR TK/AUTO/CTL | 3QL | R27 |
| 121VU | FUEL/CTR TK/L&R XFR/CTL & IND | 2QL | R26 |
| 121VU | FUEL/CTR TK/L&R XFR/CTL & IND | 1QL | R25 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/FQI/CHANNEL/1 AND 2 | 8QT | L25 |
| 121VU | FUEL/HI/LVL/SPLY | 1QJ | L24 |
D. Close Access
Wing Tank Harness (Group A) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness (Group B) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness 57QT (58QT) and 63QT (64QT) ** ON A/C NOT FOR ALL
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the applicable tool from the spring-loaded surge door:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
Remove the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) and the 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
Remove the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS).
(3) Carefully close the applicable surge door:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Close 540AZ 540BZ.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Close 640AZ 640BZ.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Close 540BZ.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Close 640BZ.
(4) Close access panel 574BB(674BB).
(5) Install the applicable access panels (Ref. AMM TASK 57-27-11-400-001) (Ref. AMM TASK 57-27-11-400-002):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Install 540AB 540BB 540DB 540HB 540NB.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Install 640AB 640BB 640DB 640HB 640NB.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Install 540AB 540BB 540EB 540FB 540LB 540MB 540PB 540QB.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Install 640AB 640BB 640EB 640FB 640LB 640MB 640PB 640QB.
Subtask 28-42-43-410-061-D ** ON A/C NOT FOR ALL
Wing Tank Harness (Group A) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness (Group B) - Component Location ** ON A/C NOT FOR ALL
Wing Tank Harness 57QT (58QT) and 63QT (64QT) ** ON A/C NOT FOR ALL (2) Remove the applicable tool from the spring-loaded surge door:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A), [58QT] (HARNESS-RIGHT WING, TANK A)
Remove the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) and the 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS).
(b) FOR [63QT] (HARNESS-LEFT WING TANK B), [64QT] (HARNESS-RIGHT WING TANK B)
Remove the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS).
(3) Carefully close the applicable surge door:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Close 540AZ 540BZ.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Close 640AZ 640BZ.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Close 540BZ.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Close 640BZ.
(4) Close access panel 574BB(674BB).
(5) Install the applicable access panels (Ref. AMM TASK 57-27-11-400-001) (Ref. AMM TASK 57-27-11-400-002):
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Install 540AB 540BB 540DB 540HB 540NB.
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Install 640AB 640BB 640DB 640HB 640NB.
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Install 540AB 540BB 540EB 540FB 540LB 540MB 540PB 540QB.
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Install 640AB 640BB 640EB 640FB 640LB 640MB 640PB 640QB.
D. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable RIB2 access panels that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Install 540AZ and 540BZ (Ref. AMM TASK 57-27-12-400-002).
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Install 640AZ and 640BZ (Ref. AMM TASK 57-27-12-400-002).
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Install 540BZ (Ref. AMM TASK 57-27-12-400-002).
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Install 640BZ (Ref. AMM TASK 57-27-12-400-002).
(3) Install the applicable access door 574BB ( 674BB) (Ref. AMM TASK 57-51-37-400-009).
(4) Install the applicable access panels that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Install 540AB, 540BB, 540DB, 540HB and 540NB (Ref. AMM TASK 57-27-11-400-001) and (Ref. AMM TASK 57-27-11-400-002).
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Install 640AB, 640BB, 640DB, 640HB and 640NB (Ref. AMM TASK 57-27-11-400-001) and (Ref. AMM TASK 57-27-11-400-002).
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Install 540AB, 540BB, 540EB, 540FB, 540LB, 540MB, 540PB and 540QB (Ref. AMM TASK 57-27-11-400-001) and (Ref. AMM TASK 57-27-11-400-002).
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Install 640AB, 640BB, 640EB, 640FB, 640LB, 640MB, 640PB and 640QB (Ref. AMM TASK 57-27-11-400-001) and (Ref. AMM TASK 57-27-11-400-002).
Subtask 28-42-43-740-055-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable RIB2 access panels that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Install 540AZ and 540BZ (Ref. AMM TASK 57-27-12-400-002).
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Install 640AZ and 640BZ (Ref. AMM TASK 57-27-12-400-002).
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Install 540BZ (Ref. AMM TASK 57-27-12-400-002).
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Install 640BZ (Ref. AMM TASK 57-27-12-400-002).
(3) Install the applicable access door 574BB ( 674BB) (Ref. AMM TASK 57-51-37-400-009).
(4) Install the applicable access panels that follow:
(a) FOR [57QT] (HARNESS-LEFT WING TANK A)
Install 540AB, 540BB, 540DB, 540HB and 540NB (Ref. AMM TASK 57-27-11-400-001) and (Ref. AMM TASK 57-27-11-400-002).
(b) FOR [58QT] (HARNESS-RIGHT WING, TANK A)
Install 640AB, 640BB, 640DB, 640HB and 640NB (Ref. AMM TASK 57-27-11-400-001) and (Ref. AMM TASK 57-27-11-400-002).
(c) FOR [63QT] (HARNESS-LEFT WING TANK B)
Install 540AB, 540BB, 540EB, 540FB, 540LB, 540MB, 540PB and 540QB (Ref. AMM TASK 57-27-11-400-001) and (Ref. AMM TASK 57-27-11-400-002).
(d) FOR [64QT] (HARNESS-RIGHT WING TANK B)
Install 640AB, 640BB, 640EB, 640FB, 640LB, 640MB, 640PB and 640QB (Ref. AMM TASK 57-27-11-400-001) and (Ref. AMM TASK 57-27-11-400-002).
E. Test
(1) Do a status report (BITE) of the fuel-quantity indicating system (Ref. AMM TASK 28-42-00-740-001).
(2) Do a functional (BITE) test of the fuel-tank level-sensing system (Ref. AMM TASK 28-46-00-740-001).
5. Close-up(1) Do a status report (BITE) of the fuel-quantity indicating system (Ref. AMM TASK 28-42-00-740-001).
(2) Do a functional (BITE) test of the fuel-tank level-sensing system (Ref. AMM TASK 28-46-00-740-001).
Subtask 28-42-43-942-052-A ** ON A/C NOT FOR ALL
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.