Reactivation of the APU LP Valve Indication
TASK 28-40-00-440-001-A
Reactivation of the APU LP Valve Indication
MMEL 28-07-04-02A
APU LP FUEL VALVE INDICATION ON THE FUEL SD PAGE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 28-40-00-941-057-A
Subtask 28-40-00-440-050-A
Subtask 28-40-00-410-053-A Subtask 28-40-00-942-057-A
[Rev.10 from 2021]
2026.04.02 06:18:03 UTC
Reactivation of the APU LP Valve Indication
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
MMEL 28-07-04-02A
APU LP FUEL VALVE INDICATION ON THE FUEL SD PAGE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY BARRIER(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 28-29-00-440-002-A | APU LP VALVE - Reactivation |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 28-40-00-941-057-A
A. Safety Precautions
(2) Put the SAFETY BARRIER(S) in position.
Subtask 28-40-00-860-050-A WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
(1) You must obey the fuel safety procedures when you do work on the fuel system (Ref. AMM TASK 28-00-00-910-001). (2) Put the SAFETY BARRIER(S) in position.
B. Aircraft Maintenance Configuration
(1) Open the MLG doors (Ref. AMM TASK 32-12-00-010-001).
(2) Make sure that the 460005835 SLEEVE - GROUND LOCK is installed on the applicable MLG door actuating-cylinder.
4. Procedure(1) Open the MLG doors (Ref. AMM TASK 32-12-00-010-001).
(2) Make sure that the 460005835 SLEEVE - GROUND LOCK is installed on the applicable MLG door actuating-cylinder.
Subtask 28-40-00-440-050-A
A. Reactivation of the APU LP Valve
(1) Do the reactivation procedure of the APU LP valve (Ref. AMM TASK 28-29-00-440-002).
5. Close-up(1) Do the reactivation procedure of the APU LP valve (Ref. AMM TASK 28-29-00-440-002).
Subtask 28-40-00-410-053-A Subtask 28-40-00-942-057-A
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the SAFETY BARRIERS.
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the SAFETY BARRIERS.
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.