Removal of the ACT Vent Shut-off Valve Actuator
TASK 28-28-55-000-001-A
Removal of the ACT Vent Shut-off Valve Actuator
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 28-28-55-860-050-A ** ON A/C NOT FOR ALL
Subtask 28-28-55-020-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:18:00 UTC
Removal of the ACT Vent Shut-off Valve Actuator
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 1 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 28-11-27-000-001-A | Removal of the Additional Center Tank (ACT) |
| TASK 28-11-49-000-001-A | Removal of the ACT Integrated Impact Wall |
Subtask 28-28-55-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Energize the ground service network (Ref. AMM TASK 24-42-00-861-001).
(3) Put a WARNING NOTICE(S) in position on:
Subtask 28-28-55-865-050-A ** ON A/C NOT FOR ALL (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Energize the ground service network (Ref. AMM TASK 24-42-00-861-001).
(3) Put a WARNING NOTICE(S) in position on:
- the refuel/defuel panel 801VU,
- the fuel panel 40VU,
to tell persons not to operate the refuel/defuel system.
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 28-28-55-010-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | ACT1/REFUEL & SPLY | 33QU | L29 |
| 121VU | FUEL/HI/LVL/SPLY | 1QJ | L25 |
| 121VU | FUEL/RFL/DFL/SPLY | 2QU | L24 |
| 121VU | FUEL/RFL/DFL/XFR/DEFUEL/VALVE | 1QU | L23 |
| 121VU | ACT XFR VALVE MAN CTL | 30QH | N29 |
| 121VU | ACT1/CTL & SPLY | 9QH | P29 |
| 121VU | ACT PUMP SUPPLY | 25QH | Q29 |
C. Get Access
(1) Remove the integrated impact wall from the aft cargo-compartment (Ref. AMM TASK 28-11-49-000-001).
Subtask 28-28-55-010-051-B ** ON A/C NOT FOR ALL (1) Remove the integrated impact wall from the aft cargo-compartment (Ref. AMM TASK 28-11-49-000-001).
C. Get Access
(1) Get access to the actuator of the ACT2:
(a) Remove the integrated impact wall from the aft cargo-compartment (Ref. AMM TASK 28-11-49-000-001).
(2) Get access to the actuator of the ACT1:
(a) Remove the ACT2 from the aft cargo-compartment (Ref. AMM TASK 28-11-27-000-001).
4. Procedure(1) Get access to the actuator of the ACT2:
(a) Remove the integrated impact wall from the aft cargo-compartment (Ref. AMM TASK 28-11-49-000-001).
(2) Get access to the actuator of the ACT1:
(a) Remove the ACT2 from the aft cargo-compartment (Ref. AMM TASK 28-11-27-000-001).
Subtask 28-28-55-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Actuator of the ACT Vent Shut-off Valve
(1) Disconnect the electrical connector (5) from the receptacle (6).
(2) Put blanking caps on the disconnected electrical connector (5) and the receptacle (6).
(3) Loosen the screw (3), then open and remove the V-clamp (2) from the actuator (1).
(4) Remove the actuator (1) from the ACT vent shut-off valve (4).
(1) Disconnect the electrical connector (5) from the receptacle (6).
(2) Put blanking caps on the disconnected electrical connector (5) and the receptacle (6).
(3) Loosen the screw (3), then open and remove the V-clamp (2) from the actuator (1).
(4) Remove the actuator (1) from the ACT vent shut-off valve (4).
Actuator of the ACT Vent Shut-off Valve