W DOC AIRBUS | AMM A320F

Installation of the ACT Vent Shut-off Valve Actuator


TASK 28-28-55-400-001-A
Installation of the ACT Vent Shut-off Valve Actuator


WARNING: OBEY THE FUEL SAFETY PROCEDURES.
FIN: 4QH1 ** ON A/C NOT FOR ALL
FIN: 4QH2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
1
WARNING NOTICE(S)
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 28-00-00-910-001-A
Fuel Safety Procedures
TASK 28-11-27-000-001-A
Removal of the Additional Center Tank (ACT)
TASK 28-11-27-400-001-A
Installation of the Additional Center Tank (ACT)
TASK 28-11-49-000-001-A
Removal of the ACT Integrated Impact Wall
TASK 28-11-49-400-001-A
Installation of the ACT Integrated Impact Wall
TASK 28-25-00-710-003-A
Operational Test of the Refuel System
3. Job Set-up
Subtask 28-28-55-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
   (2) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (3) Make sure that the WARNING NOTICE(S) is in position on:
  • the refuel/defuel panel 801VU,
  • the fuel panel 40VU,
    to tell persons not to operate the refuel/defuel system.
Subtask 28-28-55-010-056-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Make sure that the integrated impact wall is removed from the aft cargo-compartment (Ref. AMM TASK 28-11-49-000-001).
Subtask 28-28-55-010-056-E ** ON A/C NOT FOR ALL
B. Get Access
   (1) Make sure that the integrated impact wall is removed from the aft cargo-compartment (Ref. AMM TASK 28-11-49-000-001), to get access to the actuator of the ACT2.
   (2) Make sure that the ACT2 is removed from the aft cargo-compartment (Ref. AMM TASK 28-11-27-000-001), to get access to the actuator of the ACT1.
Subtask 28-28-55-865-051-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUACT1/REFUEL & SPLY33QUL29
121VUFUEL/HI/LVL/SPLY1QJL25
121VUFUEL/RFL/DFL/SPLY2QUL24
121VUFUEL/RFL/DFL/XFR/DEFUEL/VALVE1QUL23
121VUACT XFR VALVE MAN CTL30QHN29
121VUACT1/CTL & SPLY9QHP29
121VUACT PUMP SUPPLY25QHQ29
4. Procedure
Subtask 28-28-55-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Actuator of the ACT Vent Shut-off Valve
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Put the actuator (1) in the correct installation position on the vent shut-off valve (4).
   (4) Make sure that the pin (7) is correctly aligned on the receptacles of the vent shut-off valve (4) and actuator (1).
NOTE: A wrong alignment of the actuator causes fault symptoms on the ACT system.
   (5) Install the clamp (3) on the base of the actuator and the vent shut-off valve (4).
   (6) Close the V-clamp (2) and tighten the screw (3).
   (7) Remove the CAP - BLANKING from the electrical connector (5) and the receptacle (6).
   (8) Make sure that all the electrical connections are clean and in the correct condition.
   (9) Connect the electrical connector (5) to the receptacle (6).
Subtask 28-28-55-865-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUACT1/REFUEL & SPLY33QUL29
121VUFUEL/HI/LVL/SPLY1QJL25
121VUFUEL/RFL/DFL/SPLY2QUL24
121VUFUEL/RFL/DFL/XFR/DEFUEL/VALVE1QUL23
121VUACT XFR VALVE MAN CTL30QHN29
121VUACT1/CTL & SPLY9QHP29
121VUACT PUMP SUPPLY25QHQ29
Subtask 28-28-55-710-050-A ** ON A/C NOT FOR ALL
C. Test
   (1) Do the Operational Test of the Refuel System (Ref. AMM TASK 28-25-00-710-003).
5. Close-up
Subtask 28-28-55-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the integrated impact wall in the aft cargo-compartment (Ref. AMM TASK 28-11-49-400-001).
Subtask 28-28-55-410-050-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the ACT2 in the aft cargo-compartment (Ref. AMM TASK 28-11-27-400-001).
   (2) Install the integrated impact wall in the aft cargo-compartment (Ref. AMM TASK 28-11-49-400-001).
Subtask 28-28-55-860-052-A ** ON A/C NOT FOR ALL
B. Put the aircraft back to the serviceable condition.
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the access platform(s).
   (3) Remove the WARNING NOTICE(S).
   (4) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.02 06:18:00 UTC